# 672101404581
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: The purpose of this inspection is to carry out regional state construction supervision in the Smolensk Region, in accordance with the inspection program dated May 28, 2021.
The subject of this review is the review:
– compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved by the developer, the technical customer, the person responsible for the operation of the building, structure, or the regional operator of the project documentation and (or) the information model (if the formation and maintenance of information models are mandatory);
– compliance with the requirement for a construction permit, as well as the parameters of the capital construction facility under construction, specified in the construction permit.;
– membership in a self-regulatory organization in the field of construction;
– ensuring the conservation of the capital construction facility if it is necessary to stop work or suspend it for more than six months.;
– requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 672101220427
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: The purpose of this inspection is to carry out regional state construction supervision in the Smolensk Region, in accordance with the inspection program dated May 22, 2020.
The subject of this review is the review:
– compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved by the developer, the technical customer, the person responsible for the operation of the building, structure, or the regional operator of the project documentation and (or) the information model (if the formation and maintenance of information models are mandatory);
– compliance with the requirement for a construction permit, as well as the parameters of the capital construction facility under construction, specified in the construction permit.;
– membership in a self-regulatory organization in the field of construction;
– ensuring the conservation of the capital construction facility if it is necessary to stop work or suspend it for more than six months.;
– requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 672101220415
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 672101220413
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: The purpose of this inspection is to carry out regional state construction supervision in the Smolensk Region, in accordance with the inspection program dated May 22, 2020.
The subject of this review is the review:
– compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved by the developer, the technical customer, the person responsible for the operation of the building, structure, or the regional operator of the project documentation and (or) the information model (if the formation and maintenance of information models are mandatory);
– compliance with the requirement for a construction permit, as well as the parameters of the capital construction facility under construction, specified in the construction permit.;
– membership in a self-regulatory organization in the field of construction;
– ensuring the conservation of the capital construction facility if it is necessary to stop work or suspend it for more than six months.;
– requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 672100667711
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: It is carried out for the purpose of: implementation of regional state construction supervision in the territory of the Smolensk region, in accordance with the inspection program dated February 06, 2020.
The subject of this review is the review:
– compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved by the developer, the technical customer, the person responsible for the operation of the building, structure, or the regional operator of the project documentation and (or) the information model (if the formation and maintenance of information models are mandatory);
– compliance with the requirement for a construction permit, as well as the parameters of the capital construction facility under construction, specified in the construction permit;
– membership in a self-regulatory organization in the field of construction;
– ensuring the conservation of the capital construction facility, if necessary, the termination of work or their suspension for more than six months;
– requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 672100908701
Unscheduled inspection
Start date: 2021-09-24, end date: —, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: The purpose of this inspection is to carry out regional state construction supervision in the Smolensk Region, in accordance with the inspection program dated May 28, 2021.
The subject of this review is the review:
– compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved by the developer, the technical customer, the person responsible for the operation of the building, structure, or the regional operator of the project documentation and (or) the information model (if the formation and maintenance of information models are mandatory);
– compliance with the requirement for a construction permit, as well as the parameters of the capital construction facility under construction, specified in the construction permit.;
– membership in a self-regulatory organization in the field of construction;
– ensuring the conservation of the capital construction facility if it is necessary to stop work or suspend it for more than six months.;
– requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 672100399635
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration: 3
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This check is carried out for the purpose of: checking the fulfillment of Regulation No. 04-010/P dated 06/22/2021.
The objectives of this review are:
- compliance by the developer with the requirements of Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared Construction of Apartment Buildings and (or) Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and other regulatory legal acts in the field of shared construction of apartment buildings and (or) other real estate objects on the territory of the Smolensk Region regions.
The subject of this review is the review:
- execution of Regulation No. 04-010/P dated 06/22/2021, issued by the Department of Gosstroytechnadzor of the Smolensk region.
