Found 28 inspections:

# 772101481009
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772101323446
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100367283
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772100209672
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-11, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100896566
Unscheduled inspection
Start date: 2021-04-14, end date: —, duration: 17
Authority: Prokuratura Moskovskoi oblasti
Purpose of inspection: ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii na obekte kapitalnogo stroitelstva «Avtozapravochnyi kompleks» po adresu: Moskovskaya obl., Leninskii r-n, p. Gorki Leninskie


# 772100061032
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 622004417694
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-05-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: proverka sootvetstviya inzhenernotehnicheskogo obespecheniya ploschadka dlya razmescheniya AC ZHMT protivopozharnyh meropriyatii blagoustroistvu obekta kapitalnogo stroitelstva primenennyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii Vedenie ispolnitelnoi dokumentacii Stroitelnyi kontrol


# 622004295734
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-12, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: ispolnenie predpisaniya BA02 ot 28012020g ob ustranenie narushenii


# 622004274748
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: proverka sootvetstviya inzhenernotehnicheskogo obespecheniya ploschadka dlya razmescheniya AC ZHMT SUG protivopozharnyh meropriyatii blagoustroistvu obekta kapitalnogo stroitelstva primenennyh stroitelnyh materialov trebovaniyam proektnoi i rabochei dokumentacii Vedenie ispolnitelnoi dokumentacii Stroitelnyi kontrol


# 621904029233
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-11-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: sootvetstvie nesuschim i ograzhdayuschim konstrukciyam


# 621904029282
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-11-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: sootvetstvie nesuschih konstrukcii AZS


# 771903947388
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 621903893024
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-10-22, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: sootvetstvie nesuschih konstrukcii do otmetki nol


# 621903893070
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-10-22, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: sootvetstvie nesuschih konstrukcii do otm nol proektnym resheniyam


# 771903532627
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-10-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 77190803445820
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803420938
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803341582
Unscheduled inspection
Start date: 2019-02-22, end date: 2019-03-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803328831
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 501902596079
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-02-13, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya programmy proverok ot 24122018 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva Avtozapravochnaya stanciya 171 po adresu Rossiiskaya Federaciya Moskovskaya obl Domodedovskii raion Novokashirskoe shosse 36 km levaya storona soblyudenie obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom


# 77180803308686
Unscheduled inspection
Start date: 2018-12-26, end date: 2018-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803298212
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803270841
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-11-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803270838
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803257580
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803123413
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803086871
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803070150
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.