# 612101449740
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612101443905
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612101514171
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration: 1
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 8 of the inspection program: Checking the completed construction of the facility.
Events for MGN, landscaping, landscaping, installation of small molds.
Equipment of the capital construction facility with metering
devices for the energy resources used (subject to the actual completion of all work provided
for in the design documentation, including the completion of work on roofing, enclosing
structures, walls and partitions, filling window openings, installation of engineering
networks: (HVAC, heating, electricity, ventilation, communication networks), plastering of places for general
use.
Filling in doorways, installing elevators, installing floors and painting walls in
public areas, installing entrances and sending notices upon completion
of construction).
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101514113
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration: 1
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 5 of the inspection program: Checking the completed construction of the facility.
Events for MGN, landscaping, landscaping. The equipment of
the capital construction facility with metering devices for the energy resources used (subject
to the actual completion of all work provided for in the project documentation and
notification of completion of construction).
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101522822
Unscheduled inspection
Start date: 2021-12-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612101461162
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration: 7
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 4 of the inspection program: Installation of the aboveground part of the monolithic building frame
(columns, beams, railway lines, platforms, floor slabs)
The construction of enclosing structures (brickwork), the construction of partitions,
glazing, roofing.
Installation of engineering and technical support networks, installation of gates and filling
of doorways, finishing works.
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101452746
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: 10
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out for the purpose of: fulfilling clause 6 of the inspection program: Installation of internal engineering networks and technological equipment (ventilation, water supply, sanitation, electricity, heating); Finishing works of common areas; Installation of technological elevator equipment; Installation of fire extinguishing and alarm systems; Landscaping and landscaping, MGN events, recreation areas and MAFs; Inspection completed construction of a capital construction facility, subject to the actual completion of all work provided for in the project documentation and sending a notice of completion of construction. The objectives of this audit are: prevention, identification and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor), the subject of this audit is to verify: compliance with mandatory requirements and (or) requirements, established by municipal legal acts
# 612101436480
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: 4
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 7 of the inspection program: The construction of a monolithic reinforced concrete frame
of the aboveground part of the building,
Installation of walls and partitions,
Enclosing structures,
Filling openings.
Roof construction,
Laying of engineering networks.
Building engineering and technical support systems
The objectives of this audit are:
prevention, detection and suppression of violations of
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101366779
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 6 of the inspection program: Checking the completed construction of the facility.
Events for MGN, landscaping, landscaping, installation of small molds.
The equipment of the capital construction facility with metering
devices for the energy resources used (subject to the actual completion of all work provided
for in the project documentation and notification of completion of construction).
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
7. The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101359122
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: 7
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of:
fulfilling paragraph 1 of the inspection program: The work of the preparatory period. Organization of the
construction site in accordance with the construction project.
Earthworks. Installation of a pile foundation.
The objectives of this audit are:
prevention, identification and suppression of violations committed by the developer, the customer, as well
as the person carrying out construction on the basis of the contract
with the developer or the customer (hereinafter referred to as the contractor), violations of the legislation on
urban planning activities, including project documentation
7. The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101359099
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: 7
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of:
fulfilling paragraph 1 of the inspection program: The work of the preparatory period. Organization of the
construction site in accordance with the construction project.
Earthworks. Installation of a pile foundation.
The objectives of this audit are:
prevention, identification and suppression of violations committed by the developer, the customer, as well
as the person carrying out construction on the basis of the contract
with the developer or the customer (hereinafter referred to as the contractor), violations of the legislation on
urban planning activities, including project documentation
7. The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101280436
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: 8
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The arrangement of internal networks and engineering support systems.
# 612101346204
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612101346118
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612100997948
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612101251496
Unscheduled inspection
Start date: 2021-10-27, end date: —, duration: 3
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: For the purpose of:
fulfilling clause 1 of the inspection program: Preparatory period work
, the objectives of this inspection are:
prevention, detection and suppression of violations of
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100962450
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 3 of the inspection program: Installation of the foundation plate
The installation of the underground part of the monolithic frame of the building (columns, walls, beams, ramp,
floor slabs)
the objectives of this inspection are:
prevention, detection and suppression of violations of the legislation on urban development committed by the developer, the customer, as well as by the
person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor),
including including the project documentation
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100962253
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration: 3
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: For the purpose of:
fulfilling clause 1 of the inspection program: Preparatory period work
, the objectives of this inspection are:
prevention, detection and suppression of violations of
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101170911
Unscheduled inspection
Start date: 2021-10-21, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of:
fulfilling clause 4 of the inspection program: The construction of the railway frame of the aboveground part of the building,
reinforcement and concreting of columns, walls, ceilings, floors. Masonry of external walls and
internal partitions (12).Construction of the railway frame of the aboveground part of the building, reinforcement and
concreting of columns, walls, ceilings, floors. Masonry of exterior walls and interior
partitions. Roofing, filling of door and window openings, installation
of stained glass balcony systems.
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
7. The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101061106
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration: 9
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 5 of the inspection program: The construction of a monolithic reinforced concrete frame
of the aboveground part of the building,
Installation of walls and partitions,
Enclosing structures,
Filling openings.
Roof construction,
Laying of engineering networks.
Building engineering and technical support systems
The objectives of this inspection are:
prevention, detection and suppression of violations of
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101060286
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612101237643
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: It is carried out for the purpose of:
fulfilling paragraph 1 of the inspection program: Preparatory work (removal of storage
equipment to the area, installation of a fence fence, a construction site for MSRP). Excavation work:
site planning, excavation development. Installation of a pile foundation.
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
7. The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612101237600
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: It is carried out for the purpose of:
fulfilling paragraph 1 of the inspection program: Preparatory work (removal of storage
equipment to the area, installation of a fence fence, a construction site for MSRP). Excavation work:
site planning, excavation development. Installation of a pile foundation.
The objectives of this audit are:
prevention, detection and suppression of violations of the
legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100938051
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612100937788
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of:
fulfilling clause 2 of the inspection program: Installation of a monolithic w/w frame below m +0.000.
Installation of a monolithic w /w frame above m +0.000(1-2), bricklaying of external and
internal walls of stairs and elevator shafts.
# 612100403943
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 3 of the inspection program: Installation of the foundation plate
The installation of the underground part of the monolithic frame of the building (columns, walls, beams, ramp,
floor slabs)
the objectives of this inspection are:
prevention, detection and suppression of violations of the legislation on urban development committed by the developer, the customer, as well as by the
person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor),
including including the project documentation
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100326145
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of:
fulfilling clause 4 of the inspection program: The construction of the railway frame of the aboveground part of the building,
reinforcement and concreting of columns, walls, ceilings, floors. Masonry of exterior walls and
interior partitions. Roof installation.
The objectives of this audit are:
prevention, detection and suppression
of violations of urban planning legislation, including technical regulations, and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100323885
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Rostovskoi oblasti
Purpose of inspection: compliance with mandatory requirements and/or requirements established
by municipal legal acts
# 612100273863
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: It is carried out for the purpose of:
fulfilling paragraph 3 of the inspection program: The construction of a reinforced concrete frame of the underground part of the building, the basement and aboveground floors of the building.(3).
The objectives of this audit are:
prevention, identification and suppression of violations committed by the developer, the customer, as well as by the person carrying out construction on the basis of the contract
with the developer or the customer (hereinafter referred to as the contractor), violations of the legislation on urban development, including technical regulations, and project documentation
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal legal acts
# 612100247519
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 4 of the inspection program: The construction of a monolithic reinforced concrete frame
of the aboveground part of the building,
Installation of walls and partitions,
Enclosing structures,
Filling openings.
The objectives of this audit are:
prevention, detection and suppression
of violations of urban planning legislation, including technical regulations, and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100250114
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612100301911
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612100130807
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-07, duration: 4
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 2 of the inspection program: Installation
of the foundation slab
the objectives of this inspection are:
prevention, detection and suppression
of violations of urban planning legislation, including technical regulations, and design documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor)
. Documentation
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100130731
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-07, duration: 4
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of:
fulfilling clause 2 of the inspection program: Installation of the foundation slab
the objectives of this inspection are:
prevention, detection and suppression
of violations of urban planning legislation, including technical regulations, and design documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor)
. Documentation
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts
# 612100056817
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-16, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of:
fulfilling clause 3 of the inspection program: The construction of the railway frame of the aboveground part of the building,
reinforcement and concreting of columns, walls, ceilings, floors. Masonry of external walls and
internal partitions (12).
The objectives of this inspection are:
prevention, detection and suppression of violations of
legislation on urban development, including technical regulations, and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract
with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is verification of:
compliance with mandatory requirements and (or) requirements established by municipal
legal acts.
# 612100024673
Unscheduled inspection
Start date: 2021-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612005269960
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612005283404
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-22, duration: 2
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: In order to implement the p1 inspection program, the preparatory period objectives of this inspection are to prevent, identify and suppress violations of the laws of fencing, including technical regulations and design documentation, committed by the developer, the customer, as well as by anyone carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005283372
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612005300171
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-24, duration: 4
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This inspection is carried out in order to perform the following works: Inspection of a capital construction facility completed, subject to the actual completion of all work provided for in the project documentation and notification of completion of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including The purpose of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612005256243
Unscheduled inspection
Start date: 2020-12-23, end date: 2020-12-30, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: In order to fulfill the p3 inspection program, the construction of a monolithic reinforced concrete frame on the ground of the building, the construction of walls and partitions, the sealing structures, and the filling of openings. The objectives of this inspection are to prevent, identify, and suppress violations of the laws of fencing, including technical regulations and design documentation, committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is Verification of compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005256217
Unscheduled inspection
Start date: 2020-12-23, end date: 2020-12-30, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: In order to implement the P4 inspection program, the construction of a monolithic reinforced concrete frame for the underground and aboveground parts of the building, the construction of internal walls and partitions, and protective structures are the objectives of this inspection. The objectives of this inspection are to prevent, identify and suppress violations of the laws of fencing, including technical regulations and design documentation, committed by the developer, the customer, and the contractor. mandatory requirements and or requirements established by municipal legal acts
# 612005293600
Unscheduled inspection
Start date: 2020-12-23, end date: 2020-12-25, duration: 3
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p8 program of verification of the completed facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer, hereinafter referred to as the contractor. The subject of this inspection is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005291247
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612005291234
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-28, duration: 3
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out with the aim of fulfilling the p6 inspection program Verification of the capital construction facility completed, subject to the actual completion of all work provided for in the project documentation, ensuring fire safety, landscaping and landscaping of the recreation area and the MAFIA, and the direction of the completion notification. The objectives of this inspection are to prevent, identify and suppress violations of the laws of the fencing industry committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer, hereinafter referred to as the contractor. The purpose of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612004521838
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-16, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p7 inspection program Inspection of engineering networks landscaping The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer, hereinafter referred to as the contractor. The subject of this inspection is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005216674
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-11-27, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out with the aim of fulfilling the p1 inspection program Development of a foundation pit installation of a monolithic reinforced concrete base plate installation of a monolithic reinforced concrete frame below m +0000 installation of a monolithic reinforced concrete frame above m +0000the objectives of this inspection are to prevent the detection and suppression of violations of the legislation of fencing activity committed by the developer, the customer, as well as by a person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and Project documentationsubject The purpose of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005216645
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: It is carried out for the purpose of fulfilling the p1 inspection program Development of a foundation pit installation of a monolithic reinforced concrete base plate installation of a monolithic reinforced concrete frame below m +0000 installation of a monolithic reinforced concrete frame above m +000012the objectives of this inspection are to prevent the identification and suppression of violations of the legislation of fencing activity committed by the developer, the customer, as well as by a person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation. The purpose of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005216391
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-09, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to carry out the p5 inspection program Construction of a reinforced concrete frame of the aboveground part of the building reinforcement and concreting of columns of walls and floors Masonry of exterior walls and interior partitions Roofing filling of door and window openings installation of stained glass balcony systems The objectives of this inspection are to prevent identify and suppress the allowed by the developer the customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor violations of legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612005216545
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612005230903
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: 20
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: this inspection is carried out in order to perform the following works: Filling of window and door openings Installation of heating systems installation of cold and hot water supply systems electrical installation of low-current systems installation of external engineering networks and equipment installation of elevator equipment internal and external finishing works testing of fire protection systems landscaping the objectives of this inspection are the prevention detection and suppression of carrying out construction on the basis of a contract with a developer or customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including technical regulations and design documentationthe subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004493773
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p2 inspection program Installation of a monolithic reinforced concrete foundation slab construction of a reinforced concrete frame of the underground part of the building of the basement and aboveground floors of the building.3 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612004474094
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612004444256
Unscheduled inspection
Start date: 2020-07-24, end date: 2020-07-31, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p3 inspection program Installation of a foundation slab Construction of a monolithic reinforced concrete frame of the underground and aboveground parts of the building Construction of partitions on the enclosing walls The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612004453833
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-07-21, duration: 3
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p5 inspection program Installation of monolithic reinforced concrete structures above m 0000 to the 15th floor level installation of masonry of external and internal walls and partitions fences of stairs and loggias filling of window openings The objectives of this inspection are to prevent identify and suppress violations committed by the developer the customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor legislation on urban planning activities, including technical regulations and project documentation, The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004427989
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-06-16, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p4 inspection program Construction of the concrete frame of the aboveground part of the building reinforcement and concreting of columns of walls and floors Masonry of exterior walls and internal partitions The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development committed by the developer the customer as well as by the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor, including technical regulations and project documentation The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004428017
Unscheduled inspection
Start date: 2020-06-09, end date: 2020-06-17, duration: 6
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p4 inspection program Construction of the concrete frame of the aboveground part of the building reinforcement and concreting of columns of walls and floors Masonry of exterior walls and internal partitions The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development committed by the developer the customer as well as by the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor, including technical regulations and project documentation The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004438257
Unscheduled inspection
Start date: 2020-06-02, end date: 2020-06-16, duration: 10
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p2 inspection program Installation of a foundation slab Construction of a monolithic reinforced concrete frame of the underground and aboveground parts of the building Construction of partitions on the enclosing walls The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612004428164
Unscheduled inspection
Start date: 2020-06-05, end date: 2020-06-09, duration: 3
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify the execution of Regulation 0100226242 from 27032020 to 01062020 issued by STROYTREST CONSTRUCTION COMPANY LLC TIN 6166047082 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection The purpose of the audit is to verify compliance with the regulations of state control bodies and municipal control bodies
# 612004410361
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration: 10
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify the execution of Regulation 01002262561 from 18022020 to 24042020 issued by STROYTREST CONSTRUCTION COMPANY LLC TIN 6166047082 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection The purpose of the audit is to verify compliance with the regulations of state control bodies and municipal control bodies
# 612004396233
Unscheduled inspection
Start date: 2020-04-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612004383271
Unscheduled inspection
Start date: 2020-03-24, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612004363060
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-20, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out for the purpose of executing the p6 inspection program Installation of internal and external engineering systems and equipment electricity water supply and sanitation heating gas supply ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems elevator equipment Interior and exterior finishing works The objectives of this inspection are the prevention identification and suppression of violations committed by the developer the customer as well as the person carrying out construction on on the basis of an agreement with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004355710
Unscheduled inspection
Start date: 2020-03-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612004275670
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration: 20
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to carry out the p4 inspection program Installation of monolithic reinforced concrete structures above m 0000 l to the 5th floor level installation of masonry of external and internal walls and partitions The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development committed by the developer the customer as well as by the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor, including technical regulations and project documentation The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004292534
Unscheduled inspection
Start date: 2020-02-06, end date: 2020-02-12, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p3 inspection program Construction of a reinforced concrete frame of the underground part of the building and monolithic structures of the aboveground part of the building. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. verification is the verification of compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004292539
Unscheduled inspection
Start date: 2020-02-05, end date: 2020-02-11, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p3 inspection program Construction of a reinforced concrete frame of the underground part of the building installation of monolithic structures of the aboveground floors of the building The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. verification is the verification of compliance with mandatory requirements and or requirements established by municipal legal acts
# 612004292527
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-14, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to fulfill the p2 inspection program Installation of a monolithic reinforced concrete foundation slab construction of a reinforced concrete frame of the underground part of the building of the basement and aboveground floors of the building.3 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612004292508
Unscheduled inspection
Start date: 2020-02-11, end date: 2020-02-17, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to carry out the p1 inspection program Preparatory work removal of storage equipment to the area installation of a fence construction site for agricultural land Excavation site layout excavation foundation Pile foundation The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities committed by the developer the customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor including technical regulations and project documentation, the subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts.
# 612004219235
Unscheduled inspection
Start date: 2020-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612004219066
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-11, duration: 10
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify the execution of Regulation 01002262541 from 08112019 to 20012020 issued by STROYTREST CONSTRUCTION COMPANY LLC TIN 6166047082 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection The purpose of the audit is to verify compliance with the regulations of state control bodies and municipal control bodies
# 612004155196
Unscheduled inspection
Start date: 2020-01-10, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 612004155133
Unscheduled inspection
Start date: 2020-01-10, end date: 2020-01-17, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: In order to fulfill the p1 inspection program, the organization of the construction site and preparatory excavation of the pile foundation, the objectives of this inspection are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this inspection is to verify compliance with mandatory requirements and or requirements established by municipal authorities. legal acts
# 611904148216
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-20, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out for the purpose of fulfilling the p4 inspection program Installation of internal and external engineering systems and equipment electricity water supply and sanitation heating gas supply ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems elevator equipment Interior and exterior finishing workthe tasks of this inspection are to prevent identify and prevent the construction of the customer as well as the person carrying out the construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor of violations of the legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611904182940
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-24, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This inspection is carried out in order to fulfill the p2 inspection program Installation of a pile foundation monolithic reinforced concrete foundation slab The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611904183002
Unscheduled inspection
Start date: 2019-12-17, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 611903900041
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-05, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The purpose is to carry out the verification task program to prevent the identification and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and project documentation, and compliance with mandatory requirements or requirements established by municipal legal acts
# 611903930944
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 611903868613
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-11-08, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This inspection is carried out with the aim of fulfilling the p3 inspection program Installation of monolithic reinforced concrete structures above HM 0000 installation of masonry of external and internal walls and partitions. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. verification is the verification of compliance with mandatory requirements and or requirements established by municipal legal acts
# 611903868590
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This audit is conducted for the purpose of verifying the execution of Regulation 01002262521 from 05072019 to 05092019 issued by STROYTREST CONSTRUCTION COMPANY LLC TIN 6166047082the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to verify compliance with regulations bodies of state control and supervision of municipal control bodies
# 611903011865
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 611902981340
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-16, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out for the purpose of fulfilling the p4 inspection program Installation of internal and external engineering systems and equipment electricity water supply and sanitation heating gas supply ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems elevator equipment Interior and exterior finishing workthe tasks of this inspection are to prevent identify and prevent the construction of the customer as well as the person carrying out the construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor of violations of the legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611902922350
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-07-29, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: it is carried out with the aim of fulfilling the p1 inspection program Preparatory work for the removal of a storage facility to the area the installation of a fence fence the construction site for the housing estate Earthworks the layout of the site the foundation pit
# 611902922290
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-26, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: for the purpose of fulfilling the p1 inspection program, Preparatory work was carried out on the terrain of the storage facility, the construction of a fence, the construction site for the housing estate, earthworks, the layout of the site, and the foundation pit
# 611902797632
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 611902564152
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 611902594147
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-04-12, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This inspection is carried out in order to fulfill the p1 program of inspections of the construction site Organization Excavation excavation Pile foundation installation the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611902616181
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-25, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This audit is conducted in order to control the audit program p2 in case 010022624. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts and project documentation
# 611802290931
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This audit is carried out in order to control the execution of p1 of the audit program in case 010022624 The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with mandatory requirements and or the requirements established by municipal legal acts
# 611801921549
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-09, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out in order to fulfill the p5 inspection program Installation of internal and external engineering systems and equipment electricity water supply and sanitation heating gas supply ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems elevator equipment Interior and exterior finishing works the objectives of this inspection are the prevention identification and suppression of violations committed by the developer the customer as well as the person carrying out construction on based on an agreement with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611800792515
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 611800550321
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-08-07, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the purpose is to carry out a program of inspections of tasks to prevent the identification and suppression of violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, subject to mandatory requirements or requirements established by municipal legal acts
# 611800230341
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-06, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: this check is carried out in order to control the fulfillment of the prescription the objectives of this check are to verify the fulfillment of the prescription the fulfillment of the prescriptions by state control bodies supervision of municipal control bodies
# 611800001665
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-02-02, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the purpose of the program of inspections is to prevent the identification and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, compliance with mandatory requirements or requirements established by municipal legal acts
# 61160701211682
Unscheduled inspection
Start date: 2016-11-29, end date: 2016-12-01, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: purpose of the verification of the execution of regulation 0149893 of 03112016the task of the verification of the execution of regulation 0149893 of 03112016the subject of the fulfillment of the regulations of the state control bodies of supervision of municipal control bodies
# 61160701091812
Unscheduled inspection
Start date: 2016-10-21, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 61160601777401
Unscheduled inspection
Start date: 2016-08-04, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 61160601772844
Unscheduled inspection
Start date: 2016-07-13, end date: 2016-07-21, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: objectives of the implementation of item 2 of the Program for conducting inspections in case 014989 tasks prevention detection and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentationsubject verification of the conformity of work performed and the construction materials used during the construction and reconstruction of a capital construction facility as well as the results of such work according to the requirements of the technical regulations of the project documentation