Found 14 inspections:

# 742101415022
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 742101260255
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. The line of works on the building of the boiler house: device, vertical and horizontal walling, floor finishing device, the installation ITO, installation of CCTV system, installation of the automation system, internal power supply and outdoor lighting, installation of mechanical equipment (in the process of execution of works); administrative and amenity building: construction works, installation of fire alarm systems, installation of heating systems and ventilation systems, installation of internal power supply, installation of domestic water supply and sanitation (in the process of execution of works); installation of tanks and piping of water supply, installation of chimneys, installation CTU installation of drainage of diesel fuel and sewage treatment plants, the installation of lightning protection and grounding (after completion), device external networks of water supply, Sewerage and sewage pumping system, heat supply, gas supply, electricity and communication networks, improvement and gardening of the territory (in the process of work) and construction materials used in the process of construction, reconstruction of capital construction object, as well as the results of such work requirements approved in accordance with parts 15, 15.2 and 15.3 of article 48 of this Code project documentation (including changes included in the project documentation in accordance with paragraphs 3.8 and 3.9 of article 49 of the Code) and (or) information model (in the case that the formation and maintenance of information models are required in accordance with the requirements of this Code), including the requirements for energy efficiency (with the exception of capital construction objects, for which the energy performance requirements do not apply) and the requirements of the equipment of a capital construction object metering devices of energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100543667
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 742100850285
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-10-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. The line of works on the building of the boiler: installation of metal structures of the frame (after completion), the device vertical and horizontal walling, floor finishing device, the installation ITO, installation of CCTV system, installation of the automation system, internal power supply and outdoor lighting, installation of mechanical equipment (in the process of execution of works); administrative and amenity building: construction works, installation of fire alarm systems, installation of heating systems and ventilation systems, installation of internal power supply, installation of domestic water supply and sanitation (in the process of execution of works); installation of tanks and piping of water supply, the installation of lightning protection and grounding, installation of chimneys, installation of KTP, installation of drainage diesel and treatment plants, device external networks of water supply, Sewerage and sewage pumping system, heat supply, gas supply, electricity and communication networks (the works) and construction materials used in the process of construction, reconstruction of capital construction object, as well as the results of such work requirements approved in accordance with parts 15, 15.2 and 15.3 of article 48 of this Code project documentation (including changes to the project documentation in accordance with paragraphs 3.8 and 3.9 of article 49 of the Code) and (or) information model (in the case that the formation and maintenance of information models are required in accordance with the requirements of this Code), including the requirements for energy efficiency (with the exception of capital construction objects, for which the energy performance requirements do not apply) and the requirements of the equipment of a capital construction object metering devices of energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100405613
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-08-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the boiler house building: installation of foundations (in the process of work); ABC building: general construction work, installation of security and fire alarm systems, installation of heating and ventilation systems, installation of internal power supply, installation of internal water supply and sanitation (in the process of work); installation of reservoirs and laying of water supply pipelines, the lightning protection and grounding device (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100343595
Unscheduled inspection
Start date: 2021-07-19, end date: 2021-07-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the construction and installation works of the boiler house building, finishing works, construction and installation works of the ABC building, the installation of internal gas supply networks, internal water supply and sewerage networks, heating and ventilation networks, internal backup fuel supply networks, the installation of a cooling well (during the work), the installation of boilers, the installation of pumping equipment, installation of heat exchange equipment, installation of water storage tanks, installation of diesel fuel storage tanks and laying of diesel fuel pipelines (during work) and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities which are not covered by energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100261280
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration:
Authority:
Purpose of inspection:


# 742100299985
Unscheduled inspection
Start date: 2021-06-28, end date: 2021-07-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the construction and installation works of the boiler house building, installation of burner devices, construction and installation works of the ABC building (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (except for capital construction facilities that are not covered by energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100194480
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on : preparatory work, work on the removal of the existing pressure collector, excavation work, construction and installation work of the boiler house building (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 502004293002
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 641902539952
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v Saratovskoi oblasti
Purpose of inspection:


# 661800166955
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-07, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805423 dated November 24, 2017 with a deadline for eliminating violations on February 20, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805423 dated November 24, 2017


# 66170802630915
Unscheduled inspection
Start date: 2017-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 66170701774606
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-20, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805227 dated May 26, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291805227 dated May 26, 2017


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.