Found 108 inspections:

# 422201535917
Unscheduled inspection
Start date: 2022-01-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 422101442328
Unscheduled inspection
Start date: 2021-12-10, end date: 2021-12-15, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu: g. Kemerovo, Leninskii raion, mikroraion № 72, bulvar Stroitelei, 60, korpus 4/2», raspolozhennogo po adresu: g. Kemerovo, bulv. Stroitelei, 60, a takzhe rezultatov takih rabot (ustroistvo svainogo polya, ustroistvo rostverkov) trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 Gradostroitelnogo kodeksa RF chastyu takoi proektnoi dokumentacii), soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti, soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422101442238
Unscheduled inspection
Start date: 2021-12-10, end date: 2021-12-15, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu: g. Kemerovo, Leninskii raion, mikroraion № 72, bulvar Stroitelei, 60, korpus 2», raspolozhennogo po adresu: g. Kemerovo, bulv. Stroitelei, 60, a takzhe rezultatov takih rabot (ustroistvo svainogo osnovaniya, ustroistvo rostverkov) trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 Gradostroitelnogo kodeksa RF chastyu takoi proektnoi dokumentacii), soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti, soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422101456001
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 422101277178
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials and products used during the construction of the capital construction facility "Multi-apartment residential building at the address: Kemerovo, Leninsky district, microdistrict No. 72, Stroiteley Boulevard, 60, building 4/1", located at Kemerovo, Boulevard. Builders, 60, as well as the results of such work (installation of a basement, bricklaying of walls and partitions; installation of external engineering systems: heat supply, water supply, sanitation) to the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such design documentation documentation); The purpose of the audit is to comply with the requirements of the legislation of the Russian Federation on urban development; The subject of this audit is to comply with the mandatory requirements of the legislation of the Russian Federation on urban development


# 422101277049
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the compliance of the work performed and the construction materials and products used during the construction of the facility (glazing of loggias, facade design, installation of doors, installation of ventilation, OPS systems, electrical, plumbing and finishing works), as well as the results of such work with the requirements of the project documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation); The purpose of the audit is to comply with the legislation of the Russian Federation on urban development activities during construction; The subject of the audit is compliance with the legislation of the Russian Federation on urban development activities


# 422101277044
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the compliance of the work performed and the construction materials and products used during the construction of the facility (glazing of loggias, facade design, installation of doors, installation of ventilation, OPS systems, electrical, plumbing and finishing works), as well as the results of such work with the requirements of the project documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation); The purpose of the audit is to comply with the legislation of the Russian Federation on urban development activities during construction; The subject of the audit is compliance with the legislation of the Russian Federation on urban development activities


# 422100641651
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 422100641403
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta (montazh nesuschih i ograzhdayuschih konstrukcii, vnutrennih sten i peregorodok), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 Gradostroitelnogo kodeksa RF chastyu takoi proektnoi dokumentacii); zadachei i predmetom nastoyaschei proverki yavlyayutsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422100591128
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel - proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu: g. Kemerovo, Leninskii raion, mikroraion № 72, bulvar Stroitelei, 60, korpus 4/1», raspolozhennogo po adresu: g. Kemerovo, bulv. Stroitelei, 60, a takzhe rezultatov takih rabot (svainoe osnovanie, rostverki, ustroistvo nesuschih konstrukcii (cokol), ustroistvo ograzhdayuschih konstrukcii, ustroistvo vnutrennih sten i peregorodok) trebovaniyam proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; Zadachei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti; Predmetom proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422100590836
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 422100590995
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials and products used during the construction of the capital construction facility "Multi-apartment residential building at the address: Kemerovo, Leninsky district, microdistrict No. 72, Stroiteley Boulevard, 60, building 4/2", located at Kemerovo, Boulevard. Builders, 60, as well as the results of such work (excavation, pile field construction) to the requirements of the design documentation and verification of compliance with the requirements of parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of the verification is to comply with the requirements of the legislation of the Russian Federation on urban development; The subject of this audit is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development


# 422100428553
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel - proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta, rezultatov takih rabot trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 nastoyaschego Kodeksa chastyu takoi proektnoi dokumentacii), a tak zhe trebovaniyam v otnoshenii energeticheskoi effektivnosti i trebovaniyam v otnoshenii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva; zadacha proverki - soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva; predmet proverki − soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti.


# 422100548909
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel - proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu: g. Kemerovo, Leninskii raion, mikroraion № 72, bulvar Stroitelei, 60, korpus 3», raspolozhennogo po adresu: g. Kemerovo, bulv. Stroitelei, 60, a takzhe rezultatov takih rabot (podgotovitelnye raboty, ustroistvo kotlovana) trebovaniyam proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; Zadachei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti; Predmetom proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422100548884
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 422100540835
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel - proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu: g. Kemerovo, Leninskii raion, mikroraion № 72, pr. Leningradskii, 55, korpus 1», raspolozhennogo po adresu: g. Kemerovo, prosp. Leningradskii, 55, a takzhe rezultatov takih rabot (podgotovitelnye raboty, ustroistvo kotlovana) trebovaniyam proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; Zadachei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti; Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422100426991
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 422100348994
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta (ustroistvo svainogo osnovaniya, rostverkov, montazh nesuschih konstrukcii cokolya, montazh ograzhdayuschih konstrukcii, vnutrennih sten i peregorodok), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2, 3, 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422100348919
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the conformity of the work performed and the building materials used during the construction of the facility (bricklaying of walls and partitions, installation of window blocks, glazing of loggias, roofing, facade, floors, installation of doors, ventilation, electrical, plumbing and finishing works, installation of heating units, elevators, OPS systems), as well as the results of such works are required by the design documentation, verification of compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; the task and subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction


# 422100378168
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel - proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu: g. Kemerovo, Leninskii raion, mikroraion № 72, bulvar Stroitelei, 60, korpus 2», raspolozhennogo po adresu: g. Kemerovo, bulv. Stroitelei, 60, a takzhe rezultatov takih rabot (podgotovitelnye raboty, ustroistvo kotlovana) trebovaniyam proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; Zadachei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti; Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422100235017
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel proverki - sootvetstvie vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta (montazh konstrukcii nizhe 0,000, montazh plit perekrytiya nizhe 0,000, montazh konstrukcii karkasa vyshe otm. 0.000 - stenovye paneli, plity perekrytiya, shahta lifta, lestnichnye marshi i ploschadki, balki, ventbloki i shahta dymoudaleniya), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2, 3, 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii ; zadacha proverki - soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva; predmet proverki − soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti.


# 422100268820
Unscheduled inspection
Start date: 2021-06-09, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Celyu i predmetom proverki yavlyaetsya proverka ispolneniya predpisaniya inspekcii № 01-14-20-01 ot 28.04.2021 (srok ispolneniya 31.05.2021), pri stroitelstve obekta kapitalnogo stroitelstva: «Mnogokvartirnyi zhiloi dom po ul. Tereshkovoi, 16A v mikroraione № 15A Centralnogo raiona g. Kemerovo. 1 etap», raspolozhennogo po adresu: g. Kemerovo, Centralnyi raion, mikroraion № 15A, ul. Tereshkovoi, 16A. Zadachei nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii, dopuschennyh pri stroitelstve obekta.


# 422100260648
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration:
Authority:
Purpose of inspection:


# 422100233888
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta (montazh sistemy ventilyacii, vnutrennih setei elektrosnabzheniya, teplosnabzheniya, vodosnabzheniya, naruzhnyh setei, liftov, ustroistvo fasadov, polov, peregorodok, ustanovka dverei, otdelochnye raboty), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2, 3, 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422100212245
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta (zemlyanye raboty, ustroistvo svainogo osnovaniya, rostverkov), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2, 3, 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422100112446
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-14, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the compliance of the work performed and the building materials used during the construction of the facility (installation of window blocks, roofing, facades, installation of doors, electrical work, installation of elevators), as well as the results of such work with the requirements of the design documentation, verification of compliance with the requirements of parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; task and the subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction.


# 422100112143
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-14, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the compliance of the work performed and the building materials used during the construction of the facility (bricklaying of walls and partitions, installation of window blocks, roofing, facade, floors, installation of doors, electrical, plumbing and finishing works), as well as the results of such work with the requirements of the project documentation, verification of compliance with the requirements of parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; the objective and subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction


# 422100073605
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva: «Mnogokvartirnyi zhiloi dom po ul. Tereshkovoi, 16B v mikroraione № 15A Centralnogo raiona g. Kemerovo», raspolozhennogo po adresu: g. Kemerovo, Centralnyi raion, mikroraion № 15A, ul. Tereshkovoi, 16B, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2, 3, 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422100059809
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-03-31, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose of verifying the conformity of the work performed and the building materials used during the construction of the capital construction facility "Multi-apartment residential building at the address: Kemerovo, Leninsky district, microdistrict No. 72, Stroiteley Boulevard, 60, building 4/1", located at Kemerovo, Boulevard. Builders, 60, as well as the results of such work (excavation, excavation fencing, pile field, grillings) to the requirements of the project documentation and verification of compliance with the requirements of parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of verification is compliance with the requirements of the legislation of the Russian Federation on urban development; The subject of verification is compliance with mandatory legal requirements Of the Russian Federation on urban development activities


# 422105344235
Unscheduled inspection
Start date: 2021-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 422105344195
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-02-08, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta (kirpichnaya kladka sten i peregorodok), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2, 3, 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422005187800
Unscheduled inspection
Start date: 2020-10-07, end date: 2020-10-09, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta ustroistvo monolitnyh sten i perekrytii cokolya i 1go etazha kirpichnaya kladka sten i peregorodok a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii proverki vypolneniya trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422005178617
Unscheduled inspection
Start date: 2020-10-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 422004484957
Unscheduled inspection
Start date: 2020-08-11, end date: 2020-08-13, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta ustroistvo svainogo polya rostverkov montazh cokolya a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii proverki vypolneniya trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422004484950
Unscheduled inspection
Start date: 2020-08-11, end date: 2020-08-13, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta ustroistvo kotlovana i svainogo osnovaniya rostverkov monolitnyh sten i perekrytii cokolya i 1go etazha a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii proverki vypolneniya trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422004463715
Unscheduled inspection
Start date: 2020-07-24, end date: 2020-08-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenennyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam v otnoshenii energeticheskoi effektivnosti i trebovaniyam v otnoshenii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu g Kemerovo pr Moskovskii 4a» raspolozhennogo po adresu Kemerovskaya oblast g Kemerovo Centralnyi raion pr Moskovskii 4a zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 422004430409
Unscheduled inspection
Start date: 2020-06-11, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 422004423620
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-02, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po ul Tereshkovoi 16V v mikroraione 15A Centralnogo raiona g Kemerovo» raspolozhennogo po adresu g Kemerovo Centralnyi raion mikroraion 15A ul Tereshkovoi 16V a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii proverki vypolneniya trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422004423603
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-02, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: s celyu proverki sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po ul Tereshkovoi 16V v mikroraione 15A Centralnogo raiona g Kemerovo» raspolozhennogo po adresu g Kemerovo Centralnyi raion mikroraion 15A ul Tereshkovoi 16V a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii proverki vypolneniya trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422004407649
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-05-21, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the compliance of the work performed and the building materials used during the construction of the facility, the facade of the floors of the heating unit of the metering unit of the water measuring unit, the installation of doors, electrical plumbing and finishing works, the installation of ventilation systems, elevators, OPS systems, commissioning, as well as the results of such work, with the requirements of the design documentation, the verification of compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation, the task and the subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction.


# 422004326388
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority:
Purpose of inspection:


# 422004260044
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 421904053026
Unscheduled inspection
Start date: 2019-12-10, end date: 2020-01-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421904050162
Unscheduled inspection
Start date: 2019-12-10, end date: 2020-01-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421904050137
Unscheduled inspection
Start date: 2019-12-10, end date: 2020-01-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421903977223
Unscheduled inspection
Start date: 2019-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 421903976695
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 421903833054
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903188189
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 421903451073
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-09-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903220791
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 421903220781
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902925857
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development during the construction of a capital construction facility task suppression and prevention of violations of legislation on participation in the shared construction of apartment buildings and or other real estate objects subject to compliance with mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 421902925077
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-08-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902924961
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-08-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902795441
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902813069
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421902739807
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration:
Authority:
Purpose of inspection:


# 421902739737
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902617779
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902564353
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902564647
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902564556
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902432750
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-03-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902452084
Unscheduled inspection
Start date: 2019-01-29, end date: 2019-01-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802336075
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802336347
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802336317
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801942566
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 421800955654
Unscheduled inspection
Start date: 2018-10-23, end date: —, duration:
Authority:
Purpose of inspection:


# 421802003186
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-11-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801056768
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801059092
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800645026
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800596645
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800571549
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800520718
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800562090
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800561821
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800424918
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800492397
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-07-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421800490573
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421800338012
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800362132
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800399820
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-05-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel proverka ispolneniya predpisaniya inspekcii 01011803 ot 25042018 zadacha proverka ustraneniya narushenii pri osuschestvlenii stroitelstva predmet ispolnenie predpisaniya inspekcii 01011803 ot 25042018


# 421800399812
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-05-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel proverka ispolneniya predpisaniya inspekcii 01011802 ot 03042018 zadacha proverka ustraneniya narushenii pri osuschestvlenii stroitelstva predmet ispolnenie predpisaniya inspekcii 01011802 ot 03042018


# 421800337931
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800337972
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800264455
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800307993
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800109122
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-02-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800102085
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-02-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800102146
Unscheduled inspection
Start date: 2018-02-07, end date: 2018-02-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 42180803056364
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-01-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802919544
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802919531
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802919518
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802907318
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 42170802762182
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-10-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used during the construction of the facility as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Tasks Compliance with the requirements of the legislation of the Russian Federation in the field of urban development during the construction of a capital construction facility Subject Compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 42170802024243
Unscheduled inspection
Start date: 2017-09-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 42170802023906
Unscheduled inspection
Start date: 2017-09-07, end date: 2017-09-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802563224
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Tasks Compliance with the requirements of the legislation of the Russian Federation in the field of urban development during the construction of the capital construction facility Subject Compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 42170802538613
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel proverka sootvetstviya vypolnennyh rabot i primenennyh stroitelnyh materialov v processe stroitelstva obekta a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh aktov i proektnoi dokumentacii Zadachi Opredelenie sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam proektnoi dokumentacii i tehnicheskih reglamentov Predmet Soblyudenie trebovanii zakonodatelstva RF v oblasti gradostroitelnoi deyatelnosti


# 42170801917338
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the building materials used during the construction of the facility as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Tasks compliance with the legislation of the Russian Federation on urban development activities during construction Subject compliance with the legislation of the Russian Federation on urban development activities


# 42170701863296
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-09-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel Proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obektov kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh aktov i proektnoi dokumentacii v tom chisle trebovaniyam v otnoshenii energeticheskoi effektivnosti i trebovaniyam v otnoshenii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva Zadacha Opredelenie sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam proektnoi dokumentacii i tehnicheskih reglamentov Predmet Soblyudenie obyazatelnyh trebovanii zakonodatelstva RF o gradostroitelnoi deyatelnosti


# 42160701272741
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel ispolnenie predpisaniya inspekcii 01061601 ot 31102016 v svyazi s istecheniem sroka ispolneniya predpisaniya Zadacha proverka ustraneniya narushenii dopuschennyh pri stroitelstve obekta kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom po adresu g Kemerovo bulv Stroitelei 61 Predmet proverka ispolneniya predpisaniya inspekcii 01061601 ot 31102016 srok ispolneniya predpisaniya 20122016


# 42160701023754
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel proverka ispolneniya predpisaniya 01171602 ot 29072016 srok ispolneniya 30092016 pri stroitelstve obekta kapitalnogo stroitelstva «Mnogokvartirnye zhilye doma 5 i 6 so vstroennymi obektami obschestvennogo naznacheniya obschestvennoe zdanie 5 s obektami sockultbyta v mikroraione Markovceva 5 Leninskogo raiona g Kemerovo 1 etap ZHiloi dom 5 so vstroennymi pomescheniyami obschestvennogo naznacheniya na pervom etazhe Zadacha proverka ustraneniya narushenii dopuschennyh pri stroitelstve obekta kapitalnogo stroitelstva Predmet ispolnenie predpisaniya 01171602 ot 29072016 srok ispolneniya 30092016


# 42160700071526
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.