# 742101192577
Unscheduled inspection
Start date: 2021-10-14, end date: 2021-10-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on balancing railway tracks No.83 and 84 and transfer page No. 543, installation of dead-end stops of railway tracks No. 83 and 84, laying and embedding of switch No. 542, straightening and straightening of railway tracks No. 83 and 84 and page transfers No. 543 and 542, installation of lighting, polishing of rails, construction of facilities for cleaning, accumulation and pumping of surface water, installation of lighting. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101243279
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on balancing railway tracks No.83 and 84 and translation page No. 543, installation of dead-end stops of railway tracks No. 83 and 84, laying and embedding of switchboard No. 542, balancing of switchboard, straightening and straightening of railway tracks No. 83 and 84 and pages of translations No.543 and 542, installation of lighting, grinding of rails, construction of facilities for cleaning, accumulation and pumping of surface water, installation of lighting and building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work to the requirements approved in accordance with parts 15, 15.2 and 15.3 of the article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (except for with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100294291
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on balancing railway tracks No.83 and 84 and translation page No. 543, the arrangement of dead-end stops of railway tracks No. 83 and 84 (after completion of work), the arrangement of dead-end stops of railway tracks No.83 and 84, laying and inset switch transfer No. 542, balancing of the switch, straightening and straightening of railway tracks No.83 and 84 and pages of transfers No.543 and 542, installation of lighting, grinding of rails, construction of facilities for cleaning, accumulation and pumping of surface water (during work) and used building materials during construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100194492
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on balancing railway tracks No.83 and 84 and transfer page No. 543, the installation of dead-end stops of railway tracks No. 83 and 84 (after completion of work), laying and embedding switch No. 542, balancing switch (during work) and the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information requirements of the construction materials used in the construction, reconstruction of the capital construction facility, as well as the results of such work. models (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100151680
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on balancing railway tracks No.83 and 84 and translation page No. 543, installation of dead-end stops of railway tracks No. 83 and 84 (during the work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100019748
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742105305523
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on : the development of a excavation for the construction of an earthen bed, the construction of an earthen bed (during the work) and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 741800362315
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-06-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802712505
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-10-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work installation of a high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701435400
Unscheduled inspection
Start date: 2017-01-17, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: Verification of compliance of Uralremmash LLC employees with the conditions of the territories of buildings, structures, premises, equipment, and similar vehicles used by Uralremmash LLC in the course of their activities