# 742004374036
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-03-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work on the installation of floor slabs on otm h + 6300 in axes 24 on otm h +4690 +6340 + 6800 in axes 12 to the bricklaying of walls in axes 24 from m +3000 to +7140 in axes 12AB from m +2500 to the top of the parapets +3320 in axes 12BB1 from m +2500 to +8600 for the installation of brick partitions in axes 14 in the technical basement on the 1st and 2nd floors after completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004344184
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of the instruction from 03022020 2 The availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004212667
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903995861
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of foundations in axes 13AB1 with the installation of brickwork up to M0400 in axes 24 with the installation of floor slabs on m0400 in axes 24 with the installation of brickwork in axes 24 from m0400 to + 3000 after completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy requirements efficiency with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903698794
Unscheduled inspection
Start date: 2019-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902868811
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of asphalt concrete pavement from hot fine-grained asphalt concrete landscaping landscaping after completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741802298264
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the culvert of the bulk shoulders of the base of the ab coating of chips and fractionated crushed stone of outdoor lighting after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code Russian Federation
# 741802018453
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of embankments with the drainage system after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801460628
Unscheduled inspection
Start date: 2018-09-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802908446
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701742743
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-07-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site for the breakdown and removal of the axes of the structure in kind for the implementation of fire and sanitary epidemiological measures before the installation of the recessed part of the stands and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation