Found 28 inspections:

# 00160700868178
Unscheduled inspection
Start date: 2016-09-30, end date: 2016-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700867043
Unscheduled inspection
Start date: 2016-09-30, end date: 2016-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700088265
Unscheduled inspection
Start date: 2016-08-31, end date: 2016-09-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700088255
Unscheduled inspection
Start date: 2016-08-31, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 00160700085349
Unscheduled inspection
Start date: 2016-08-31, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 00160700085342
Unscheduled inspection
Start date: 2016-08-31, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 16170802748504
Unscheduled inspection
Start date: 2017-10-18, end date: 2017-10-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenennyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na etape zaversheniya a takzhe s celyu sostavleniya akta proverki zakonchennogo stroitelstvom obekta v sootvetstvii s postupivshim v Inspekciyu izvescheniem ot 11102017 8212 ob okonchanii stroitelstva obekta kapitalnogo stroitelstva preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 16170802749422
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 77170802118319
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection:


# 16160701074508
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 15072016 delo 181820160007preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciisoblyudenie obyazatelnyh trebovanii


# 16160701075231
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnennyh rabot primenennyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo Kodeksa RF v sootvetstvii s programmoi proverok ot 15072016 delo 181820160006preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciisoblyudenie obyazatelnyh trebovanii


# 16160700090831
Unscheduled inspection
Start date: 2016-09-01, end date: 2016-09-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya fakta ispolneniya predpisaniya ot 26072016 1819005701 srok ispolneniya kotorogo istek 26082016 i sostavleniya akta po rezultatam proverkipreduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


# 16160700090880
Unscheduled inspection
Start date: 2016-09-02, end date: 2016-09-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya fakta ispolneniya predpisaniya ot 28072016 1819005801 srok ispolneniya kotorogo istek 29082016 i sostavleniya akta po rezultatam proverkipreduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


# 16160701047632
Unscheduled inspection
Start date: 2016-09-09, end date: 2016-09-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnyaemyh rabot primenyaemyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii postupivshego v Inspekciyu izvescheniya ot 01092016 7574 o srokah zaversheniya rabot kotorye podlezhat proverke na obekte kapitalnogo stroitelstva preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciisoblyudenie obyazatelnyh trebovanii


# 16160700158140
Unscheduled inspection
Start date: 2016-09-08, end date: 2016-09-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Proverka provoditsya s celyu opredeleniya sootvetstviya vypolnyaemyh rabot primenyaemyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii postupivshego v Inspekciyu izvescheniya ot 01092016 7573 o srokah zaversheniya rabot kotorye podlezhat proverke na obekte kapitalnogo stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 16160700929144
Unscheduled inspection
Start date: 2016-09-28, end date: 2016-09-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu opredeleniya sootvetstviya vypolnyaemyh rabot primenyaemyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii postupivshego v Inspekciyu izvescheniya ot 16092016 8075 o srokah zaversheniya rabot kotorye podlezhat proverke na obekte kapitalnogo stroitelstvapreduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii


# 00160700868178
Unscheduled inspection
Start date: 2016-09-30, end date: 2016-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700867043
Unscheduled inspection
Start date: 2016-09-30, end date: 2016-10-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700088265
Unscheduled inspection
Start date: 2016-08-31, end date: 2016-09-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700088255
Unscheduled inspection
Start date: 2016-08-31, end date: 2016-09-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700085349
Unscheduled inspection
Start date: 2016-08-31, end date: 2016-09-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00160700085342
Unscheduled inspection
Start date: 2016-08-31, end date: 2016-09-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 16160601747645
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-07-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Proverka provoditsya s celyu ustanovleniya soblyudeniya trebovanii chasti 5 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii na osnovanii postupivshego v Inspekciyu izvescheniya o nachale stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 15062016 5832Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 16160601738063
Unscheduled inspection
Start date: 2016-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 16160601747686
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-07-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Proverka provoditsya s celyu ustanovleniya soblyudeniya trebovanii chasti 5 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii na osnovanii postupivshego v Inspekciyu izvescheniya o nachale stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 15072016 5833Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 16160601739354
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-07-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ustanovleniya soblyudeniya trebovanii chasti 5 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii na osnovanii postupivshego v Inspekciyu izvescheniya o nachale stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 15062016 5832preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentaciisoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 14160601739666
Unscheduled inspection
Start date: 2016-07-18, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14160601739751
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: determination of the compliance of the constructed completed facility with the requirements of technical regulations design standards and project documentation verification of compliance with previously issued regulations prevention of the threat of harm during unscheduled inspections conducted on violations involving the threat of harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites of the peoples of the Russian Federation, property of individuals and legal entities, state security as well as threats of natural and man-made emergencies, prevention, detection and suppression of violations of urban planning legislation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation on the conformity of work performed and construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such works meet the requirements of technical regulations, other regulations and design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation.