Found 21 inspection:

# 001801775564
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-11-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of checking the fulfillment of the instruction dated April 17, 2018 69P7 issued by the North Ural Rostechnadzor Department the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts in the field of safety of hydraulic structures and to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other compliance with regulations of state control bodies, supervision of municipal control bodies


# 001800173440
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-17, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated August 11, 2017 467P34 issued by the North Ural Rostechnadzor Department. The objectives of this inspection are to verify the fulfillment of the instructions of the state control bodies and municipal control bodies.


# 00170701762962
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-08-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the fulfillment of the instruction from 20072016 273P16 issued by the Severouralsky Rostechnadzor Department. The objectives are to verify the elimination of violations of mandatory requirements identified by the Severouralsky Department of the Federal Environmental Technological and Nuclear Supervision Service during the audit of the MULTIFUNCTIONAL COMPLEXACVALL LIMITED LIABILITY COMPANY. The subject of the audit is the fulfillment of the instructions of state control bodies, supervision bodies, municipal control bodies


# 722004403660
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-05-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice of completion of construction of a capital construction facility dated 15042020 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Wellness complex with an aquapark and facilities infrastructure on Shcherbakova Street in Tyumen 12345 stages" "Wellness complex Wellness block Wellness zone" Stage 4 "BKTP" Stage 4 located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region, building 2 Russian Federation, Tyumen region, Shcherbakova Street, 87, building 2 Compliance with mandatory requirements


# 722004398666
Unscheduled inspection
Start date: 2020-04-22, end date: —, duration:
Authority:
Purpose of inspection:


# 722004370468
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration:
Authority:
Purpose of inspection:


# 721903688705
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-10-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notice of completion of construction of the reconstruction of the capital construction facility dated 16092019 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Wellness complex with an aquapark and facilities" committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer infrastructure along Shcherbakova Street in Tyumen 1234 stages" "Outdoor recreation recreation complex" Stage 2 located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region, building 1 Compliance with mandatory requirements


# 721903044349
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 721902605639
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision based on the program of inspections for the capital construction project dated 17092018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Wellness complex with an aquapark and infrastructure facilities on Shcherbakova St. in Tyumen 1 2 3 4 stages" 2 4 stages located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region, building 1 87 Shcherbakova Street, building 2, Tyumen, Russian Federation, Tyumen Region


# 001801775564
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-11-13, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of checking the fulfillment of the instruction dated April 17, 2018 69P7 issued by the North Ural Rostechnadzor Department the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts in the field of safety of hydraulic structures and to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other compliance with regulations of state control bodies, supervision of municipal control bodies


# 721802010745
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 10092018 on the completion dates of works subject to inspection during the construction reconstruction of a capital construction facility inspection program dated 17092018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during construction the capital construction project "Wellness complex with an aquapark and infrastructure facilities on Shcherbakova Street in Tyumen 1 2 3 4 stages" 2 4 stages located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region, building 1 Russian Federation, Tyumen region, Tyumen, 87 Shcherbakova Street, building 2


# 721800430241
Unscheduled inspection
Start date: 2018-05-30, end date: 2018-06-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notice dated 22052018 on the completion dates of works subject to inspection during the construction reconstruction of a capital construction facility inspection program dated 12122017 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during construction the capital construction project "Wellness complex with an aquapark and infrastructure facilities on Shcherbakova Street in Tyumen 1 2 3 4 stages" 2 4 stages located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region, building 1 Russian Federation, Tyumen region, Tyumen, 87 Shcherbakova Street, building 2


# 721800257063
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 001800173440
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-04-17, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated August 11, 2017 467P34 issued by the North Ural Rostechnadzor Department. The objectives of this inspection are to verify the fulfillment of the instructions of the state control bodies and municipal control bodies.


# 721800191799
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 12122017 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Wellness complex with an aquapark and infrastructure facilities on Shcherbakova St. Tyumen" 2 4 stages located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region


# 72170803000093
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 30112017 on the start of construction of a capital construction facility, prevention of detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility"Wellness complex with an aquapark and infrastructure facilities on Shcherbakova Street in Tyumen" 2 4 stages located at 87 Shcherbakova Street, Tyumen, Russian Federation, Tyumen region


# 72170802741886
Unscheduled inspection
Start date: 2017-10-13, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 00170701762962
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-08-11, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the fulfillment of the instruction from 20072016 273P16 issued by the Severouralsky Rostechnadzor Department. The objectives are to verify the elimination of violations of mandatory requirements identified by the Severouralsky Department of the Federal Environmental Technological and Nuclear Supervision Service during the audit of the MULTIFUNCTIONAL COMPLEXACVALL LIMITED LIABILITY COMPANY. The subject of the audit is the fulfillment of the instructions of state control bodies, supervision bodies, municipal control bodies


# 72170701547492
Unscheduled inspection
Start date: 2017-04-11, end date: 2017-05-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 04/29/2016. Verification of compliance of the work performed and the building materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility "Wellness Complex with an aquapark and infrastructure facilities on Shcherbakova street in Tyumen 1 3 stages" located at the address Tyumen region Tyumen Shcherbakova street d87 Shcherbakova street d 87 building 1 Shcherbakova street d 87 building 2


# 72160701132421
Unscheduled inspection
Start date: 2016-11-11, end date: 2016-12-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 04/29/2016. Verification of compliance of the work performed and the building materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility "Wellness Complex with an aquapark and infrastructure facilities along Shcherbakova street in Tyumen 1 2 stages" located at the address Tyumen region Tyumen Shcherbakova street d87 Shcherbakova street d 87 building 1 Shcherbakova street d 87 building 2


# 72160601710019
Unscheduled inspection
Start date: 2016-07-11, end date: 2016-07-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 29042016 Verification of compliance of the work and the construction materials used in the construction process, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of the capital construction facility "Wellness Complex with an aquapark and infrastructure facilities on Shcherbakova street in Tyumen 1 2 stages" located at Tyumen region Tyumen Shcherbakova street d 87 Shcherbakova street d 87 building 1 Shcherbakova street d 87 building 2