# 742100182136
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the gas pipeline and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742004378010
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-06, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po CHelyabinskoi oblasti
Purpose of inspection: this audit is carried out in order to verify the fulfillment by a legal entity of a previously issued instruction to eliminate identified violations of mandatory requirements 22208 dated 05032019, the deadline for which expired 05032020 the objectives of this audit are to verify compliance with mandatory requirements of the legislation of the Russian Federation The subject of this audit is compliance with mandatory requirements compliance with the instructions of state control bodies
# 741800607772
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of medium and low pressure pipelines installation of GRPSH and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800613025
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-08-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on priming and painting of a low-pressure gas pipeline, purging, leakproofness testing of a low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800612969
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800572025
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on purging, leakproofness testing of a low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800569466
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800569604
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800569685
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of medium and low pressure pipelines installation of GRPSH and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800525786
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of valves and purge valves on an underground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800556912
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800556934
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of valves and purge valves on an underground low-pressure gas pipeline along Komarova ul. Blucher ul. Mira and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800499923
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800499574
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800456016
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of the trench laying of the pipeline along Komarova ul. Blucher ul. Mira and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800455981
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of the trench laying of the pipeline along Volodarsky Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800455942
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of low-pressure gas pipeline foundation supports and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800421976
Unscheduled inspection
Start date: 2018-06-11, end date: 2018-06-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a low-pressure pipeline along Kalinina St. Komsomolskaya St., Shkolny St. Sovetskaya Lane and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800485239
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484781
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800357814
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the backfill gas pipeline pipe along Ryabinova Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800357763
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the backfill gas pipeline pipe along Severnaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800285905
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The existence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800285850
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800201541
Unscheduled inspection
Start date: 2018-03-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800099209
Unscheduled inspection
Start date: 2018-02-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800008511
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during preparatory work during the laying of an underground gas pipeline from PK0A+575 doPK3A+380 with the device of the case between PK2A and PK3A and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802938033
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of GRPB, the installation of PE cranes and purge cranes on an underground low-pressure gas pipeline for concreting carpets, purging of high and low-pressure gas pipelines, installation of purge candles on dead-end sections of an underground low-pressure gas pipeline, leakproofness testing of the gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the difference Building permits 3fulfilling the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802926811
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802872436
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of a trench, the laying of a low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802773032
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802816629
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the gas pipeline along 6th 7th 8th 9th 10th 11th Zakamenskaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 74170802762110
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-11-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of a trench, the laying of a high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802728613
Unscheduled inspection
Start date: 2017-10-20, end date: 2017-11-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802707620
Unscheduled inspection
Start date: 2017-10-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802167498
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of PE cranes and purge cranes on an underground low-pressure gas pipeline to concreting of carpets and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802275339
Unscheduled inspection
Start date: 2017-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801989221
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of pits for pouring foundations of supports, installation of supports and an above-ground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170801918388
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of a trench laying of a low-pressure gas pipeline laying of cases laying of a signal tape backfilling along the streets laying of a gas pipeline and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701832557
Unscheduled inspection
Start date: 2017-08-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701784701
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of excavation work development of a trench laying of a pipeline laying of cases backfilling along Shkolnaya Sovetskaya Gorky Komsomolskaya Street of the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701336089
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the gas pipeline along 2nd 3rd 4th Bolshaya Zakamenskaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701285917
Unscheduled inspection
Start date: 2017-01-18, end date: 2017-01-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying and backfilling of the gas pipeline with the installation of GRPSH and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701160395
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance of the work on the installation of a trench for laying a gas pipeline along 7y8ya Zakamenskaya Street and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701182468
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the development of a trench, the installation of a trench base from PK0 to PK2+685, welding of PE lashes of a gas pipeline on the ground, the installation of fence supports for shut-off valves, the development of a trench for an incoming gas pipeline, the installation of a trench base for an incoming gas pipeline, the installation of basement inlets and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of project documentation2 Building permits 3fulfilling the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701182653
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Development of the route for laying the distribution gas pipeline preparation of the sand base with a layer of 100mm welding of the PE gas pipeline DN 90 digging pits for installation and concreting of fence supports gate valves at the point of insertion and identification columns development of the route for laying the distribution gas pipeline preparation of the sand base with a layer of 100mm welding of the PE gas pipeline DN 63 installation of basement inlets preparation of cases DN 110 laying of the distribution gas pipeline in the trench powder laying of a distribution gas pipeline with a 200 mm layer of sand laying of a signal tape laying of a distribution gas pipeline in a trench sprinkling of a distribution gas pipeline with a 200 mm layer of sand laying of a signal tape 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701246597
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on laying distribution and supply gas pipelines into the trench, sprinkling the gas pipeline, laying the signal tape, sprinkling the basement pipes, backfilling the trench, installing vertical cases on the basement inlets, installing shut-off valves, installing picket signs, fencing the shut-off valves at the point of insertion, painting the fence, painting the outer part of the gas pipeline, landscaping the construction site and building materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701241248
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of backfilling of the distribution gas pipeline and sections of the supply gas pipeline of a horizontal layout with the collapse of trenches installation of vertical cases on the basement entries installation of cranes installation of gate valve fencing painting of gate valve fencing at the point of insertion and identification columns and construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 Availability of construction permits 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701228356
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying and backfilling of the gas pipeline with the installation of GRPSH and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701137786
Unscheduled inspection
Start date: 2016-11-30, end date: 2016-12-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of an aboveground high and low pressure steel gas pipeline to 6ya Zakamenskaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700930882
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance of the work on the construction of the trench and laying of the gas pipeline and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700995737
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance of the work on backfilling and crimping of the gas pipeline and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601708462
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation and concreting of carpets, restoration of landscaping and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 00150601324977
Unscheduled inspection
Start date: 2015-11-16, end date: 2015-11-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: license control for reissue