# 742100493032
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100374194
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100290762
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of polyethylene pipes of the gas pipeline and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100217950
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the trench development work, the installation of a sand base, the welding of polyethylene pipes of a gas pipeline and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 741800627781
Unscheduled inspection
Start date: 2018-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800627743
Unscheduled inspection
Start date: 2018-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800605562
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800552937
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work backfilling of the gas pipeline trench installation of the GRPB after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800515651
Unscheduled inspection
Start date: 2018-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800492950
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of sections of a low-pressure gas pipeline the development of a trench the installation of a foundation welding insulation of joints laying of a pipeline backfilling during the work Installation of aboveground sections of a low-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting during the work and the construction materials used during the construction of a capital construction facility as well as the results of such work requirements technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800430859
Unscheduled inspection
Start date: 2018-06-11, end date: 2018-06-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed breakdown of the gas pipeline route installation of low-pressure gas pipeline sections development of a trench foundation installation welding insulation of joints laying of the pipeline backfilling during the work Installation of aboveground sections of the low-pressure gas pipeline drilling holes for supports installation of concrete foundations supports installation of supports installation painting during the work and the construction materials used during the construction of the capital construction facility as well as the results of such works to the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800447399
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the gas pipeline testing, the reclamation pipeline route layout and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800330302
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the GRP installation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of compliance with the regulations from 30032018 with a deadline until 16042018
# 741800276499
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks, gas pipeline installation, and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of compliance with regulations from 30032018 with a deadline of 16042018
# 741800201626
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of a medium-pressure gas pipeline connection to an above-ground gas pipeline testing and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74180803053686
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74180803058066
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the work performed installation of a gas pipeline made of electric-welded steel pipes installation of a gas turbine unit commissioning painting testing and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74180803058183
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of polyethylene pipes laying of a signal tape backfilling of a trench testing of a gas pipeline installation of a gas pipeline commissioning and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802965133
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of support posts installation of a gas pipeline made of steel electro-welded pipes and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802965130
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work punctures through the railway laying of casings installation of a medium-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802965112
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work preparatory work installation of a trench of a sandy base installation of polyethylene pipes of an underground gas pipeline installation of racks installation of steel pipes of an above-ground gas pipeline and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802815900
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work preparatory work installation of heating networks for water supply and sewerage installation of gas pipeline support posts and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170801933099
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of exits to houses and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701775101
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development, pipe laying, and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701733133
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work breakdown of the gas pipeline route excavation on a high and low pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling after completion of work installation of a GRP and the construction materials used during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 Receipt of a construction permit 3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701243259
Unscheduled inspection
Start date: 2016-12-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701106288
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on sections PK0 PK0+1773 PK2+645 PK3+50 PK4+805 PK5+30 PK9+248 PK11+573 PK13+80 PK14+39 PK15+741 PK23+685 PK24+541 PK27+28 trench development sand cushion installation welding joint insulation laying of high-pressure gas pipeline backfilling after completion of works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701051729
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700972416
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the GRP installation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701019612
Unscheduled inspection
Start date: 2016-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700915909
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work Preparatory work breakdown of the gas pipeline route digging holes for the gas pipeline supports installation and concreting of the gas pipeline support pillars and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74160700794932
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work backfilling of the trench installation of support posts brackets installation of steel pipes priming painting of support posts of steel pipes of the gas pipeline grounding device testing of the gas pipeline and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74160601739039
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work breakdown of the route of the high and low pressure gas pipeline Installation of underground and aboveground sections of the high and low pressure gas pipeline Excavation development of a trench installation of a sand cushion Welding insulation of joints Laying of the gas pipeline backfilling Installation of aboveground sections of the low pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation Installation of GRPS commissioning 2 Receipt of construction permits 3 Compliance with the requirements of hh 23 st52 The Urban Planning Code of the Russian Federation
# 74160601732962
Unscheduled inspection
Start date: 2016-07-26, end date: 2016-08-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work execution Alignment work digging trenches laying foundations laying PE pipes making connections to houses and building materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations, norms and rules of other regulatory legal acts, as well as design work and organizational and technological documentation, including energy efficiency requirements and equipment requirements of a capital construction facility metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of Part 23 of Article 52 of the Urban Planning Code of the Russian Federation
# 74160601709708
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work Breakdown of the gas pipeline route Excavation on the high-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of the pipeline backfilling during and after completion of work Installation of aboveground sections of the high-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting during and after completion of work2 Receipt of construction permits 3compliance with the requirements of hh 23 st52 The Urban Planning Code of the Russian Federation