Found 15 inspections:

# 242101293743
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program of 05.03.2021 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100543465
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100377415
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 242100297260
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 936-ONS-3 dated 05/26/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/05/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100306438
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100193039
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program of 05.03.2021 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.


# 242100165133
Unscheduled inspection
Start date: 2021-04-27, end date: 2021-05-26, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 177-ons-3 dated 02/24/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/26/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100069370
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-04-22, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 200-ons-3 dated 02/20/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 03/25/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242105331805
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242105305858
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-16, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued instruction No. 2230-ons-3 dated 10/28/2020, on the elimination of identified violations at the specified capital construction facility, in connection with the notification received (dated 01/12/2021). No. 1) on the elimination of violations; the purpose of this audit is to establish the fact of elimination of previously identified violations.7. The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expired on 12/30/2020.


# 242105334080
Unscheduled inspection
Start date: 2021-01-26, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242005242139
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 01072020 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005153149
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 09072019 inspections during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005153148
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242005151480
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.