Found 61 inspection:

# 001903991442
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-12, duration:
Authority: Federalnaya antimonopolnaya sluzhba
Purpose of inspection: monitoring of compliance with the requirements of the AMZ


# 342100789775
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this inspection is to verify the fulfillment of the order dated 06/21/2021 No. 29/05 issued by Artel LLC on the elimination of violations committed during the construction of the Facility.


# 342004669337
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-29, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: verification is done with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and design dokumentaciis the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentlibraries of this review is to comply with the mandatory requirements in otnosheniia of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and results such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resursov permit stroitelstvo requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 342004669432
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-06-30, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: verification is done with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and design dokumentaciis the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentlibraries of this review is to comply with the mandatory requirements in otnosheniia of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and results such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resursov permit stroitelstvo requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 922004240791
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of verifying compliance with the requirements of the issued regulation on the elimination of violations during the construction of a capital construction facility 9207300404017027 dated 29112019 issued to the legal entity Artel LLC based on the expiration of the deadline for the fulfillment of the regulations issued by Sevgosstroynadzor on the elimination of violations of mandatory requirements Tasks of verifying compliance with the requirements of the issued regulation on the elimination of violations during the construction of a capital construction facility 9207300404017027 dated 29112019 issued to the legal entity ARTEL LLCARTEL" on the basis of the expiration of the deadline for the execution of the orders issued by Sevgosstroynadzor on the elimination of violations of mandatory requirements for the implementation of the instructions of the state control bodies of supervision of municipal control bodies


# 341904011102
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of the compliance of the work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter the Code of Project Documentation, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of building permits to meet the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903991442
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-12, duration:
Authority: Federalnaya antimonopolnaya sluzhba
Purpose of inspection: monitoring of compliance with the requirements of the AMZ


# 341903958699
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, project documentation, and the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation. Of the Russian Federation, including technical regulations and design documentation, the subject of this audit is compliance with mandatory requirements regarding the compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Design Documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903958667
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, project documentation, and the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation. The purpose of this audit is to comply with the mandatory requirements regarding the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Project Documentation, taking into account the amendments made to project documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy availability of a construction permit and compliance with the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903043129
Unscheduled inspection
Start date: 2019-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 341903566776
Unscheduled inspection
Start date: 2019-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 341903823073
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-09-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of the compliance of the work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter the Code of Project Documentation, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of building permits to meet the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903566699
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341903566672
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 181903009934
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration:
Authority: Glavnoe upravlenie po gosudarstvennomu nadzoru Udmurtskoi Respubliki
Purpose of inspection: Verification of regulation 0579278 of 27062019


# 341902888704
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-07-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: This inspection is carried out in connection with the expiration of the 28062019 deadline for the execution of the order dated 28052019 11604 issued by ARTEL LLC on the elimination of violations committed during the construction of the Facility in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and design documentationthe purpose of this inspection The purpose of this audit is to prevent, identify and prevent violations of the legislation of the Russian Federation and project documentation. The purpose of this audit is to comply with the instruction dated 28052019 11604 issued by ARTEL LLC on the elimination of violations committed during the construction of the Facility


# 341902888682
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 181902833353
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-08, duration:
Authority: Glavnoe upravlenie po gosudarstvennomu nadzoru Udmurtskoi Respubliki
Purpose of inspection: prevention detection and suppression of violations of legislation on urban development activities and project documentation


# 501902920066
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority:
Purpose of inspection:


# 341902916396
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this inspection is to prevent identify and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation


# 181903009049
Unscheduled inspection
Start date: 2019-06-06, end date: —, duration:
Authority: Glavnoe upravlenie po gosudarstvennomu nadzoru Udmurtskoi Respubliki
Purpose of inspection:


# 341902916328
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation.


# 341902745078
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of the compliance of the work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of a capital construction facility construction with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902745072
Unscheduled inspection
Start date: 2019-05-14, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341902602131
Unscheduled inspection
Start date: 2019-03-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 77180803268416
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 341802178822
Unscheduled inspection
Start date: 2018-11-30, end date: 2018-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation. The purpose of this inspection is The purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of project documentation b availability of building permits and c compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341802022350
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the audit is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation. b The purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the construction materials used to meet the requirements of the project documentation b the availability of a building permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 77180803227932
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 341801866604
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 341801660328
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-09-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of this audit is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation. The purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is it is the fulfillment of the instruction dated 27072018 2805 issued by Artel LLC on the elimination of violations committed during the reconstruction of the Facility


# 771800610281
Unscheduled inspection
Start date: 2018-08-02, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:


# 341800568387
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341800598520
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 341800568461
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the audit is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation. b The purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the construction materials used to meet the requirements of the technical regulations of the project documentation b the availability of a building permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800473781
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation b the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the construction materials used requirements of the technical regulations of the project documentation b the availability of a building permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 501800181128
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-02-02, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees


# 501800181106
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-02-02, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees


# 77170802920978
Unscheduled inspection
Start date: 2017-11-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802700343
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802363186
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-10-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802574736
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-10-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802567529
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701857659
Unscheduled inspection
Start date: 2017-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701785030
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701739759
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-08-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701649878
Unscheduled inspection
Start date: 2017-06-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701607833
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701578515
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701523622
Unscheduled inspection
Start date: 2017-04-10, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701509223
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701453206
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701371271
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701413728
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701309758
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701276948
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701199374
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701103234
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160700996848
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 1000-516 from 29092016


# 77160700863590
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700715296
Unscheduled inspection
Start date: 2016-09-19, end date: 2016-09-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.