# 00170802806177
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-24, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of paragraphs 5 6 13 of the previously issued instruction on the elimination of identified violations dated July 31, 2017 PA72188, which should be notified to MEGATEKSTROYINVEST LLC in any available way at least 24 hours before the start of the audit. The objectives of this audit are to verify the elimination by a legal entity of the violations identified in the prescriptionthe purpose of this audit is to comply with the instructions of the state control supervision authority
# 00170802795560
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-10-27, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this check is carried out for the purpose of control points 1 2 3 4 5 7 8 9 10 11 12 previously issued an order to eliminate the identified violations dated July 31, 2017 PA72188, which should be notified to MEGATEKSTROYINVEST LLC by any available method at least 24 hours before the start of the audit. The objectives of this audit are to verify the elimination by a legal entity identified violations specified in the prescriptionthe subject of this audit is to comply with the instructions of the state control authority.
# 282201535669
Unscheduled inspection
Start date: 2022-01-12, end date: 2022-01-25, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the implementation of the inspection program approved on 07/02/2021, the prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282101350855
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282101176453
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282101192140
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100672008
Unscheduled inspection
Start date: 2021-09-15, end date: 2021-09-28, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed facility, the objectives of this audit are: verification of the completed facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, based on the notice of completion of the facility (bx. No. 1614 of 09/06/2021);, verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282100670036
Unscheduled inspection
Start date: 2021-09-15, end date: 2021-09-28, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction of the facility and resolution of the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources., prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of compliance violations performed during the construction of the facility capital construction, as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, verification of compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work to the design documentation, including the requirements of energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources
# 282100337700
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100335063
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-07-23, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: the implementation of the inspection program approved on 07/02/2021, the prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100300142
Unscheduled inspection
Start date: 2021-06-28, end date: 2021-07-09, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program approved on 12/18/2020, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used.
# 282100236428
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282100236367
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: to implement the inspection program approved on 11.01.2021
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100136924
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-04-28, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: This check is carried out in order to:
- execution of the inspection program approved on 12/18/2020
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify that the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, comply with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100072711
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-01, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: to implement the inspection program approved on 11.01.2021
The objectives of this audit are: prevention, identification and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100014935
Unscheduled inspection
Start date: 2021-02-20, end date: 2021-03-23, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this check is being conducted in order to:
- execution of the inspection program approved on 01/13/2021
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.
The subject of this audit is to verify that the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, comply with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282100011932
Unscheduled inspection
Start date: 2021-02-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282105340551
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-03-01, duration: 17
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose: to implement the inspection program approved on 11.01.2021
The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and the requirements of the equipment of the capital construction facility accounting of used energy resources.
The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 282005150766
Unscheduled inspection
Start date: 2020-10-02, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282005203864
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004486482
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-09-10, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 05022020the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004454637
Unscheduled inspection
Start date: 2020-07-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 282004439968
Unscheduled inspection
Start date: 2020-06-25, end date: 2020-07-23, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved on 02092019the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004407666
Unscheduled inspection
Start date: 2020-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004407504
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the audit program approved by 05022020the objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify compliance the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004342859
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-04-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of receiving a notice of the start of construction, the execution of the inspection program approved by 05022020the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 282004243508
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 282004221312
Unscheduled inspection
Start date: 2020-01-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281904127422
Unscheduled inspection
Start date: 2019-12-19, end date: 2020-01-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed facility and the issue of issuing an opinion on the compliance of the constructed facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used execution of the inspection program approved by 12042019the objectives of this audit are to prevent identify and suppress violations of compliance by the developer technical customer person carrying out construction performed during the construction of the facility The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used. requirements for equipping a capital construction facility with metering devices for used energy resources
# 281903992157
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used
# 281903992170
Unscheduled inspection
Start date: 2019-11-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281903930337
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-12-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used
# 281903930234
Unscheduled inspection
Start date: 2019-11-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281903713673
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281903383966
Unscheduled inspection
Start date: 2019-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281903059826
Unscheduled inspection
Start date: 2019-09-03, end date: 2019-09-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose execution of the verification program Task prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. the capital construction facility, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources
# 281902864032
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902899878
Unscheduled inspection
Start date: 2019-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902658695
Unscheduled inspection
Start date: 2019-05-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281902731625
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281902613528
Unscheduled inspection
Start date: 2019-04-02, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281802309429
Unscheduled inspection
Start date: 2018-12-13, end date: 2019-01-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer the technical customer the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used 7 The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used
# 281802171695
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose is to check the completed construction of the facility and resolve the issue of issuing an opinion on the compliance of the constructed work facility with technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used Tasks are to prevent identify and suppress violations of compliance committed by the developer, the technical customer, the person carrying out the construction the subject of the construction of the capital construction facility, as well as the results of such work, is the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. Verification of the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including and the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources
# 281802171684
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281801287313
Unscheduled inspection
Start date: 2018-09-13, end date: 2018-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Execution of the inspection program approved by 10062018 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The subject of this inspection The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281801338299
Unscheduled inspection
Start date: 2018-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 281801669057
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: verification of the completed construction facility and the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The objectives of this audit are to prevent identify and suppress violations of compliance by the developer, technical customer, and the person carrying out the construction during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 281801655495
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: checking the completed construction of the facility and deciding whether to issue an opinion on the compliance of the constructed work facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the objectives of this audit are to prevent identify and suppress violations of compliance by the developer, technical customer, and the person carrying out the construction during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used 7 The subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 281800680361
Unscheduled inspection
Start date: 2018-08-29, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281800576008
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 281800455483
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-07-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Execution of the inspection program approved by 10062018 The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The subject of this inspection The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800396299
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify the compliance of the work performed and the construction materials used in during the construction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 281800391671
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800263754
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-05-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: according to the notice of the start of construction, the implementation of the inspection program approved on 23112017, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with energy metering devices The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 281800210921
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-04-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.
# 281800048373
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:
# 28170803036753
Unscheduled inspection
Start date: 2017-12-29, end date: 2018-02-02, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The execution of the inspection program was approved on 21032017
# 00170802806177
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-24, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of paragraphs 5 6 13 of the previously issued instruction on the elimination of identified violations dated July 31, 2017 PA72188, which should be notified to MEGATEKSTROYINVEST LLC in any available way at least 24 hours before the start of the audit. The objectives of this audit are to verify the elimination by a legal entity of the violations identified in the prescriptionthe purpose of this audit is to comply with the instructions of the state control supervision authority
# 28170802972842
Unscheduled inspection
Start date: 2017-10-08, end date: 2018-01-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: implementation of the inspection program approved by 10062017
# 28170802758388
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The execution of the inspection program was approved on 21032017
# 00170802795560
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-10-27, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this check is carried out for the purpose of control points 1 2 3 4 5 7 8 9 10 11 12 previously issued an order to eliminate the identified violations dated July 31, 2017 PA72188, which should be notified to MEGATEKSTROYINVEST LLC by any available method at least 24 hours before the start of the audit. The objectives of this audit are to verify the elimination by a legal entity identified violations specified in the prescriptionthe subject of this audit is to comply with the instructions of the state control authority.
# 28170701870524
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: According to the inspection program
# 28170701870517
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: According to the inspection program
# 28170701870514
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: According to the inspection program
# 00170701822048
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-31, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating Tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating Tower Cranes from 2017 to 2019"The objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts.7 The subject of this audit is compliance with by a legal entity in the course of carrying out activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings, facilities, equipment and materials used, as well as requirements for machinery and equipment and related requirements for these products operation and disposal processes