# 672100293113
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 6
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: identification of circumstances containing signs of violations of the mandatory requirements of Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared Construction of Apartment Buildings and (or) Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" (hereinafter - Federal Law No. 214-FZ dated 12/30/2004) and which caused the developer's deviation from an approximate schedule for the implementation of a construction project for six months or more, presented as part of the quarterly reports for the 4th quarter of 2020 and the 1st quarter of 2021 for the facilities: "Adjustment of the working draft of a 166-apartment residential building in the MKRN. "Severny" in Gagarin, Smolensk region, for a residential building of variable storeys (5,7,9 floors), the 2nd and 3rd stages of construction of the block section № 5 - № 6, № 7 - № 8", located at the address Smolensk region, Gagarin district, Gagarin lane. Pionersky, 10, "Multi-storey residential building at the address: Smolensk, mkrn. Semichevka, 2nd Kievskaya Street - Gagarin Ave., residential buildings No. 1,2. II, III stage of construction – residential building No. 2", located at the address: Smolensk region, Smolensk, Semichevka residential complex of the south-eastern district, 2nd Kievskaya ave. Gagarin, verification of documents for compliance with the requirements of the above-mentioned law, etc.
The objectives of this audit are: compliance by the developer with the requirements of legislation in the field of shared-equity construction of apartment buildings and (or) other real estate objects in the Smolensk region (and other regulatory legal acts), and suppression of violations of the requirements of the specified legislation.
# 672100293112
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 6
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: identification of circumstances containing signs of violations of the mandatory requirements of Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared Construction of Apartment Buildings and (or) Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" (hereinafter - Federal Law No. 214-FZ dated 12/30/2004) and which caused the developer's deviation from an approximate schedule for the implementation of a construction project for six months or more, presented as part of the quarterly reports for the 4th quarter of 2020 and the 1st quarter of 2021 for the facilities: "Adjustment of the working draft of a 166-apartment residential building in the MKRN. "Severny" in Gagarin, Smolensk region, for a residential building of variable storeys (5,7,9 floors), the 2nd and 3rd stages of construction of the block section № 5 - № 6, № 7 - № 8", located at the address Smolensk region, Gagarin district, Gagarin lane. Pionersky, 10, "Multi-storey residential building at the address: Smolensk, mkrn. Semichevka, 2nd Kievskaya Street - Gagarin Ave., residential buildings No. 1,2. II, III stage of construction – residential building No. 2", located at the address: Smolensk region, Smolensk, Semichevka residential complex of the south-eastern district, 2nd Kievskaya ave. Gagarin, verification of documents for compliance with the requirements of the above-mentioned law, etc.
The objectives of this audit are: compliance by the developer with the requirements of legislation in the field of shared-equity construction of apartment buildings and (or) other real estate objects in the Smolensk region (and other regulatory legal acts), and suppression of violations of the requirements of the specified legislation.
# 672100314429
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: – this inspection is conducted for the purpose of: implementation of regional state construction supervision in the territory of the Smolensk region, in accordance with the inspection program dated February 06, 2020;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used;
– availability of a building permit;
– membership in a self-regulatory organization in the field of construction.
# 672100106409
Unscheduled inspection
Start date: 2021-04-02, end date: 2021-04-07, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted for the purpose of: implementation of regional state construction supervision in the territory of the Smolensk region, in accordance with the inspection program dated July 08, 2020;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 672100078967
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-03-24, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted for the purpose of: implementation of regional state construction supervision in the Smolensk region, in accordance with the inspection program dated February 06, 2020;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 672100087084
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-03-31, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted for the purpose of: carrying out regional state construction supervision in the Smolensk Region, in accordance with the inspection program dated May 22, 2020;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 672100087085
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-03-31, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted for the purpose of: carrying out regional state construction supervision in the Smolensk Region, in accordance with the inspection program dated May 22, 2020;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 672005273075
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-18, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated November 06, 2019. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for energy resources used are also excluded.
# 672005285077
Unscheduled inspection
Start date: 2020-12-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672005285071
Unscheduled inspection
Start date: 2020-12-22, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 672005255569
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 672005255567
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-09, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated May 22, 2020. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for energy resources used are also excluded.
# 672005293838
Unscheduled inspection
Start date: 2020-12-28, end date: 2020-12-30, duration: 3
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated November 06, 2019. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for energy resources used are also excluded.
# 672005151254
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-07, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated February 06, 2020. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for energy resources used are also excluded.
# 672004469476
Unscheduled inspection
Start date: 2020-07-28, end date: 2020-07-31, duration: 4
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated February 06, 2020. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for energy resources used are also excluded.
# 672004461821
Unscheduled inspection
Start date: 2020-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672004415217
Unscheduled inspection
Start date: 2020-05-22, end date: 2020-05-27, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated November 06, 2019. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for used energy resources are also excluded.
# 672004414118
Unscheduled inspection
Start date: 2020-05-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672004409588
Unscheduled inspection
Start date: 2020-05-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672004409587
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-05-22, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated May 08, 2019. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not covered by energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources
# 672004387995
Unscheduled inspection
Start date: 2020-04-07, end date: 2020-04-10, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated November 06, 2019. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources
# 672004355659
Unscheduled inspection
Start date: 2020-03-13, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 672004355655
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-03-18, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated May 08, 2019. The purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements, with the exception of facilities capital construction projects that are not covered by energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 672004297903
Unscheduled inspection
Start date: 2020-02-19, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 672004205561
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-22, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated May 08, 2019. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not covered by energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources
# 672004205556
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-22, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated May 08, 2019. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not covered by energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources
# 672004215926
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671904111121
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-20, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated April 23, 2019.7 The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for energy resources used are also excluded.
# 671903988752
Unscheduled inspection
Start date: 2019-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671904031400
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-04, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated November 06, 2019. The objectives of this inspection are to prevent and suppress violations of urban planning legislation, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer and project documentation
# 671904031396
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-04, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated November 06, 2019. The objectives of this inspection are to prevent and suppress violations of urban planning legislation, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer and project documentation
# 671903898645
Unscheduled inspection
Start date: 2019-10-25, end date: 2019-10-30, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated May 08, 2019. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671903898641
Unscheduled inspection
Start date: 2019-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671903863464
Unscheduled inspection
Start date: 2019-10-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671903863460
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-23, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated February 05, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671903587690
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-23, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated February 05, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671902956294
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-23, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: The purpose is to carry out regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated August 24, 2018The tasks are to prevent and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer
# 671902956344
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-23, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: The purpose is to carry out regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated August 06, 2018The tasks are to prevent and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer
# 671902918397
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-07, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated May 08, 2019The objectives of this inspection are to prevent and suppress violations of urban planning legislation by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the contractor, including technical regulations and design documentation. Documentation
# 671902918390
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-07, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated May 08, 2019The objectives of this inspection are to prevent and suppress violations of urban planning legislation by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the contractor, including technical regulations and design documentation. Documentation
# 671902882406
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-07-24, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated July 31, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671902882402
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671902725645
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-27, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated February 05, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671902728563
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-05-28, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to verify the implementation of regulation 02109p dated February 26, 2019. The objectives of this audit are to prevent and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor, including technical regulations and project documentationthe subject of this audit is to note the necessary verification of compliance with regulation 02109p dated February 26. February 2019 issued by the Department of State Construction and Technical Supervision of the Smolensk Region
# 671902728562
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671902656754
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-04-22, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated July 31, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671902656748
Unscheduled inspection
Start date: 2019-04-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671902627495
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-11, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated August 06, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671902516558
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671902526954
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 671902516561
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 671902526959
Unscheduled inspection
Start date: 2019-02-22, end date: 2019-02-27, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated July 31, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671802341657
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-28, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated July 31, 2018. The objectives of this inspection are to prevent and suppress violations of urban planning legislation, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671802341635
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-28, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated June 21, 2018. The objectives of this inspection are to prevent and suppress violations of urban planning legislation, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671802357482
Unscheduled inspection
Start date: 2018-12-26, end date: 2018-12-29, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated August 24, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671802043246
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671802075687
Unscheduled inspection
Start date: 2018-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671802075680
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-11-13, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated August 24, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations and regulations, committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer. project documentation
# 671802027823
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-02, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated July 31, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671802027816
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-02, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated June 21, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671801982000
Unscheduled inspection
Start date: 2018-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671801716896
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-09-28, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated February 05, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer and project documentation
# 671800558679
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-23, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated February 05, 2018, prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer
# 671800580954
Unscheduled inspection
Start date: 2018-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671800531133
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-09, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: verification of the implementation of regulation 02212p dated May 08, 2018, prevention and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including technical regulations and project documentation, compliance with regulation 02212p dated May 08, 2018 issued by the Department of State Construction and Technical Supervision of the Smolensk Region
# 671800342633
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-08, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the Smolensk Region in accordance with the inspection program dated February 05, 2018the prevention and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer
# 001800368640
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-04-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted on the basis of a reasoned submission by AE Eliseeva, Deputy Head of the Central Department of Rostechnadzor, dated 26042018 12 141753, on the need for an unscheduled on-site inspection of Console LLC based on the results of an analysis of information posted on the Internet httpswwwvestirudochtmlid=30101373010137 httprentvnovosti20180423videovsmolenskeupalpodemnyykran httpswww5tvrunews198787 upon the occurrence of an accident and the fall of a lifting crane at Odintsovo, Smolensk, Smolensk region. The purpose of this audit is to prevent, identify and suppress violations of industrial safety requirements during the operation of a hazardous production facility using lifting cranes of Console LLC. The subject of this audit is compliance by a legal entity, its head and other officials in the process of carrying out activities in the field of industrial safety with the requirements established by Federal Law 116FZ, other federal laws and other regulatory acts adopted in accordance with them. legal acts of the Russian Federation in the field of industrial safety, as well as compliance with the specified requirements of the buildings, premises, structures, technical devices, equipment, materials and ongoing technological processes
# 001800340528
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-04-28, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted on the basis of a reasoned submission by AE Eliseeva, Deputy Head of the Central Department of Rostechnadzor, dated 26042018 12 141753, on the need for an unscheduled on-site inspection of Console LLC based on the results of an analysis of information posted on the Internet httpswwwvestirudochtmlid=30101373010137 httprentvnovosti20180423videovsmolenskeupalpodemnyykran httpswww5tvrunews198787 upon the occurrence of an accident and the fall of a lifting crane at Odintsovo, Smolensk, Smolensk region. The purpose of this audit is to prevent, identify and suppress violations of industrial safety requirements during the operation of a hazardous production facility using lifting cranes of Console LLC. The subject of this audit is compliance by a legal entity, its head and other officials in the process of carrying out activities in the field of industrial safety with the requirements established by Federal Law 116FZ, other federal laws and other regulatory acts adopted in accordance with them. legal acts of the Russian Federation in the field of industrial safety, as well as compliance with the specified requirements of the buildings, premises, structures, technical devices, equipment, materials and ongoing technological processes
# 671800089801
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-26, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk Region in accordance with the inspection program dated February 05, 2018, prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer
# 67170802756176
Unscheduled inspection
Start date: 2017-10-20, end date: 2017-10-25, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated January 09, 2017, prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer
# 67170801933641
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 67170701803226
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 67170701445526
Unscheduled inspection
Start date: 2017-03-09, end date: 2017-03-13, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: verification of compliance with regulation 020021P dated 29112016
# 67160701031759
Unscheduled inspection
Start date: 2016-10-18, end date: 2016-11-15, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: verification of the reliability of the facts stated in the quarterly reports