# 002101268529
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection:
# 002105349199
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Federalnaya sluzhba po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that this audit is carried out in order to control
the execution by a legal entity of the previously issued order of the Volga-Oka Department of Rostechnadzor dated October 02, 2020 No. RP-311-775- o/20/N/13.
The purpose of this audit is to carry out supervision
monitoring compliance with energy security requirements.
7. The subject of this audit is the fulfillment of the instructions
of the state control (supervision) body.
# 002005273765
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-21, duration: 6
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to verify the previously issued regulation 14872082056B dated August 31, 2020, the deadline for execution is October 31, 2020 upon receipt of the petition vh 30218689 dated 03122020 from the Public Joint Stock Company "Federal Grid Company of the Unified Energy System" represented by the branch "Nizhnevolzhsky Enterprise of Main Electric Networks to conduct an inspection in order to recognize the order fulfilled
# 002005297651
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005271714
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-17, duration: 3
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the execution by the branch of PJSC FGC UES Moscow Enterprise of Main Electric Networks of the previously issued order from 08092020 532426vnP03302020 hereinafter the Order, the deadline for which expired on the basis of an application received from the branch of PJSC FGC UES Moscow Enterprise of Main Electric Networks to conduct an inspection in order to recognize the Order fulfilled from 04122020 M1P912953 bx 21054490 from 08122020, the task of this audit is to establish the facts of non-fulfillment by the branch of PJSC FGC UES Moscow Enterprise of Main Electric Networks of the above-mentioned prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal entity
# 002005265923
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-04, duration: 15
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban planning activities, including technical regulations and design documentation during the construction of the capital construction facility "Construction of 330 kV overhead line ArtemDerbent Adjustment" reconstruction of 330 kV Derbent substation Stage 2 on the basis of paragraphs 113 of the inspection program from 19102020 case number 8803 The tasks of this inspection are and prevention, detection and suppression of violations of the legislation on urban planning activities committed by FGC UES PJSC, including technical regulations and design documentation during the reconstruction of the capital construction facility "Construction of 330 kV overhead line ArtemDerbent Correction" reconstruction of 330 kV Derbent 2 substation This audit is subject to compliance with mandatory requirements
# 002005295620
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005271045
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-11-25, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the previously issued order dated August 21, 2020 PRP2001178 The task is to establish the facts of the implementation of PJSC FGC UES MPMES branch of the above-mentioned order
# 002005237854
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-12-16, duration: 19
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to verify the implementation of the measures provided for in paragraphs of the instruction previously issued to the person being checked from 11092020 09261 on the elimination of identified violations of mandatory requirements in connection with the received petition C21975 from 05112020 bx 36140665 from 05112020 The task of this inspection is to establish the fact of elimination of previously identified violations of the instruction from 11092020 09261 The subject of this inspection is to verify the fulfillment of the instruction of the state body construction supervision from 11092020 09261
# 002005237849
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-12-16, duration: 19
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this check is carried out in order to verify the implementation of the measures provided for in paragraphs of the instruction previously issued to the person being checked from 11092020 09260 on the elimination of identified violations of mandatory requirements in connection with the received petition C21975 from 05112020 bx 36140665 from 05112020 The task of this check is to establish the fact of elimination of previously identified violations of the instruction from 11092020 09260 The subject of this check is to verify the fulfillment of the instruction of the state body construction supervision from 11092020 09260
# 002005209621
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration: —
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005249583
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005195871
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-11-05, duration: 13
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to control the preparation of electric power facilities for operation in complex technological modes in accordance with the order of Rostechnadzor "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period 2020 2021" dated 08072020 267 issued in accordance with the instruction of the Government of the Russian Federation dated 03072020 YUBP97109 The tasks of this inspection are to monitor the legal decisions taken by a person, an individual entrepreneur, measures to comply with the requirements affecting the readiness of electric power facilities to work in the autumn-winter period of mandatory requirements, taking measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory legal acts
# 002005195864
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005223234
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-12, duration: 8
Authority: Zabaikalskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the Order of the Acting Head of the Federal Service for Environmental Technological and Nuclear Supervision AV Trembitsky dated 08072020 g 267 "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period 20202021" in pursuance of the instruction of the Government of the Russian Federation dated 03072020 g YUBP97109 and monitoring the implementation of the previously issued instruction on the elimination of identified violations from 20072020 g 5509092020 a It is precisely the points 19 whose deadline has expired 11092020
# 002005202474
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution by the branch of PJSC FGC UES Moscow Enterprise of Backbone Networks of a previously issued prescription, the term of which has expired, the establishment of the facts of the fulfillment of non-fulfillment of the prescription
# 002005199228
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005246849
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-11-18, duration: 20
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of the 330 kV Mashuk substation increase in transformer capacity 1103510 kV and expansion of the RU 10 kV" on the basis of a notice of completion of the reconstruction of the capital construction facility from 07102020 M571159 vh 41018146 of 07102020 The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development activities committed by FGC UES PJSC, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of the 330 kV Mashuk substation, increase in transformer capacity 1103510 kV and expansion of the RU 10 kV"The subject of this audit is compliance with the mandatory requirements established by legal acts
# 002005206250
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005168009
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-09, duration: 5
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the previously issued instruction of the Siberian Department of Rostechnadzor dated 11092020 17180031POZP43 on the basis of an application received from the branch of the public joint Stock company Federal Grid Company of the Unified Energy System "West Siberian Enterprise of Main Electric Networks" vh 3427743 dated September 16, 2020 on conducting an unscheduled documentary check the purpose of this inspection is to prevent the detection and suppression of violations of the public Joint Stock Company "Federal Grid Company of the Unified Energy System" by its head and other officials of the requirements established by Federal Law No. 26032003 35 FZ "On Electric Power Industry" by other federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, the subject of this audit is the fulfillment of the previously issued order of the Siberian Directorate of Rostechnadzor dated 11092020 17180031POZP43 execution which must be recognized as having been performed using means of remote interaction , including photo and video materials
# 002005167940
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-09, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the previously issued instruction dated July 31, 2020 RP3223896oP on the basis of a petition from the branch of PJSC FGC UES Eastern Enterprise of Main Electric Networks dated September 17, 2020 M4P521126 prevention detection and suppression of violations of mandatory requirements established by regulatory legal acts compliance with the instructions of state control bodies supervision of municipal control bodies
# 002005202447
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-23, duration: 12
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control supervision of the implementation of the measures prescribed in paragraphs 1 to 23 of the previously issued regulation dated August 28, 2020 105200820225B the deadline for execution expired 25092020
# 002005222014
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 17
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Construction of 330 kV overhead line ArtemDerbent Adjustment" reconstruction of 330 kV Derbent substation Stage 2 on the basis of paragraphs 15 of the inspection program from 02062020 case number 8803 The tasks of this inspection are and prevention, detection and suppression of violations of the legislation on urban planning activities committed by FGC UES PJSC, including technical regulations and design documentation during the reconstruction of the capital construction facility "Construction of 330 kV overhead line ArtemDerbent Correction" reconstruction of 330 kV Derbent 2 substation This is the subject of this audit is compliance with mandatory requirements
# 002005215337
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-30, duration: 15
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The verification is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility "PS 330 kV Chiryurt 330 kV installation of an ice melting rectifier VUPG with an ice melting power transformer" Stage 2 based on paragraphs 18 of the inspection program from 03072020 Tasks of this inspection The purpose of the prevention, detection and suppression of violations of the legislation on urban planning activities committed by FGC UES PJSC, including technical regulations and design documentation during the reconstruction of the capital construction facility "PS 330 kV Chiryurt 330 kV installation of a rectifier device for melting ice VUPG with a power transformer for melting ice" 2 This is the subject of this inspection is compliance with mandatory requirements
# 002004491636
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-09-10, duration: 19
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is carried out to control the activities of legal licengineering entrepreneurs on compliance with legislation on town-planning of binding rules and regulations during the construction of the object of capital construction in accordance with the programme of inspections from 06092019 1 Objectives of this review are to exercise control over the observance of legal entities, individual entrepreneurs of the requirements of the legislation on town-planning of binding rules and regulations warning detection and suppression of violations of legislation on town-planning including project documentlibraries of this review is V compliance with legislation on town-planning деятельностиV compliance of works and construction materials used in the construction process of reconstruction of capital construction object and results such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy ресурсовV have permission to строительствоV performance persons engaged in the construction of the requirements of parts 2 and 3 31 of article 52 of the town planning code of the Russian Federation
