# 742101420239
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on biological wastewater treatment plants of the second stage. Block of secondary settling tanks of the second stage (distribution bowl, secondary settling tanks, sludge chamber): dismantling, reconstruction and installation of technological equipment, electrical installation at settling tanks No. 71,72,73,74 and construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including the requirements of the energy energy efficiency (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742101243314
Unscheduled inspection
Start date: 2021-10-25, end date: 2021-11-09, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the roof installation, construction of external water supply networks and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100554819
Unscheduled inspection
Start date: 2021-09-29, end date: 2021-10-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on biological wastewater treatment plants of the second stage. Block of aerotanks of the II stage (aerotanks, silt chamber): Installation of technological equipment and pipelines of the aeration tank in the axes 'A' - 'G': a centrifugal vane pumping unit with an installation system, a 10 m cable, a stirrer with an installation system, a 10 m cable, a control and regulation cabinet, aeration system based on tubular aerators, a flat dimensional gate, flanged fittings with electric drive, pipeline d 159 mm, bends, welded nipples, priming of metal surfaces, painting of metal surfaces, pipeline d 630 mm, flanges made of corrosion-resistant steel, non-return valve, rotary disc gate, sliding and wheeled flat gate. Electrical installation, electric lighting, installation of a structured cabling network. Biological wastewater treatment plants of the second stage. Block of secondary settling tanks of the second stage (distribution bowl, secondary settling tanks, silt chamber): Dismantling works: ladders in silt chambers, shield closures, protective grille of the discharge pocket, mounting plate on the sides of settling tanks No. 71,72,73,74. Construction and installation works: restoration of the side of the settling tank, removal of cracks, restoration of the protective layer of concrete overflow tray, restoration of anti-corrosion coatings of embedded parts of the settling tank, restoration of the protective layer of concrete of the inner surfaces of the wall panels of the settling tanks No.71,72,73,74. Construction and installation work: removal of cracks up to 3 mm in the concrete of the bottom and sealing the seams between the elements of the settling tank, restoration of the protective layer of plaster of the bottom of the settling tanks No.71,72,73,74. Construction and installation work: installation of the concrete blind area of the settling tanks No.71,72,73,74 Construction and installation work: restoration of the protective layer of concrete of the silt chambers of the settling tanks No.71,72,73,74. Construction and installation work: restoration of anti-corrosion
# 742100385438
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100207421
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, dismantling works and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100024135
Unscheduled inspection
Start date: 2021-02-25, end date: 2021-03-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on landscaping of the construction site, installation of hydraulic fracturing and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for used energy resources;
2. Availability of a building permit.
3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742105309497
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the preparation of the construction site in accordance with section PIC and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005255249
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of a trench, the installation of a low-pressure gas pipeline and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 The implementation of requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005235912
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-11-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the works on the improvement of the construction site with the installation of GRPS and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005193784
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005147188
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004474211
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the works on the improvement of the construction site with the installation of the GRPS PGB and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004443488
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a medium-pressure gas pipeline and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 742004427189
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-06-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904033728
Unscheduled inspection
Start date: 2019-12-06, end date: 2020-01-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904096374
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a high-pressure gas pipeline to the PGB1 device and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904045834
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the gas pipeline along Partizanskaya Street, Beregovaya Street, the installation of supply lines to residential buildings and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903857864
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the PK38PK3 gas pipeline installation and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information model in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741903643688
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying the PK73PK38 gas pipeline and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information model in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741903572592
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902924320
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of PHB in the course of work, the strapping of PHB, the lightning protection device for electricity supply in the course of work, the painting of an above-ground gas distribution pipeline in the course of work, the leakproofness tests of high and low pressure gas pipelines in the course of work, the restoration of landscaping of the construction site after completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902939920
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902978805
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902975140
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902978358
Unscheduled inspection
Start date: 2019-08-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902861043
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the organization of the construction site according to the project breakdown of the high and low pressure gas pipeline route installation of high and low pressure gas pipeline sections development of a trench foundation installation welding insulation of joints laying of the pipeline laying of cases backfilling installation during work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902868461
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902819665
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline trench development foundation installation welding insulation of joints pipeline laying backfilling installation during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902887668
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902883550
Unscheduled inspection
Start date: 2019-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902795699
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-06-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the route, the development of a trench, the installation of a bed, the laying of a high-pressure gas pipeline pipe, a low-pressure gas pipeline along Molodezhnaya Znamenskaya 50 let Pobedy Street during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902764209
