# 00170701800788
Unscheduled inspection
Start date: 2017-07-14, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701819488
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Issuance of a permit for the commissioning of power plants
# 00170701800779
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-12, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 111 Visual inspection of objects of technical devices and the adjacent territory with the use, if necessary, of photographs and videotapes112 Examination of documents the presentation of which is provided for in paragraph 13 of this order 113 Assessment of the reliability of information previously submitted to the Ural Department of Rostechnadzor with the actual data 114 Application of measures to prevent identify and suppress violations of mandatory requirements 115 In case of detection of violations of mandatory requirements or unjustified obstacles to the holding of events to take measures provided for by law to bring persons who have committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation 116 Sending materials to law enforcement and other bodies on violations of mandatory requirements to resolve the issue of initiating criminal and administrative cases in accordance with their powers
# 00170701819489
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Issuance of a permit for the commissioning of power plants
# 00170701810289
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 742101325337
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101224567
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100492963
Unscheduled inspection
Start date: 2021-08-26, end date: 2021-09-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of monolithic columns and ceilings on floors 22-23 and the installation of the roof and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100337983
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100276903
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-06-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of monolithic columns and floors of 13-18 floors and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100161180
Unscheduled inspection
Start date: 2021-04-27, end date: 2021-05-05, duration: 6
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of monolithic columns and floors of 10-12 floors and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100051502
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of monolithic columns and floors of floors 7-9 and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and facility equipment requirements capital construction with metering devices for used energy resources;
2. Availability of a building permit.
3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742105317984
Unscheduled inspection
Start date: 2021-01-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005274621
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005138645
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the organization of the construction site, the foundation pit, the foundation slab, the waterproofing of the foundation and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with Parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00170701800788
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 111 Visual inspection of objects of technical devices and the adjacent territory with the use, if necessary, of photographs and videotapes112 Examination of documents the presentation of which is provided for in paragraph 13 of this order 113 Assessment of the reliability of information previously submitted to the Ural Department of Rostechnadzor with the actual data 114 Application of measures to prevent identify and suppress violations of mandatory requirements 115 In case of detection of violations of mandatory requirements or unjustified obstacles to the holding of events to take measures provided for by law to bring persons who have committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation 116 Sending materials to law enforcement and other bodies on violations of mandatory requirements to resolve the issue of initiating criminal and administrative cases in accordance with their powers
# 00170701819488
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Issuance of a permit for the commissioning of power plants
# 00170701800779
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-12, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 111 Visual inspection of objects of technical devices and the adjacent territory with the use, if necessary, of photographs and videotapes112 Examination of documents the presentation of which is provided for in paragraph 13 of this order 113 Assessment of the reliability of information previously submitted to the Ural Department of Rostechnadzor with the actual data 114 Application of measures to prevent identify and suppress violations of mandatory requirements 115 In case of detection of violations of mandatory requirements or unjustified obstacles to the holding of events to take measures provided for by law to bring persons who have committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation 116 Sending materials to law enforcement and other bodies on violations of mandatory requirements to resolve the issue of initiating criminal and administrative cases in accordance with their powers
# 00170701819489
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Issuance of a permit for the commissioning of power plants
# 00170701810289
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170701682878
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-07-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701682877
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701600434
Unscheduled inspection
Start date: 2017-05-12, end date: 2017-05-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof waterproofing work after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701600433
Unscheduled inspection
Start date: 2017-05-12, end date: 2017-05-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof waterproofing work after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701645582
Unscheduled inspection
Start date: 2017-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701645580
Unscheduled inspection
Start date: 2017-05-26, end date: 2017-06-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of window blocks, electrical work, plumbing work, finishing work, elevator installation, landscaping and landscaping work before laying asphalt concrete and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701529687
Unscheduled inspection
Start date: 2017-04-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701529684
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-04-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures of the ground floor with the installation of supporting and enclosing structures of 510 floors of the technical floor of the parapet before the installation of roofing panels and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701464204
Unscheduled inspection
Start date: 2017-03-23, end date: 2017-03-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the ground floor, the installation of supporting and enclosing structures of the 14th floor before the installation of supporting and enclosing structures of the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701464203
Unscheduled inspection
Start date: 2017-03-23, end date: 2017-03-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the ground floor, the installation of supporting and enclosing structures of the 14th floor before the installation of supporting and enclosing structures of the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701391259
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-02-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701391234
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-02-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701302371
Unscheduled inspection
Start date: 2017-01-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701302369
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the pile works before the start of work on the foundations and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701331286
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of a capital construction facility 2 Receipt of a construction permit 3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701254232
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, the development of the excavation before the start of pile work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701254231
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, the development of the excavation before the start of pile work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700764057
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal cold and hot water supply and sanitation networks of the heating system of the internal electrical work of the residential building in the block sections in the axes “14”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700082947
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-09-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on filling window openings and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700861962
Unscheduled inspection
Start date: 2016-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700862067
Unscheduled inspection
Start date: 2016-09-28, end date: 2016-10-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700121148
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal networks of cold and hot water supply systems, heating and sanitation of an individual thermal power supply point and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601736409
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the construction control during the backfilling of the sinuses of the excavation of an apartment building in the axes “14”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601794918
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-08-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of heat supply pipelines and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601775603
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on filling the window openings of 110 floors in the third block section in the axes “14”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601723429
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-07-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of construction control during the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs of stairwell shafts, sanitary cabins, ventilation units of 810 floors, structures of the technical floor of the parapet until the end of the installation of roofing panels in axes in axes “14”“AB” and the building materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601709746
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-07-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of construction control during the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 810 floors of technical floor structures and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation