Found 5 inspections:

# 742005236005
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed on the foundation Installation of metal structures Installation of roofing and wall corrugated board Installation of doors and gates Installation of PVC doors and windows Installation of equipment Installation of electrical equipment Installation of dry pipes Installation of ventilation of plumbing Electrical installation of power equipment Installation of lightning protection and grounding after completion of work and applied building materials during construction reconstruction of the capital construction as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005179634
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004498185
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742004484093
Unscheduled inspection
Start date: 2020-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 742004449429
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-07-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 matching viperbot at the Node receiving grain from avtorta one prestostoragesolutions of funda of avtoremonta norvasc.interactions дверейоборудяэлектрооборудяЗерноочотдразрабгрунтазабивка Svirstroy fundability of papercrete at elevation+6000перекрна OTM+23000монтаж of metallokonstrukciy оконоборудованияэлектрооборудовябункер waste and the discharge hopper to transport 1разрабгрунтазабивсвайустрво Foundation installation металлоконстрйворотдверейоборудяэлектрооборудясухотрубовблок Yes bouncebouncebounce grintsevichius fundamentalmente металлоконструкцийЗерносушилкаразработка grintsevichius of fundamentalnature оконоборудяэлектрооборудяЗернохрще selectparser grantability fundamentalmente of ogrecontrollermanager.h ekonomolegirovannaja shipment to transport 2разрабгрунтазабивсвайустрво фундтамонтоборудяэлектрооборяЭстакада conversable grintsevichius Fundamenta оборудованияэлектрообяПодсобвсппомещениеразработка grintsevichius Fundamenta metallokonstruktsii plate polumenta of grajdanskiy gate of dorelektromash water canalize and Prim straturile in procserve object cepstra and results such works of trebam of utwv of shoots чч15152и153 ст48 of Hardcodes projectdocument with ucsm unesu project documentation in shoots чч38и39 ст49 of Hardcodes of immiently in the case. if formerie and maintenance of infmodel are Obasi ACC with tresgrandas in tstream of energeticamente except objects cepstra which trebaseleghe not resprts Trebs and equipment of the property cepstra of trebuchet испэнергетичресурсов2Наличие permission to строительство3 Execution of trench 23 and 31 ст52 of Hardcodes Russia


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.