Unscheduled inspection
Start date: 2019-06-06, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902697229
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the performance of work verification of the completed construction of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902634657
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-04-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the work performed, the exterior finish, the ventilated facade after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the design documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902501510
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with fire-fighting and sanitary-epidemiological measures after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902526103
Unscheduled inspection
Start date: 2019-02-28, end date: 2019-03-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the backfilling work with the installation of GRPB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802282152
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed exterior decoration ventilated facade during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741802133561
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying the gas pipeline pipe and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741802031208
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of brick walls partitions and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802031157
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802085863
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal ventilation systems after completion of the work, Exterior decoration, ventilated facade during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801947181
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal water supply and sanitation systems after completion of the work, the installation of internal heating and lighting systems after completion of the work, ventilation during the work, the installation of porches, landscaping, outdoor lighting and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 741801876586
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801878537
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the installation of a high-pressure pipeline, the installation of a low-pressure steel pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801263360
Unscheduled inspection
Start date: 2018-09-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801117623
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work internal finishing works after completion of the work the installation of internal water supply and sanitation systems during the work the installation of internal heating and ventilation systems during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801119796
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801523748
Unscheduled inspection
Start date: 2018-09-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800662198
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying the gas pipeline along Uralskaya Pobedy Kosmonavtov Vernalnaya Zarechnaya Street with the installation of the GRPS and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 Art 52 of the Urban Planning Code of the Russian Federation
# 741800605403
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performance internal finishing works during the work the installation of internal water supply, drainage, heating, ventilation during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800637646
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800565202
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800496236
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying the gas pipeline along Ostrovsky Street Mira Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 741800525420
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800500010
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800423139
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the basin arrangement in axes 112 as well as the construction materials used during the construction of a capital construction facility and the results of such work with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800445596
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work general construction work punching of additional window openings sealing of openings installation of internal partitions installation of evacuation ladders from the 2nd floor after completion of work installation of external power supply networks and internal power supply systems after completion of work installation of external water supply and sanitation networks during work internal finishing works during work and applied building materials during construction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800359672
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work execution general construction work punching additional window openings sealing holes installation of internal partitions installation of escape ladders from the 2nd floor during the work installation of external power supply networks and internal power supply systems during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800375901
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on meeting the requirements of fire and sanitary and epidemiological standards for the installation of external water supply and sewerage networks of internal engineering networks of materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800102162
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800068628
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-02-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of heating networks of outdoor water supply networks of the chimney block Thermal insulation work of heating networks Installation of a gas boiler room Installation of a diesel power plant Electrical work Verification of compliance with sanitary and epidemiological requirements and fire safety of building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170803015310
Unscheduled inspection
Start date: 2017-12-27, end date: 2018-01-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the gas pipeline installation work with the installation of a gas turbine unit and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of parts 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170802906773
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802998926
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on laying the gas pipeline pipe, backfilling and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802966880
Unscheduled inspection
Start date: 2017-12-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802977810
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802977140
Unscheduled inspection
Start date: 2017-12-15, end date: 2017-12-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an external underground high-pressure gas distribution pipeline, the installation and strapping of the GRPB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802933496
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on filling and painting the ice field installation of air ducts installation of supply air chambers installation of equipment in the ventilation system after the actual completion of work Installation of switches sockets of lamps in suspended ceilings installation of light wall switches Installation of hot water supply system T3T4 after the actual completion of work Implementation of automation after the actual completion of work Commissioning Compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802926911
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802927039
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of an aboveground low-pressure steel gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802773109
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802877870
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the installation of technological equipment, compliance with fire and sanitary epidemiological measures, measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802815367
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802877745
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of electric lighting of the ice field, the installation of internal telephony radio and television networks, the sound amplification system, the installation of internal heating and ventilation networks, the installation of external communication networks, on-site communication networks and video surveillance, the installation of small forms of landscaping, the installation of air ducts, the installation of supply air chambers, the installation of indoor ventilation systems, decorative lighting of the facade, the installation of sinks, washbasins, toilet bowls, the implementation of AVC automation implementation of automation AOV installation of fencing landscaping fire alarm system for the installation of a hot water supply system T3T42 Receipt of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802873253
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed with the installation of an underground pipeline made of polyethylene pipes and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802836117
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of silt sites of the materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802839909
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work excavation on a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802772951
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741978
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-10-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation and strapping of the GRPS and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802743458
Unscheduled inspection
Start date: 2017-10-18, end date: 2017-10-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of performance Execution of exterior finishing works installation of floors after the actual completion of work heating of the ice field laying of pipelines of the heating system with installation of devices in the course of work installation of pipelines of heating and water supply with installation of devices, etc. in the course of work laying of air ducts installation of nodes of passage of exhaust ventilation shafts of the smoke extraction system in the course of work execution of automation AVK laying of power cables for electrical installations installation of panels, control panels and alarm devices after the actual completion of work installation of power equipment work on the facade lighting installation of floodlights installation of internal heating networks, ventilation networks, fire alarm systems, checkpoints during the work installation of external communication networks, on-site communication networks and video surveillance during the work and construction materials used during the construction of a capital construction facility construction as well as the results of such work to the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of HH 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 74170802767144
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802165734
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-09-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of floors during the work process installation of power electrical equipment during the work process landscaping during the work process AVC automation during the work process fire alarm system during the work process and the construction materials used during the construction of the capital construction facility as well as the results of such work requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of HH Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 74170802081302
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802512347
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed with the installation of an underground pipeline made of polyethylene pipes and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701907712
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-09-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the completion of finishing works laying ceramic tiles installing ceilings during the work process laying wires for internal power supply systems during the work process laying external power supply networks during the work process installing an ice field during the work process finishing a basement during the work process fire alarm during the work and building materials used during the construction of a capital construction facility and also, the results of such work meet the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701782160
Unscheduled inspection
Start date: 2017-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701798896
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701678339
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on fire-resistant coating of metal structures on the installation of concrete floors in the process of work on the installation of porches and canopies on the installation of heating pipelines with the installation of appliances in the process of work on landscaping and landscaping of the territory in the process of work on automation and the construction materials used during the construction of a capital construction facility, as well as the results of such requirements of the technical regulations of the project documentation2 Availability of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701708501
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-07-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on fire-resistant coating of metal structures after the actual completion of work on the installation of porches and canopies after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701530079
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of floors, the installation of partitions, the installation of pipelines for internal water supply networks B1 sewerage K1 internal hot water supply networks T2 T4 heating, the installation of air ducts for ventilation and smoke extraction systems, the installation of a 04 kV vertical layout line and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 The availability of a construction permit3 requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701495095
Unscheduled inspection
Start date: 2017-03-31, end date: 2017-04-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of floors during the installation of pipelines for internal heating networks, ventilation ducts and smoke extraction systems for the installation of a hinged facade made of composite panels and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 The availability of a construction permit 3The requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701380782
Unscheduled inspection
Start date: 2017-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701088816
Unscheduled inspection
Start date: 2016-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701139720
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the elevator shaft and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700993111
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the execution of the regulation from 12082016G2THE receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700896762
Unscheduled inspection
Start date: 2016-10-03, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the GRP and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700068344
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700864306
Unscheduled inspection
Start date: 2016-09-28, end date: 2016-09-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of stairwells and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601752187
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the pipeline installation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601771370
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the execution of the regulation of 31052016G2THE receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation