Found 60 inspections:

# 001902776990
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives control of the execution of the instruction of the Siberian Directorate of Rostechnadzor 2506063 dated 22032019 on the elimination of identified offenses, the deadline for which has expired The task is to prevent the detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Subject to compliance with the instructions of the federal state construction supervision authorities


# 001902776891
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902776852
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose control of the execution of the order of the Siberian Directorate of Rostechnadzor 2506050 dated 15032019 on the elimination of identified offenses, the deadline for which has expired Tasks prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation Subject to compliance with the regulations of the federal state construction supervision authorities


# 001902776766
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objective Control of the execution of the instruction of the Siberian Directorate of Rostechnadzor 2506049 dated 15032019 on the elimination of identified offenses, the deadline for which has expired. The task is to prevent the detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation. The subject is to comply with the instructions of the federal state construction supervision authorities


# 001902776578
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the implementation of the order of the Siberian Directorate of Rostechnadzor 2506047 dated 15032019 on the elimination of identified offenses, the deadline for which has expired Tasks are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation Subject to compliance with the regulations of the federal state construction supervision authorities


# 001802094014
Unscheduled inspection
Start date: 2018-11-20, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 422101358133
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The goal is to ensure the conformity of the work performed and the construction materials and products used in the course of excavation, installation of culverts, installation of ditches, excavation and underlying layers of pavement, installation of industrial and fire-fighting water supply. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject is compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning.


# 422101373419
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: compliance of the work performed and the construction materials and products used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Civil Code of the Russian Federation, are part of such design documentation); Task: compliance with legal requirements of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422101266197
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: compliance of the work performed and the construction materials and products used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Civil Code of the Russian Federation, are part of such design documentation); Task: compliance with legal requirements of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422101248103
Unscheduled inspection
Start date: 2021-10-21, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the fulfillment by DSPK Dorozhnik LLC of inspection regulations No. 02-16-21-01 dated 09/08/2021. The task is to check the elimination of violations committed during the construction of a capital construction facility. The subject is the execution of Regulation No. 02-16-21-01 dated 09/08/2021.


# 422100540920
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: compliance of the work performed and the construction materials and products used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Civil Code of the Russian Federation, are part of such design documentation); Task: compliance with legal requirements of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422100550504
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials and products used in the course of excavation, installation of culverts, installation of ditches, excavation and underlying layers of pavement, installation of industrial and fire-fighting water supply. The task is to verify compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject is compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning.


# 422100318111
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 422100078324
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: verification of compliance of the work performed and the construction materials used in the course of work; Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422105289546
Unscheduled inspection
Start date: 2021-01-14, end date: 2021-01-20, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: verification of compliance of the work performed and the construction materials used in the course of work; Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422005230398
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-11-27, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422005214429
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-11-27, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422005145076
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422004490551
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-17, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the fulfillment of the inspection instruction 05111901 from 18062020 the task is to verify the elimination of violations during construction the subject is the fulfillment of the inspection instruction 05111901 from 18062020


# 422004446188
Unscheduled inspection
Start date: 2020-07-07, end date: 2020-07-15, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422004446067
Unscheduled inspection
Start date: 2020-07-03, end date: 2020-07-07, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422004431536
Unscheduled inspection
Start date: 2020-06-17, end date: 2020-06-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422004432554
Unscheduled inspection
Start date: 2020-06-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 422004347386
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-04-29, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the building materials used in the course of general construction work, as well as the results of such work, with the requirements of the design documentation and to verify compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation. The task and subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during construction


# 422004347381
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-04-29, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the building materials used in the course of general construction work, as well as the results of such work, with the requirements of the design documentation and to verify compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation. The task and subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during construction


# 422004342395
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-10, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the building materials used in the course of general construction work, as well as the results of such work, with the requirements of the design documentation and to verify compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation. Task and subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during construction


