Found 8 inspections:

# 712100481608
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-08-19, duration: 10
Authority: Inspekciya Tulskoi oblasti po gosudarstvennomu arhitekturno-stroitelnomu nadzoru
Purpose of inspection: verification of compliance with the instructions of the inspection of the Tula region for state architectural and construction supervision No. MG-08 dated 06/16/2021 on the basis of the expiration of the prescribed period for the execution of the instruction; , prevention, detection and suppression of violations of legislation on urban development, including design documentation., compliance with the instructions of the inspection of the Tula Region for State architectural and construction Supervision No. MG-08 from 06/16/2021;


# 262004173883
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-02-05, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification dated 24/122019 225150114 inspection program dated 22102017 26052017 Stage 3 inspection tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 001904089224
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-12, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the execution of LLC "SU1" previously issued regulations


# 001902808061
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-21, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of compliance with Rostechnadzor Order No. 15032017 85 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated 08022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations Operating Tower cranes from 2017 to 2019


# 261902732310
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the inspection are notification of the completion dates of the works to be inspected from 16052019 77300114 inspection program from 22092018 261020188 Stage 3 inspection tasks The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of inspection compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902574429
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-04-12, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works subject to verification from 06032019 33940114 inspection program from 22092018 261020188 stage 2 inspection objectives The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902490984
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-04, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works subject to verification dated 31.012019 14620114 the objectives of the audit are to prevent identify and suppress violations of urban planning legislation committed by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drafting acts inspections of structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902490893
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.