# 772005237749
Unscheduled inspection
Start date: 2020-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005184960
Unscheduled inspection
Start date: 2020-10-14, end date: 2020-11-11, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772004460155
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701333688
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used