# 002005249795
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-24, duration: 20
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the verification program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of work and the construction materials used during the construction of a capital construction facility construction as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 002004485292
Unscheduled inspection
Start date: 2020-08-12, end date: 2020-08-21, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the verification program62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of works and the construction materials used during construction the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 662101350215
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-17, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-19-01/445-17 dated 03/01/2021 (Amendment No. 4), the task of this inspection is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the building materials used in the construction of the capital construction facility "Stage II - construction of the DSU, 2TP and the administrative and shopping center from the facility: The Administrative and shopping center on Kosmonavtov St., in the Leninsky district of Nizhny Tagil", located at the address: Sverdlovsk region, Nizhny Tagil, Leninsky District, Kosmonavtov St., as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a permit for construction; meeting the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100899948
Unscheduled inspection
Start date: 2021-10-04, end date: 2021-10-15, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100221633
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-06-21, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-19-01/445-17 dated 2021-03-01; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Stage II - construction of the DSU, 2TP and the administrative and shopping center from the facility: The Administrative and shopping center on Kosmonavtov St., in the Leninsky district of Nizhny Tagil, located at the address: Sverdlovsk region, Nizhny Tagil, Leninsky district, Kosmonavtov St., the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, including the requirements for energy efficiency (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; the availability of a construction permit; compliance with the requirements set out in parts 2, 3 and 3.1 of the Article 52 of the Urban Planning Code of the Russian Federation.
# 662100175981
Unscheduled inspection
Start date: 2021-04-27, end date: —, duration: 15
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the inspection program.
The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development.
The subject of this review is:
- compliance with mandatory requirements in the field of urban planning;
- compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used;
- availability of a valid building permit issued by the authorized body.
# 662100062521
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-04-16, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose: implementation of the notice of completion of the capital construction project No. 29-18-01/8102 dated 03/05/2021 in accordance with the inspection program dated 10/11/2019 No. 29-18-01/352-19 (subparagraph "a" of paragraph 2 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation)
Task: regional state supervision.
Subject: verification of the conformity of work performed and construction materials used during the construction of the capital construction facility "Swimming pool building of FC Aquamarine, located at 5 Kamenskaya Street in Kamensk – Uralsky, Sverdlovsk region", located at 5 Kamenskaya Street, Sverdlovsk region, Kamensk – Uralsky city, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintaining an information model is mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; meeting the requirements set out in Parts 2, 3 and 3.1 of Articles 52 of the Urban Planning Code of the Russian Federation.
# 662105302756
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005249795
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-24, duration: 20
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the verification program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of work and the construction materials used during the construction of a capital construction facility construction as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 002004485292
Unscheduled inspection
Start date: 2020-08-12, end date: 2020-08-21, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the verification program62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of works and the construction materials used during construction the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 662004413188
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29180135219 dated 20191011the tasks of the regional state construction supervision are to verify the compliance of the work and applicable building materials during the construction of the capital construction facility The swimming pool building of FC Aquamarine located at Kamenskaya d 5 in Kamenskuralsky, Sverdlovsk region, located at Kamenskuralsky d 5 street, Sverdlovsk region, the results of such work with the requirements approved in accordance with with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federations
# 662004192367
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903785429
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902960965
Unscheduled inspection
Start date: 2019-08-15, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902839683
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902886529
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-08-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The task is to carry out regional state construction supervision to verify the compliance of the work performed and the building materials used in the construction of the capital construction facility "Production Complex at 43 Bakhchivandzhi Street, Yekaterinburg" located at 43 Bakhchivandzhi Street, Sverdlovsk Region, Yekaterinburg, with the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation.
# 661902813302
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29190793 dated 26042019 the task is to carry out regional state construction supervision the subject of the KNM is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29190793 dated 26042019
# 661902723027
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902605617
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29170705P1 dated February 11, 2019. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29170705P1 dated February 11, 2019.
# 661800663696
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose of the audit is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements dated July 20, 2018 291907203 the objectives of the audit are the implementation of regional state construction supervision the subject of the audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements dated July 20, 2018 291907203
# 661800426697
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291807761 dated April 06, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291807761 dated April 06, 2018. the deadline for eliminating violations is May 21, 2018
# 661800442762
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of paragraph 2 of the previously issued order to eliminate the identified violation of mandatory requirements 291805448 dated December 14, 2017 with the deadline for eliminating this violation on May 30, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of paragraph 2 of the previously issued order to eliminate the identified violation of mandatory requirements 291805448 dated December 14th, 2017
# 661800493609
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805355 dated September 26, 2017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805355 dated September 26, 2017 with the deadline for eliminating the violation on June 01, 2018
# 661800058086
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to implement the inspection program 29180125217 dated 08082017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Trade Office Complex" located at 24 Lenin Street, Kashino village, Sverdlovsk region, Sysertsky district, the results of such work with technical requirements project documentation regulations, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800041239
Unscheduled inspection
Start date: 2018-01-24, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66170701561333
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-05-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805662 dated March 20, 2017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291805662 dated March 20, 2017
# 66160700101627
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: