# 742101436088
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-12-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of internal power supply networks, heat supply, roofing, installation of stained glass systems and building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742101193161
Unscheduled inspection
Start date: 2021-10-14, end date: 2021-10-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a monolithic belt, the installation of reinforced concrete structures of the basement (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742101215246
Unscheduled inspection
Start date: 2021-10-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100515159
Unscheduled inspection
Start date: 2021-08-27, end date: 2021-09-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of an ITP, the installation of an internal heat supply system and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100454985
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100338207
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-07-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 05/31/2021 with a deadline until 06/30/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100273214
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-17, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of external water supply networks B1, B2, the installation of fire tanks, bricklaying of partitions, walls, compliance with fire and sanitary-epidemiological measures and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100227531
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100092709
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete walls, columns, slabs up to +10,800, monolithic reinforced concrete stairs up to +7,200, masonry walls up to +0.000, +3,600 and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), This includes energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005243945
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete walls, columns, slabs at otm +3600 +7200 monolithic reinforced concrete stairs up to otm +3600 and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005223786
Unscheduled inspection
Start date: 2020-11-19, end date: 2020-11-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation after completion of the work, the filling of window openings after completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005235560
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-11-24, duration: 2
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work on the installation of internal water supply, sanitation, heating, ventilation, electricity and low-current networks after completion of work Facade finishing after completion of work Interior finishing after completion of work Landscaping after completion of work Compliance with fire and sanitary epidemiological requirements as well as measures to ensure access for low mobility groups and used building materials during construction reconstruction of the capital construction facility and as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including including energy efficiency requirements with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005206790
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the order dated 28092020 the deadline for execution is 26102020 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005236146
Unscheduled inspection
Start date: 2020-11-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005145667
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the performance of work on the installation of reinforced concrete walls columns plates on otm 0130 +2620 +4670 reinforced concrete slabs for otm +3930 +2230 monolithic reinforced concrete stairs up to otm +3260 and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, according to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code and project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply. and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005147187
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation dated 31082020, due in 2009-2020, 2 Availability of a construction permit, 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005180283
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures on the 3rd 4th 5th and technical floors after completion of the work with the roofing during the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004482722
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-08-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic belt, the installation of reinforced concrete structures on the ground floor after completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004436215
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004295115
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741904033774
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904033771
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of an internal system of cold and hot water supply sewerage air conditioning fire alarm low current systems and building materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 The availability of a permit on construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904083895
Unscheduled inspection
Start date: 2019-12-19, end date: 2019-12-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the internal ventilation system, electrical supply, finishing work, compliance with fire and sanitary and epidemiological measures, measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, as amended included in the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with devices accounting for the energy resources used2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903981648
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external electricity, heat, and water supply networks and the construction materials used during the construction and reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903981762
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with work performance Installation of housing and communal services on floors 1 2 3 4 and 5 Installation of a technical floor Installation of a roof after completion Installation of translucent structures windows after completion Installation of internal water supply systems for drainage heating ventilation power supply and low current networks after completion of work Interior finishing works of the MOE after completion of work Fire and sanitary epidemiological measures measures to ensure access for the disabled after completion works and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and the maintenance of an information model is mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903842956
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903857766
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the landscaping works, the installation of internal heating systems and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903082490
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903387346
Unscheduled inspection
Start date: 2019-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902954817
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902889967
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the repair of the heating system, the installation of brickwork partitions and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902867425
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-07-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on dismantling partitions walls and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902806651
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work, compliance with fire and sanitary epidemiological measures and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902701858
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal water supply, sanitation, heating, ventilation, electricity and low-current networks after completion of the work, Interior finishing works, after completion of the work, fire and sanitary and epidemiological measures, measures to ensure access for the disabled and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation2 Availability of a construction permit3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902701907
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the roof installation after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902697265
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902721307
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902719183
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-06-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902719157
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902648657
Unscheduled inspection
Start date: 2019-04-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902648722
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-04-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of the roof after completion of the work, the installation of translucent structures of the window after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902648777
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-04-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of the roof after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902651954
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-05-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of internal water supply and sanitation systems, the installation of fire alarms and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902584297
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of the 4th and 5th floors after completion of the work installation of the technical floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902584267
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902584228
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of the 4th and 5th floors after completion of the work installation of the technical floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902514394
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of the 2nd and 3rd floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902514370
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of the 2nd and 3rd floors after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902514290
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of the 2nd and 3rd floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902524763
Unscheduled inspection
Start date: 2019-02-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902443687
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of a monolithic belt, the installation of a basement concrete block, the installation of a 1st floor concrete block after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902443651
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902443590
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of a monolithic belt, the installation of a basement concrete block, the installation of a 1st floor concrete block after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802153371
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802153636
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802153255
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802153310
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802138966
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external water supply sewerage networks and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 741801976499
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-10-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of floors of the production building, installation of the vent facade of the ABC, finishing works of the ABC, ventilation of the ABC and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 741801785568
Unscheduled inspection
Start date: 2018-10-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800340081
Unscheduled inspection
Start date: 2018-05-08, end date: 2018-05-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal walls of the ABC with the device of the roofing pie of the production building and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 741800285127
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal walls of the production building and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 741800179621
Unscheduled inspection
Start date: 2018-03-14, end date: 2018-03-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures of the production building and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 74170802872823
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the foundations of the production building with the observance of fire-fighting and sanitary-epidemiological measures and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 74170701705218
Unscheduled inspection
Start date: 2017-06-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701631278
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701543226
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work masonry of walls of ventilation ducts installation of 3 floors after completion of work Installation of window and door blocks during work Installation of external water supply and sanitation networks heat and electricity after completion of work Installation of internal water supply and sanitation systems heat and electricity supply during work and the construction materials used during the construction of a capital construction facility as well as the results of such work to the technical requirements regulations of the project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701449550
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work masonry of the walls of the ventilation ducts installation of the concrete block of the 2nd floor after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701397637
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work masonry walls of vent channels installation of the 1st floor concrete block after completion of work masonry walls of vent channels installation of the 2nd floor concrete block during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701320387
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work masonry of the walls of the ventilation ducts installation of the 1st floor concrete block during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701230726
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701226554
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the execution of the regulation of 27102016G2THE receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701247663
Unscheduled inspection
Start date: 2016-12-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700995930
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of a pile field after completion of the work, the installation of a monolithic grillwork and foundations during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700434356
Unscheduled inspection
Start date: 2016-09-13, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160700123680
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-09-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the execution of the regulation from 12082016G2THE receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700883948
Unscheduled inspection
Start date: 2016-09-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700574316
Unscheduled inspection
Start date: 2016-09-19, end date: 2016-09-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed, the breakdown of axes, earthworks, the arrangement of a pile field during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601771543
Unscheduled inspection
Start date: 2016-08-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700056895
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of the completed stage of the metal frame installation in axes 1115 along the rows of AL, the process of installing monolithic floors, superstructures, extensions of existing stairwells, as well as the construction materials used during the construction of the capital construction facility, the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700053370
Unscheduled inspection
Start date: 2016-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160601722138
Unscheduled inspection
Start date: 2016-07-20, end date: 2016-07-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external engineering networks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation