# 661802308709
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the notice of completion of the construction of the capital construction facility bx 29018253676 dated 12122018. The objectives of this inspection are to carry out regional state construction supervision. 6 The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Highways and engineering networks of the industrial park "PROBIZNESPARK" Street 1 from PK0 to PK4 1 construction stage" located at Yekaterinburg, Polevodstvo settlement of the results of such work to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and to the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 661802129665
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-12-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29150143618 dated October 15, 2018. The objectives of this inspection are to carry out regional state construction supervision. 7 The subject of this inspection is to verify the conformity of work performed and building materials used in the construction of the capital construction facility "Highways and Engineering Networks of the PROBUSNESPARK Industrial Park" 1 Street from PK8+21 to PK11 3 street from PK5+60 to PK7+49 4 street PK3+0 to PKZ+94 84 2nd stage of construction" located at Yekaterinburg, Polevodstvo, the results of such work meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661802129658
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-12-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29150143518 dated October 15, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "Highways and Engineering Networks of the PROBUSNESPARK Industrial Park" 1 Street from PK0 to PK4 1st stage of construction" the results of such work, located at Yekaterinburg , meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used , as well as the availability of a construction permit and compliance with the requirements of Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800834128
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800587345
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection: