Found 46 inspections:

# 772004309765
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor Compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including the requirements of energy efficiency efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used


# 342004255885
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 772004205935
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 341904036179
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciib zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa RF dalee Kodeks proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 341903712152
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proveka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciizadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa RF dalee Kodeks proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 771903527511
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-10-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 77190803476241
Unscheduled inspection
Start date: 2019-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 341902904550
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciizadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 77190803450680
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 341902808878
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciizadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 77190803398324
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 341902643419
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 341902643276
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 77190803366388
Unscheduled inspection
Start date: 2019-03-07, end date: 2019-03-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 341902520003
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 341902519794
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341902519717
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 77180803302969
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 341802221328
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 341802221146
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 341801909311
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation. The purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this audit is to comply with the mandatory requirements regarding a the compliance of construction works, their results and the construction materials used with the requirements of the project documentation b the availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341801909369
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation. The purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this audit is to comply with the mandatory requirements regarding a the compliance of construction works, their results and the construction materials used with the requirements of the project documentation b the availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341801491191
Unscheduled inspection
Start date: 2018-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803235093
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-09-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803186298
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-09-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 341800619069
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 341800613904
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-08-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 77180803144516
Unscheduled inspection
Start date: 2018-06-12, end date: 2018-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 341800441816
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 341800441876
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF


# 771800414368
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-02, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: zaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya ot 14052018 71767418OB ot 17052018 71833118OB po voprosam oplaty truda oformleniya i rastorzheniya trudovogo dogovora


# 341800279236
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 77180803091257
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 341800065207
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: sootvetstvie deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii


# 341800065255
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: sootvetstvie deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii ispolnenie predpisaniya ot 23062017 19804


# 77180803056407
Unscheduled inspection
Start date: 2018-01-18, end date: —, duration:
Authority:
Purpose of inspection:


# 34170802832748
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802611567
Unscheduled inspection
Start date: 2017-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 34170802307022
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170701704139
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The audit is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationthe subject of this The purpose of the audit is to ensure compliance with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of technical regulations, project documentation, and the availability of a construction permit and compliance with established requirements for admission to construction work


# 77170701637199
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701602753
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 34170701534797
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The audit is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationthe subject of this The purpose of the audit is to ensure compliance with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of technical regulations, project documentation, and the availability of a construction permit and compliance with established requirements for admission to construction work


# 77170701425644
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701360416
Unscheduled inspection
Start date: 2017-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701316535
Unscheduled inspection
Start date: 2017-01-20, end date: 2017-02-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used