# 77190803435313
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803444458
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803404222
Unscheduled inspection
Start date: 2019-04-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803338162
Unscheduled inspection
Start date: 2019-02-15, end date: 2019-03-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803309663
Unscheduled inspection
Start date: 2018-12-28, end date: 2019-01-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803283467
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803279562
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803276298
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803204953
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803175047
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803184268
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803151808
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-05-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803116515
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803112993
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803078756
Unscheduled inspection
Start date: 2018-02-14, end date: 2018-02-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803088376
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-03-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803081309
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803067849
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802932296
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803018230
Unscheduled inspection
Start date: 2017-12-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170803008375
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802829603
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802830404
Unscheduled inspection
Start date: 2017-11-09, end date: 2017-11-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802844414
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802656733
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170802645971
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802611237
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802015974
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170801966804
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701848580
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701810179
Unscheduled inspection
Start date: 2017-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701806930
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-08-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701768632
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701745856
Unscheduled inspection
Start date: 2017-06-29, end date: 2017-07-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701728345
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-06-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701612811
Unscheduled inspection
Start date: 2017-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701648463
Unscheduled inspection
Start date: 2017-05-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701473427
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701379580
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701379577
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701355406
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701302644
Unscheduled inspection
Start date: 2017-01-12, end date: 2017-01-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701302335
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701219824
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701229917
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701229013
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701273610
Unscheduled inspection
Start date: 2016-12-28, end date: 2017-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701273609
Unscheduled inspection
Start date: 2016-12-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701257918
Unscheduled inspection
Start date: 2016-12-21, end date: 2017-01-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701218141
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701111807
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160701111956
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160701101966
Unscheduled inspection
Start date: 2016-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701132080
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701050715
Unscheduled inspection
Start date: 2016-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701160801
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160701158023
Unscheduled inspection
Start date: 2016-10-13, end date: 2016-10-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the inspection is carried out in order to eliminate violations specified in the instruction issued by Mosgosstroynadzor on the basis of a notification received from the developer customer or person carrying out construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The subject of this inspection is to verify the elimination of violations specified in the instruction issued by Mosgosstroynadzor 908516 of 09092016
# 77160700990191
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700929399
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements, prevention, identification and suppression of violations of technical regulations and project documentation committed by the person being audited, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor 993016 of 21092016
# 77160701056365
Unscheduled inspection
Start date: 2016-10-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160701040644
Unscheduled inspection
Start date: 2016-10-21, end date: 2016-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentation on the basis of the approved verification program, the tasks of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is to verify the elimination of violations specified in the instruction issued by Mosgosstroynadzor 1004516 of 30092016 compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility and also, the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 77160700724159
Unscheduled inspection
Start date: 2016-09-23, end date: 2016-10-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160700843392
Unscheduled inspection
Start date: 2016-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700807098
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Compliance of the capital construction facility with the requirements of technical regulations and design documentation on the basis of the approved verification program, the tasks of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the audited person. The subject of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 861716 of 19082016 compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160700690328
Unscheduled inspection
Start date: 2016-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700235945
Unscheduled inspection
Start date: 2016-09-08, end date: 2016-09-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements, prevention, identification and suppression of violations of technical regulations and project documentation committed by the person being audited, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor 849016 of 09082016
# 77160700886930
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the inspection is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this inspection are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 894616 of 25082016. compliance of work and construction materials used during construction reconstruction the capital construction facility as well as the results of such work meet the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160700060681
Unscheduled inspection
Start date: 2016-08-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700046664
Unscheduled inspection
Start date: 2016-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700051027
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160601781249
Unscheduled inspection
Start date: 2016-08-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160601781231
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentation on the basis of a notification received from the developer customer or the person carrying out construction on the commencement of work, which provides for state construction supervision, prevention of detection and suppression of violations of technical regulations and design documentation committed by the audited person, compliance with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such works according to the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources
# 77160601796901
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160601793365
Unscheduled inspection
Start date: 2016-08-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160601746883
Unscheduled inspection
Start date: 2016-07-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160601716411
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160601707151
Unscheduled inspection
Start date: 2016-07-12, end date: —, duration: —
Authority: —
Purpose of inspection: