Found 17 inspections:

# 742004449452
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-07-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 matching viperbot at the Node receiving grain from avtorta one prestostoragesolutions of funda of avtoremonta norvasc.interactions дверейоборудяэлектрооборудяЗерноочотдразрабгрунтазабивка Svirstroy fundability of papercrete at elevation+6000перекрна OTM+23000монтаж of metallokonstrukciy оконоборудованияэлектрооборудовябункер waste and the discharge hopper to transport 1разрабгрунтазабивсвайустрво Foundation installation металлоконстрйворотдверейоборудяэлектрооборудясухотрубовблок Yes bouncebouncebounce grintsevichius fundamentalmente металлоконструкцийЗерносушилкаразработка grintsevichius of fundamentalnature оконоборудяэлектрооборудяЗернохрще selectparser grantability fundamentalmente of ogrecontrollermanager.h ekonomolegirovannaja shipment to transport 2разрабгрунтазабивсвайустрво фундтамонтоборудяэлектрооборяЭстакада conversable grintsevichius Fundamenta оборудованияэлектрообяПодсобвсппомещениеразработка grintsevichius Fundamenta metallokonstruktsii plate polumenta of grajdanskiy gate of dorelektromash water canalize and Prim straturile in procserve object cepstra and results such works of trebam of utwv of shoots чч15152и153 ст48 of Hardcodes projectdocument with ucsm unesu project documentation in shoots чч38и39 ст49 of Hardcodes of immiently in the case. if formerie and maintenance of infmodel are Obasi ACC with tresgrandas in tstream of energeticamente except objects cepstra which trebaseleghe not resprts Trebs and equipment of the property cepstra of trebuchet испэнергетичресурсов2Наличие permission to строительство3 Execution of trench 23 and 31 ст52 of Hardcodes Russia


# 741802157635
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741801761028
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work in the axes "35" "AB" installation of reinforced concrete structures from the seventh to the tenth floor of the overlap and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801021304
Unscheduled inspection
Start date: 2018-09-13, end date: 2018-09-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures in the axes "12" "AB" from the 8th to the technical floor for the installation of the roof and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code Russian Federation


# 741800521974
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 741800522014
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work in axes "35" "AB" installation of reinforced concrete structures from the basement to the sixth floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800447632
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures of the exterior walls of internal partitions and floor slabs of the 12th floor in the axes "ABC" "1c10c" "12" "BCAs" during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800447622
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the reinforcement and concreting of the grillage with the completed stage and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800447593
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work in the axes "35" "AB" reinforcement and concreting of the grillage is the completed stage and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800295200
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures of the exterior walls of internal partitions and floor slabs of the basement in the axes "ABC" "1c10c" "12" "BCAs" during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170801972867
Unscheduled inspection
Start date: 2017-09-05, end date: 2017-09-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of work on the installation of monolithic structures of the basement floor, the completion of work on the installation of the zero cycle and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701798585
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of monolithic structures of the basement floor during the execution and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701665882
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701724476
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-06-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations during the implementation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701335048
Unscheduled inspection
Start date: 2017-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701095976
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the window installation process with the completed stage of the 9th floor ceiling installation as well as the construction materials used during the construction of the capital construction facility and the results of such work with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700083768
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-09-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the processes of installing a monolithic floor covering of the 8th floor of the building's columns, stairs, as well as the construction materials used during the construction of a capital construction facility, the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.