# 001902754674
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-17, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punkta 1 ranee vydannogo predpisaniya 43181024023 ot 18022019Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniyavypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 001802062346
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punkta 1 ranee vydannogo predpisaniya ot 27072018 4318103924149 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 001800602157
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punktov 125 ranee vydannogo predpisaniya ot 16022018 4318103924034 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 162100076505
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Ministerstvo po delam grazhdanskoi oborony i chrezvychainym situaciyam Respubliki Tatarstan
Purpose of inspection: Cel: kontrol ispolneniya predpisaniya 10 marta 2020 goda № 35/4/8-5 po ustraneniyu narushenii ustanovlennyh trebovanii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii, so srokom ustraneniya k 13.03.2021g. Zadacha: proverka vypolneniya trebovanii i meropriyatii v oblasti zaschity naseleniya i territorii ot chrezvychainyh situacii prirodnogo i tehnogennogo haraktera ustanovlennyh zakonodatelstvom Rossiiskoi Federacii, zakonodatelstvom Respubliki Tatarstan, inymi normativnymi pravovymi aktami Rossiiskoi Federacii i Respubliki Tatarstan. Predmet proverki: vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya.
# 162004443743
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004370954
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004263773
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection:
# 162004312416
Unscheduled inspection
Start date: 2020-02-27, end date: 2020-02-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu ustanovleniya soblyudeniya trebovanii chasti 5 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii a tak zhe opredeleniya sootvetstviya vypolnennyh rabot primenyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa Rossiiskoi Federacii na osnovanii postupivshego v Inspekciyu izvescheniya o nachale stroitelstva obekta kapitalnogo stroitelstva ot 18022020 1697 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 161904073450
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: opredeleniya fakta ispolneniya predpisaniya ot 24092019g 1512029201 srok ispolneniya kotorogo istek 29112019 i sostavleniya akta po rezultatam proverki preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 161904074560
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: opredeleniya fakta ispolneniya predpisaniya ot 24092019 1512029101 srok ispolneniya kotorogo istek 29112019 i sostavleniya akta po rezultatam proverki preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 161904074866
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: opredeleniya fakta ispolneniya predpisaniya ot 24092019 1512029801 srok ispolneniya kotorogo istek 29112019 i sostavleniya akta po rezultatam proverki preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 161903950221
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for used energy resources verification of the construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 03102019 case 150420190042 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 001903761548
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-07, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punkta 1 ranee vydannogo predpisaniya 43181024099 ot 17062019Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 161903560983
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 17062019 case 150420190013 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 161903628804
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161903627502
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 07082019 case 150420190032 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 161903627297
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for used energy resources verification of the construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 07082019 case 150420190031 prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 161903252110
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 07082019 case 150420190033 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 161903250732
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902979741
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-08-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 07082019 case 150420190033 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 161902979530
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-08-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Opredelenie sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov proverka nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 31072019 delo 150420190028 preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii
# 161902979426
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-08-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Opredelenie sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov proverka nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 08082019 delo 150420190037 preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii
# 161902981056
Unscheduled inspection
Start date: 2019-08-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902980927
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of the compliance of the completed works applied during the construction and reconstruction of the capital construction facility of building materials and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 07082019 case 150420190032 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility
# 161902928682
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Opredelenie sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov proverka nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 31072019 delo 150420190028 preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii
# 161902981146
Unscheduled inspection
Start date: 2019-08-28, end date: 2019-08-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Opredelenie sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov proverka nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 08082019 delo 150420190036 preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam proektnoi dokumentacii
# 001902754674
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-17, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punkta 1 ranee vydannogo predpisaniya 43181024023 ot 18022019Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniyavypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 001902488668
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-18, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punkta 1 ranee vydannogo predpisaniya ot 12112018 43181024218 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 161902468238
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001802062346
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punkta 1 ranee vydannogo predpisaniya ot 27072018 4318103924149 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 161801585898
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-09-11, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: predostavlenie gosudarstvennoi uslugi po licenzirovaniyu deyatelnosti po montazhu tehnicheskomu obsluzhivaniyu i remontu sredstv obespecheniya pozharnoi bezopasnosti zdanii i sooruzhenii na osnovanii zayavleniya OOO «Aznakaevskii zavod Neftemash» ot 25072018 13928
# 001800602157
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya vypolneniya punktov 125 ranee vydannogo predpisaniya ot 16022018 4318103924034 Zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie kontrolya za prinyatymi yuridicheskimi licom merami po ispolneniyu predpisaniya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 16170803026217
Unscheduled inspection
Start date: 2017-12-21, end date: 2018-01-25, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: zaschity prav i interesov rabotnikov v svyazi s v svyazi s rassmotreniem obrascheniya ot 30112017g 7639917OB o narushenii trudovyh prav