Found 32 inspections:

# 002005208955
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of the fulfillment by LLC "Steiger" of the points of the previously issued instruction on the elimination of identified violations from 20082020 RP3322487P, the deadlines for which expired on the basis of the Request of LLC "Steiger" from 19102020 269 bx from 26102020 33235413 to conduct an audit in order to recognize the prescription as fulfilled tasks implementation of measures to control the elimination of violations specified in the previously issued instruction from 20082020 RP3322487P the subject is the fulfillment of the instructions of the state control and supervision bodies


# 002005208931
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of the fulfillment by LLC "Steiger" of the points of the previously issued instruction on the elimination of identified violations from 20082020 RP3322529P, the deadlines for which expired on the basis of the Request of LLC "Steiger" from 19102020 269 bx from 26102020 33235413 to conduct an audit in order to recognize the prescription as fulfilled tasks implementation of measures to control the elimination of violations specified in the previously issued instruction from 20082020 RP3322529P the subject is the fulfillment of the instructions of the state control and supervision bodies


# 002005199073
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-23, duration: 6
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development. compliance with the performance of work and the construction materials used during the construction of a capital construction facility. construction as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


# 002005199065
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004483280
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004483269
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004483257
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004483245
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 002004424565
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004424647
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004424669
Unscheduled inspection
Start date: 2020-06-15, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004424620
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004345143
Unscheduled inspection
Start date: 2020-03-20, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 662100171983
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives - verification of compliance with mandatory requirements in the field of urban development based on the notice of completion of construction, reconstruction of the capital construction facility No. 02 dated 03/30/2021 (incoming No. 332/13581 dated 04/01/2021); objectives - prevention, detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development; subject - compliance with mandatory requirements in areas of urban planning; compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a valid construction permit issued by the authorized body


# 662100097781
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-16, duration: 9
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify compliance with mandatory requirements in the field of urban planning activities on the basis of the notice of completion of construction and reconstruction of the capital construction facility No. 01 dated 03/16/2021 (ex. No. 332/10491 dated 03/22/2021). The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this review is: - compliance with mandatory requirements in the field of urban planning; - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a valid building permit issued by the authorized body.


# 772100178460
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 5
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the inspection is to comply with the provisions of the previously issued regulation on the elimination of identified violations dated 03/09/2021 No. RP.-332-554- o/n, the deadline for which has expired. The objectives of this unscheduled on-site inspection are: implementation of measures to control the elimination of violations specified in the regulation dated 03/09/2021 No. RP-332-554- about/P. The subject of this review is: Compliance with the instructions of the state control (supervision) bodies dated 03/09/2021 No. RP-332-554- o/n, the deadline for which has expired.


# 772100020931
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-09, duration: 5
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: For the purpose of implementing federal state supervision in the field of industrial safety during the operation of hazardous production facilities. Reason: subclause "a" of clause 2 of Part 2 of Article 10 of Federal Law No. 294-FZ dated December 26, 2008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the exercise of State Control (Supervision) and Municipal Control" - receipt by the Ural Office of Rostechnadzor of an appeal about possible violations of industrial safety requirements during mining and blasting operations LLC "Steiger" (order No. 332/1361 dated 01/18/2021), motivated presentation of the need for an unscheduled documentary inspection by the acting Head of the Interregional Mining Supervision Department Koreshkov D.V. dated 02/04/2021 No. SL-332-263. The objectives of this review are: implementation of measures to monitor the compliance of LLC "Steiger" with industrial safety requirements during the operation of a hazardous production facility. The subject of this audit is: compliance with mandatory requirements; carrying out measures: to prevent harm to the life and health of citizens.


# 002105291660
Unscheduled inspection
Start date: 2021-01-27, end date: 2021-02-05, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the inspection program. The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this review is: - compliance with mandatory requirements in the field of urban planning; - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a valid building permit issued by the authorized body.


# 002005208955
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of the fulfillment by LLC "Steiger" of the points of the previously issued instruction on the elimination of identified violations from 20082020 RP3322487P, the deadlines for which expired on the basis of the Request of LLC "Steiger" from 19102020 269 bx from 26102020 33235413 to conduct an audit in order to recognize the prescription as fulfilled tasks implementation of measures to control the elimination of violations specified in the previously issued instruction from 20082020 RP3322487P the subject is the fulfillment of the instructions of the state control and supervision bodies


# 002005208931
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of the fulfillment by LLC "Steiger" of the points of the previously issued instruction on the elimination of identified violations from 20082020 RP3322529P, the deadlines for which expired on the basis of the Request of LLC "Steiger" from 19102020 269 bx from 26102020 33235413 to conduct an audit in order to recognize the prescription as fulfilled tasks implementation of measures to control the elimination of violations specified in the previously issued instruction from 20082020 RP3322529P the subject is the fulfillment of the instructions of the state control and supervision bodies


# 002005199080
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-23, duration: 6
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to verify compliance with mandatory requirements in the field of urban development activities based on the verification program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development activities. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of works and the construction materials used during the construction of a capital construction facility as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002005199073
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-23, duration: 6
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development. compliance with the performance of work and the construction materials used during the construction of a capital construction facility. construction as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


# 002005199065
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-23, duration: 6
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to verify compliance with mandatory requirements in the field of urban development activities based on the verification program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development activities. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of works and the construction materials used during the construction of a capital construction facility as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004483280
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004483269
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004483257
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004483245
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 002004424565
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004424647
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004424669
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration: 10
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004424620
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of compliance with mandatory requirements in the field of urban development based on the inspection program objectives prevention detection and suppression of violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development subject compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements of the project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a valid construction permit issued by the authorized body


# 002004345143
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-04-02, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is to verify compliance with mandatory requirements in the field of urban development. compliance with the performance of works and the construction materials used during construction the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a valid construction permit issued by the authorized body


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.