Found 31 inspection:

# 262101239322
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Inspection program dated 06/07/2021 No. 25/01-2021. The objectives of this inspection are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, and the person carrying out construction. . The subject of this review is: - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - elimination of violations of compliance of completed works with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation (hereinafter referred to as violations) identified during construction control and the implementation of regional state construction supervision, as well as compliance with the prohibition to proceed with work until acts on the elimination of such violations are drawn up; - compliance with other requirements when performing work established by the project documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources; - compliance with mandatory requirements and (or) requirements established by municipal legal acts; - compliance with the regulations of state control (supervision) bodies, municipal control bodies; - holding events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation; prevention of natural and man-made emergencies; to eliminate the consequences of causing such harm.


# 112100350966
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority:
Purpose of inspection:


# 612100105260
Unscheduled inspection
Start date: 2021-04-05, end date: —, duration: 10
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: verification of the execution of regulation No. 02.015.2964-2 from 25.01.2021 to 26.03.2021 prevention, detection and suppression of violations of urban planning legislation, including technical regulations, and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor) The subject of this audit is the verification of: compliance with the regulations of state control (supervision) bodies , municipal control bodies


# 112005192336
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-17, duration: 4
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 112005214351
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-13, duration: 5
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: Purpose conducting an inspection in accordance with the inspection program Subject to compliance with mandatory requirements


# 112005192436
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-12, duration: 4
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 112005136939
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-09, duration: 5
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 112005135362
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-09, duration: 5
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 342004510408
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 612004469119
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 112004534953
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 112004487015
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 112004463219
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-07-30, duration: 4
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program is the subject of compliance with mandatory requirements


# 342004410369
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation tasks are to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements regarding a compliance with the performance of work and the construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 612004305273
Unscheduled inspection
Start date: 2020-02-26, end date: —, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:


# 342004268022
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-28, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation tasks are to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation subject is compliance with mandatory requirements regarding a compliance with the performance of work and the construction materials used during the construction and reconstruction of a capital construction facility and as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 111902634845
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-19, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the inspection in accordance with the inspection program is to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, subject to compliance with mandatory requirements


# 111902510465
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration:
Authority:
Purpose of inspection:


# 111802175626
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-05, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the inspection in accordance with the inspection program is to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, subject to compliance with mandatory requirements


# 111802126261
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 111801414964
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-19, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the inspection in accordance with the inspection program is to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, subject to compliance with mandatory requirements


# 111800604531
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-10, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the audit in accordance with the audit program The purpose of this audit is to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements


# 111800276863
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-12, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the inspection in accordance with the inspection program is to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer. The subject of the inspection is compliance with mandatory requirements


# 111800234087
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-04-27, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose in accordance with the program of inspections of the Task is to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, subject to compliance with mandatory requirements


# 11170802979937
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-22, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose of the inspection in accordance with the inspection program is to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. Subject of the inspection is compliance with mandatory requirements


# 11170802964771
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-22, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: The purpose in accordance with the program of inspections of the Task is to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, subject to compliance with mandatory requirements


# 11170802815625
Unscheduled inspection
Start date: 2017-11-24, end date: 2017-11-28, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: Purpose of the inspection in accordance with the program of inspections and verification of the execution of the regulation on the elimination of violations dated 26092017 43 Tasks prevention identification and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation Subject of the inspection and compliance with mandatory requirements and compliance with the instructions of the authorities state control supervision of municipal control bodies


# 11170802526202
Unscheduled inspection
Start date: 2017-09-22, end date: —, duration:
Authority:
Purpose of inspection:


# 26160701157450
Unscheduled inspection
Start date: 2016-11-29, end date: 2016-12-26, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out for the purpose of inspection program 09132016 dated 03112016 final notice of completion of construction bn dated 10112016the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, hereinafter referred to as the contractor. The subject of this inspection is compliance with mandatory requirements defined by the Urban Planning Code of the Russian Federation and other regulatory legal acts of the Russian Federation


# 26160701073742
Unscheduled inspection
Start date: 2016-11-02, end date: 2016-11-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is conducted for the purpose of notifying the start of construction of BN dated 28102016the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, hereinafter referred to as the contractor, including technical regulations and project documentation. The subject of this inspection is to note the necessary compliance with mandatory requirements defined by the Urban Planning Code of the Russian Federation and other regulatory legal acts of the Russian Federation


# 61160601772217
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-22, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: Compliance with the instructions of the state control bodies, supervision of municipal control bodies, verification of compliance with the requirements of the project and technical regulations, norms and rules when performing work, compliance with the procedure for conducting construction control, availability of executive technical documentation acts of hidden work, executive surveys, etc.


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.