Found 5 inspections:

# 622101429575
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation


# 622101402565
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation


# 622101388617
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: verification of the execution of regulation No. GE-13 dated 10/22/2021 on the elimination of violations


# 622101237586
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration:
Authority:
Purpose of inspection:


# 622105323521
Unscheduled inspection
Start date: 2021-01-26, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.