# 422004252119
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-05, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 422004202232
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903887098
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-11-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903554327
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903009752
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902840401
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of the fulfillment of the inspection instruction 05261802 dated 14062019 task verification of the elimination of violations during construction subject to the fulfillment of the inspection instruction 05261802 dated 14062019


# 421902787327
Unscheduled inspection
Start date: 2019-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 421902846499
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-07-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001902858632
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objective Control of the execution of paragraph 7 of the instruction of the Siberian Directorate of Rostechnadzor 2506050 dated 15032019 on the elimination of identified offenses, the deadline for which has expired. The task is to prevent the detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation. The subject is to comply with the instructions of the federal state construction supervision authorities


# 421902787319
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 001902776990
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives control of the execution of the instruction of the Siberian Directorate of Rostechnadzor 2506063 dated 22032019 on the elimination of identified offenses, the deadline for which has expired The task is to prevent the detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Subject to compliance with the instructions of the federal state construction supervision authorities


# 001902776891
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose of monitoring the execution of the order of the Siberian Directorate of Rostechnadzor 2506051 dated 15032019 on the elimination of identified offenses, the deadline for which has expired. The task is to prevent the detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation. The subject is to comply with the instructions of the federal state construction supervision authorities


# 001902776852
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose control of the execution of the order of the Siberian Directorate of Rostechnadzor 2506050 dated 15032019 on the elimination of identified offenses, the deadline for which has expired Tasks prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation Subject to compliance with the regulations of the federal state construction supervision authorities


# 001902776766
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objective Control of the execution of the instruction of the Siberian Directorate of Rostechnadzor 2506049 dated 15032019 on the elimination of identified offenses, the deadline for which has expired. The task is to prevent the detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation. The subject is to comply with the instructions of the federal state construction supervision authorities


# 001902776608
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives control of the execution of the instruction of the Siberian Directorate of Rostechnadzor 2506048 dated 15032019 on the elimination of identified offenses, the deadline for which has expired Tasks prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor, including project documentation Subject compliance with the instructions of the federal state construction supervision authorities


# 001902776578
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the implementation of the order of the Siberian Directorate of Rostechnadzor 2506047 dated 15032019 on the elimination of identified offenses, the deadline for which has expired Tasks are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation Subject to compliance with the regulations of the federal state construction supervision authorities


# 421902719663
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of the fulfillment of the inspection instruction 05261801 dated 11042019 task verification of the elimination of violations during construction subject to the fulfillment of the inspection instruction 05261801 dated 11042019


# 421902613753
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902507836
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001802094014
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the implementation of the order of the Siberian Directorate of Rostechnadzor 2506228 dated 19102018 on the elimination of identified offenses, the deadline for which has expired Tasks are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, the contractor, the subject is to comply with the instructions of the federal state construction supervision authorities


# 421802051498
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802126224
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration:
Authority: Ministerstvo truda i zanyatosti naseleniya Kuzbassa
Purpose of inspection: The audit is conducted in order to monitor the implementation by DSPK Dorozhnik LLC of the regulations on the elimination of violations of the legislation on employment of the population dated 26042018 5 The purpose of this audit is to monitor the implementation by DSPK Dorozhnik LLC of the regulations on the elimination of violations of the legislation on employment of the population dated 26042018 5 The subject of this audit is the implementation by DSPK Dorozhnik LLC of the regulations on the elimination of violations of the legislation on employment of the population dated violations of the legislation on employment of the population from 26042018 5


# 421801582028
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801570385
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801570282
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800651637
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-08-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800651590
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 421800560544
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-08-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800587435
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800587365
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800548706
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800548700
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 42170802892549
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration:
Authority:
Purpose of inspection:


# 42170701286613
Unscheduled inspection
Start date: 2017-01-12, end date: 2017-01-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose Verification of the execution of regulation 02141408 of 16122016 Task verification of the elimination of violations committed during construction Subject Verification of the execution of regulation 02141408 of 16122016


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.