Found 4 inspections:

# 742005228312
Unscheduled inspection
Start date: 2020-11-18, end date: 2020-11-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the pressure part of the KN1 collector and passages under roads and artificial structures using the HDD method with the laying of cases for the installation of the buried part of the KNS for the installation of the aboveground pavilion and fencing of the KNS for the commissioning of the KNS and hydraulic tests of pressure and non-pressure pipelines and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy requirements efficiency with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004443293
Unscheduled inspection
Start date: 2020-07-02, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903120472
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-09-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of Finishing works installation of floors plaster grout putty painting installation of doors, etc. With the installation of internal engineering networks water supply sanitation heating ventilation electricity electric lighting automatic fire alarm Landscaping and construction materials used during the construction of a capital construction facility as well as the results of such work with project documentation2 Availability of a construction permit3 Meeting the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741902939272
Unscheduled inspection
Start date: 2019-08-16, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.