# 742100182144
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the gas pipeline and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 741902924287
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of PHB in the course of work, the strapping of PHB, the lightning protection device for electricity supply in the course of work, the painting of an above-ground gas distribution pipeline in the course of work, the leakproofness tests of high and low pressure gas pipelines in the course of work, the restoration of landscaping of the construction site after completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902861075
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the organization of the construction site according to the project breakdown of the high and low pressure gas pipeline route installation of high and low pressure gas pipeline sections development of a trench foundation installation welding insulation of joints laying of the pipeline laying of cases backfilling installation during work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902883581
Unscheduled inspection
Start date: 2019-07-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800607747
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800612943
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800613053
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-08-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on priming and painting of a low-pressure gas pipeline, purging, leakproofness testing of a low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800572048
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po produvke ispytaniyu na germetichnost gazoprovoda nizkogo davleniya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Nalichie razresheniya na stroitelstvo 4 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800569718
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of medium and low pressure pipelines installation of GRPSH and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800569654
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of medium and low pressure pipelines installation of GRPSH and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800569412
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800525754
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800556881
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of valves and purge valves on an underground low-pressure gas pipeline along Komarova ul. Blucher ul. Mira and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800556832
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu gazoprovoda nizkogo davleniya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800456012
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of the trench laying of the pipeline along Volodarsky Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800456040
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of the trench laying of the pipeline along Komarova ul. Blucher ul. Mira and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800455970
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of low-pressure gas pipeline foundation supports and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800422081
Unscheduled inspection
Start date: 2018-06-11, end date: 2018-06-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a low-pressure pipeline along Kalinina St. Komsomolskaya St., Shkolny St. Sovetskaya Lane and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484992
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800485180
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484831
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484500
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484576
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800357804
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the backfill gas pipeline pipe along Ryabinova Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800357798
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the backfill gas pipeline pipe along Severnaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800285940
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The existence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800285706
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802938067
Unscheduled inspection
Start date: 2017-12-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802926995
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of an aboveground low-pressure steel gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802926960
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802926760
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of an aboveground low-pressure steel gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802773081
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802772901
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802872374
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of a trench, the laying of a low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802772985
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802816575
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the gas pipeline along 6th 7th 8th 9th 10th 11th Zakamenskaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 74170802707584
Unscheduled inspection
Start date: 2017-10-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802167499
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of PE cranes and purge cranes on an underground low-pressure gas pipeline to concreting of carpets and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802290942
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-10-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802275417
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu gazoprovoda po ul Lapshina Rabochaya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170801989224
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of pits for pouring foundations of supports, installation of supports and an above-ground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170801919146
Unscheduled inspection
Start date: 2017-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701832585
Unscheduled inspection
Start date: 2017-08-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701784382
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu gazoprovoda i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74170701784684
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of excavation work development of a trench laying of a pipeline laying of cases backfilling along Shkolnaya Sovetskaya Gorky Komsomolskaya Street of the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701581565
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of the gas pipeline along Burevestnik Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701634954
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of the gas pipeline along the street of the Republic of Vanina Street with the observance of fire and sanitary epidemiological measures and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701336115
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the gas pipeline along 2nd 3rd 4th Bolshaya Zakamenskaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701285569
Unscheduled inspection
Start date: 2017-01-18, end date: 2017-01-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying and backfilling of the gas pipeline with the installation of GRPSH and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701160433
Unscheduled inspection
Start date: 2016-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701228374
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying and backfilling of the gas pipeline with the installation of GRPSH and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701137777
Unscheduled inspection
Start date: 2016-11-30, end date: 2016-12-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of an aboveground high and low pressure steel gas pipeline to 6ya Zakamenskaya Street and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701086565
Unscheduled inspection
Start date: 2016-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701029720
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700584883
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka ustanovki PE kranov i produvochnyh kranov na podzemnom gazoprovode nizkogo davleniya ustanovka produvochnyh svechei na tupikovyh uchastkah podzemnogo gazoprovoda nizkogo davleniya betonirovanie koverov soblyudenie voprosov sanitarnoepidiologicheskih trebovanii i pozharnoi bezopasnosti primenyaemyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160700065243
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 proverka razrabotki transhei pod ukladku uchastkov podvodyaschih gazoprovodov k zhilym domam i obratnaya zasypka primenyaemyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 st 52 Gradostroitelnogo kodeksa RF
# 74160601781881
Unscheduled inspection
Start date: 2016-08-15, end date: —, duration: —
Authority: —
Purpose of inspection: