Found 8 inspections:

# 742101236887
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-15, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on soil development, laying pipelines using the HDD method (casing and working pipe) with the installation of cases, the installation of a sandy base for sections of pipelines laid in an open manner, the installation of PE cases followed by the installation of pipelines and fixed supports laid in an open manner, the construction of water wells No. 2, No. 6 with the installation of wet wells and subsequent waterproofing, installation of a protective sand layer and backfilling of the trench. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100388266
Unscheduled inspection
Start date: 2021-07-30, end date: 2021-08-12, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of the monolithic foundation slab of school-wide block No. 1 in axes 1i-7i (after the actual completion of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not covered by energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100109270
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-19, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a sandy base for sections of pipelines laid in an open manner (Site No. 4).Installation of PE cases, followed by installation of pipelines and fixed supports laid in an open manner (Site No. 4).Construction of water supply chamber 4 (Site No. 4).Installation of a protective sand layer (Site No. 4).Backfilling of the trench (Site No. 4).Soil development (Site No. 5).The installation of a sandy base for sections of pipelines laid in an open manner (Site No. 5).Restoration of the disturbed landscaping. Soil development. (Plot No. 4).Backfilling of the trench (Site No. 3).Laying of the pipeline using the HDD method (casing and working pipe) (Section No.4) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100025129
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742105303958
Unscheduled inspection
Start date: 2021-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 742005186537
Unscheduled inspection
Start date: 2020-10-22, end date: 2020-11-19, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed on 1 Installation of a reinforced concrete case with subsequent installation of pipelines and fixed supports laid in an open manner Section 1 Construction of water wells Section 1 Installation of a protective sand layer Section 1 Backfilling of the trench Section 1 Soil development Section 2 Laying of the pipeline using the HDD casing and working pipe Section 2 Construction of a sandy base for pipeline sections laid in an open manner Section 2 Installation of pipelines and construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004435657
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-17, duration: 18
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the Installation of a fixed support H 22 laying and installation of pipelines installation of a bellows compensator K 15 and shaped products installation of a heating main pipeline system and construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code with taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the equipment requirements of the capital construction facility construction with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004413553
Unscheduled inspection
Start date: 2020-05-22, end date: 2020-06-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of soil to the device of gravel-and-gravel preparation to the device of a sandy base for laying pipelines in foam insulation and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in paragraphs 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.