Found 13 inspections:

# 742201533463
Unscheduled inspection
Start date: 2022-02-08, end date: —, duration:
Authority:
Purpose of inspection:


# 742101395233
Unscheduled inspection
Start date: 2021-12-03, end date: 2021-12-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 09/17/2021 with a deadline until 11/17/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742101375307
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 742100677302
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 742100308872
Unscheduled inspection
Start date: 2021-06-23, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms.


# 741903168685
Unscheduled inspection
Start date: 2019-09-03, end date: 2019-09-30, duration:
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out federal state supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the received appeals from employees dated 15082019 bx 747372419B dated 29082019 bx 747396419B on the issue of violation of labor rightsthe objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms. The purpose of this audit is to monitor compliance with labor legislation and other regulatory legal acts containing labor law norms. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 741802138783
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741802045222
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the landscaping of the territory adjacent to the kindergarten for the installation of small architectural forms and playgrounds for landscaping for the decoration of the basement for the installation of pits at the entrance to the basement and porches for the installation of an outdoor electric lighting system and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation 2 Availability of a permit for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801757138
Unscheduled inspection
Start date: 2018-10-02, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800596939
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration:
Authority:
Purpose of inspection:


# 741800533555
Unscheduled inspection
Start date: 2018-07-11, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800486620
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the zero cycle construction work, the installation of a prefabricated strip foundation made of PL concrete slabs and FBS blocks before the start of work on waterproofing the foundations and backfilling the sinuses of the excavation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of the HH Articles 23 and 31 of the Urban Planning Code of the Russian Federation


# 741800433544
Unscheduled inspection
Start date: 2018-06-09, end date: 2018-06-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the building axes during excavation work on the development of a foundation pit on compliance with fire and sanitary epidemiological measures prior to the installation of the ribbon foundation and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.