# 002004463635
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004458501
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-24, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated July 8, 2020 267 "On monitoring the progress of preparation of heat supply facilities for operation in the autumn-winter period of 2020-2021" in pursuance of the instruction of the Government of the Russian Federation dated July 3, 2020 YUBP97109 The tasks of this audit are the prevention, detection and suppression of violations of mandatory requirements established by regulatory legal acts compliance with mandatory requirements or the requirements established by legal acts
# 002004457248
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration: —
Authority: Zabaikalskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004451705
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-06-29, duration: 2
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the execution of LLC Vimpelsetstroy of the previously issued order from 03022020 39RVA18 on the elimination of violations during the reconstruction of the capital construction facility "500 kV Nevinnomyssk Mozdok overhead line with the expansion of 500 kV Nevinnomyssk substation and 330 kV Mozdok ORU 500 kV construction" on the basis of a notice on the elimination of violations during the construction of the reconstruction of the capital construction facility from 27042020 02VSS51420 vx 4109662 from 08062020the tasks of this audit are: a control over the measures taken by Vimpelsetstroy LLC to comply with the instruction from 03022020 39RVA18 during the reconstruction of the capital construction facility "500 kV Nevinnomyssk Mozdok overhead line with the expansion of 500 kV Nevinnomyssk substation and 330 kV Mozdok substation 500 kV ORU"The subject of this audit is to note the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 002004431398
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-21, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 21022020 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004451591
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-02, duration: 8
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility "PS 330 kV Prikumsk Reconstruction of a 110 kV ORU 35 Kv Replacement of switches VSH1105 pcs MB 35 kV 4 pcs disconnectors 35 kV 13 pcs disconnectors 110 kV 15 pcs of AVR 1 pc of DSU 1 pc of TN 110 kV 9 pcs of TN 35 kV 6 pcs of OPN 110 kV 2 pcs of RVS" on the basis of paragraphs pp13823 of the inspection program from 18032020 case number 5503, the objectives of this inspection are: prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, committed by FGC UES PJSC and design documentation for the reconstruction of the capital construction facility "PS 330 kV Prikumsk Reconstruction of a 110 kV ORU 35 kV ORU Replacement of switches VSH1105 pcs MB 35 kV 4 pcs disconnectors 35 kV 13 pcs disconnectors 110 kV 15 pcs AVR 1 pc DSU 1 pc TN 110 kV 9 pcs TN 35 kV 6 pcs OPN 110 kV 2 pcs RVS"The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 002004451656
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-06-30, duration: 7
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban planning, including technical regulations and design documentation during the reconstruction of the capital construction facility "Construction of 330 kV overhead line ArtemDerbent Adjustment" reconstruction of 330 kV Derbent substation Stage 1 on the basis of a notice of completion of construction of the reconstruction of the capital construction facility from 05062020 M522105 vx 4109591 from 05062020, the tasks of this audit are as follows: prevention, detection and suppression of violations of the legislation on urban planning activities committed by FGC UES PJSC, including technical regulations and design documentation during the reconstruction of the capital construction facility "Construction of 330 kV overhead line ArtemDerbent Correction" reconstruction of 330 kV Derbent substation 1 This subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 002004431441
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-07-14, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to control the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 02052019 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004374648
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-05-06, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 05022019 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004464171
Unscheduled inspection
Start date: 2020-04-07, end date: 2020-04-10, duration: 4
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the audit is carried out in order to control the fulfillment by a legal entity of the individual entrepreneur of regulation 4673023581PR dated 27122019, the term of which has expired. The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development of mandatory norms and rules, prevention, identification and suppression of violations of legislation on urban development, including project documentationthe subject of this audit is to comply with the instructions of state control bodies
# 002004373267
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-03-27, duration: 0
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to monitor the fulfillment by a legal entity of the individual entrepreneur of regulation 4673023581PR dated 27122019, the term of which has expired. The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development of mandatory norms and rules, prevention, identification and suppression of violations of legislation on urban development, including project documentationthe subject of this audit is the fulfillment of the regulations of state bodies Control supervision
# 002004387225
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-26, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to verify compliance by FGC UES PJSC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility "PS 330 kV Chiryurt 330 kV installation of an ice melting rectifier device VUPG with an ice melting power transformer" Stage 2 based on paragraphs 17 1015 1719 of the inspection program dated 31122019 Tasks The purpose of this audit is to prevent, identify and suppress violations of the legislation on urban planning activities committed by FGC UES PJSC, including technical regulations and design documentation during the reconstruction of the capital construction facility "PS 330 kV Chiryurt 330 kV installation of an ice melting rectifier device with an ice melting power transformer" 2 This subject of this audit is to note the necessary compliance with mandatory requirements
# 002004441839
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-06, duration: 9
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the implementation of the measure provided for in paragraph 60 of the previously issued regulation 10146E of 05072013, the term of which expired on 30122019. The task of this audit is to verify the actual fulfillment of the mandatory requirements specified in regulation 10146E of 05072013 within the established time frame
# 002004100760
Unscheduled inspection
Start date: 2020-01-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004224755
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-24, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity, an individual entrepreneur, in the course of carrying out activities, with the mandatory requirements of Federal laws and other regulatory legal acts, carrying out measures to prevent harm to the life and health of citizens in connection with the expiration of the deadline for the execution of the order dated November 26, 2019 4562283249PR in terms of items with a deadline of January 13, 2020
# 002004272380
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001904121467
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-27, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to control the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility in accordance with the inspection program dated 06092019 1 the objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression violations of the legislation on urban development activities, including design documentation, the subject of this audit is compliance with the mandatory requirements of the legislation on urban development activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements are not met the requirements for equipping a capital construction facility with metering devices for used energy resources also apply. The presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904117799
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-19, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of the order of the Northwestern Department of Rostechnadzor dated 18102019 5257262884PR
# 001903940214
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution by a legal entity of a previously issued order dated 16102019 710637vnP02912019 hereinafter referred to as the Order for the execution of which expires The task of this check is to establish the facts of non-fulfillment by the branch of PJSC FGC UES Valdai PMES prescriptionthe subject of this check is the fulfillment by a legal entity of a previously issued order to eliminate identified violations dated 16102019 710637vnP02912019
# 001903942384
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-15, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to control the fulfillment by Khabarovsk PMES of paragraphs 31 9498 104 of the previously issued Rostechnadzor regulation dated May 11, 2017 122rpP2017 The task of this audit is to establish the facts of the fulfillment by Khabarovsk PMES of the above-mentioned points of Rostechnadzor regulation dated May 11, 2017 122RPP2017 The subject of this audit is the fulfillment of the instructions of state control bodies
# 001903995683
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the fulfillment of the points by the Permian PMES 1 3 4 5 6 10 11 12 13 14 15 16 17 18 21 23 24 25 26 27 28 29 30 34 35 38 39 40 41 43 44 45 46 49 50 51 52 53 55 56 57 58 60 61 62 64 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 99 100 101 102 103 104 105 107 108 109 110 112 113 114 115 116 119 120 121 122 123 124 125 126 128 129 130 131 132 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 previously issued prescription dated August 16, 2019 080201OZP
# 001903636921
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-24, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to control the preparation of electric power facilities for operation in complex technological modes in accordance with the order of Rostechnadzor "On monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period 2019 2020" dated 04072019 262 issued in accordance with the instruction of Deputy Chairman of the Government of the Russian Federation DN Kozak dated 18062019 DKP94982 bx 01170778 dated 05072019 tasks of this inspection these are the implementation of control over the measures taken by a legal entity, an individual entrepreneur, to comply with the requirements affecting the readiness of electric power facilities to work during the heating season, the adoption of measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory legal acts
# 001903636896
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-18, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to control the preparation of electric power facilities for operation in complex technological modes in accordance with the order of Rostechnadzor "On monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period 2019 2020" dated 04072019 262 issued in accordance with the instruction of Deputy Chairman of the Government of the Russian Federation DN Kozak dated 18062019 DKP94982 bx 01170778 dated 05072019 tasks of this inspection these are the implementation of control over the measures taken by a legal entity, an individual entrepreneur, to comply with the requirements affecting the readiness of electric power facilities to work during the heating season, the adoption of measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory legal acts
# 001903877795
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903512438
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-25, duration: —
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the implementation of paragraphs 1219 of the order of the North Caucasus Department of the Federal Service for Environmental Technological and Nuclear Supervision dated 02082019 7615P, the deadline for which expires 25092019
# 001903858073
Unscheduled inspection
Start date: 2019-10-22, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903803710
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-16, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the elimination of identified violations of the mandatory requirements specified in the regulation dated 22042019 148720419024VP, the deadline for which expired 22092019
# 001905221223
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-17, duration: 8
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to monitor the implementation of paragraphs 161 64116 of regulation 343718364 of 05082019 issued by Alexander V. Sheludyakov, Deputy Head of the Department of State Energy Supervision in the Orenburg Region of the West Ural Department of Rostechnadzor, the deadlines for which expire The tasks of this audit are to assess the compliance of the activities or actions inaction carried out by the audited person with the requirements established by Federal laws and other regulatory legal acts in the field of electrical safety The purpose of this inspection is to comply with the requirements of the state control and supervision bodies
# 001903734718
Unscheduled inspection
Start date: 2019-10-08, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903859819
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-18, duration: —
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification after the expiration of the deadline for the execution of a previously issued instruction on the elimination of identified violations of mandatory requirements
# 001903374466
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in accordance with the inspection program
# 001903474967
Unscheduled inspection
Start date: 2019-09-11, end date: 2019-09-13, duration: —
Authority: Zabaikalskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of paragraphs 12345678910111213141516171819 of the regulation dated 19072019 13609122019 on the elimination of identified violations of mandatory requirements of the Labor Code the deadline for the fulfillment of the listed paragraphs of the regulation expired 30082019
# 001903732815
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-04, duration: —
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution by a legal entity of the previously issued order of the Volga Region Department of Rostechnadzor dated August 30, 2019 PR125219P14 The purpose of this audit is to monitor compliance with energy safety requirements. The purpose of this audit is to comply with the instructions of the state control supervision authority
# 001903362564
Unscheduled inspection
Start date: 2019-09-12, end date: —, duration: —
Authority: Departament lesnogo hozyaistva po Privolzhskomu federalnomu okrugu
Purpose of inspection:
# 001903147624
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the execution of PJSC FGC UES of the previously issued order dated 23072019 3089RVA18 on the elimination of violations during the reconstruction of the capital construction facility "Reconstruction of the 330 kV Nalchik Vladikavkaz2 overhead line with the formation of the 330 kV Zaramagskaya GES1 Vladikavkaz2 overhead line and 330 kV Zaramagskaya GES1 Nalchik for the supply of power to the Zaramagskaya GES1"The objectives of this audit are to monitor the measures taken by FGC UES PJSC to comply with the regulation dated 23072019 3089RV18 The subject of this audit is the implementation of the instructions of the state control bodies
# 001903415599
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903072207
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903072233
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903072221
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-06, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to control the fulfillment by the Trans-Baikal SPES of paragraphs 33 to 34 of the previously issued Rostechnadzor regulation dated May 19, 2017 123rpP2017 The task of this inspection is to establish the facts of the fulfillment of the non-fulfillment by the Trans-Baikal SPES of the above-mentioned paragraphs of the Rostechnadzor regulation dated May 19, 2017 123RPP2017 The subject of this inspection is the fulfillment of the instructions of the state control supervision bodies
# 001903148761
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-10-01, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the execution of PJSC FGC UES of the previously issued instruction from 25072019 3269RVPA18 on the elimination of violations during the reconstruction of the capital construction facility "PS 330 kV Prikumsk Reconstruction of the ORU 110 kV ORU 35 kV Replacement of switches VSH1105 pcs MB 35 kV 4 pcs disconnectors 35 kV 13 pcs disconnectors 110 kV 15 pcs AVR 1 pc DSU 1 piece of TN 110 kV 9 pieces of TN 35 kV 6 pieces of OPN 110 kV 2 pieces of RVS"The objectives of this audit are to monitor the measures taken by FGC UES PJSC to comply with the regulation of 25072019 3269RPA18 The subject of this audit is to comply with the instructions of state control bodies
# 001902961077
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-08-21, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with the previously issued regulation dated July 25, 2019 574754 Task prevention detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts Subject to compliance with the regulations of state control bodies supervision of municipal control bodies
# 001902873522
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902993098
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-16, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with mandatory safety requirements in the energy sector
# 001902877390
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902879327
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902919211
Unscheduled inspection
Start date: 2019-07-03, end date: —, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902851301
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-11, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the order of the Chairman of the Government of the Russian Federation Dmitry Medvedev dated 20122012 DMP97811 and the Order of the Federal Service for Environmental Technological and Nuclear Supervision dated 18042017 127 "On Amendments to the Order of the Federal Service for Environmental Technological and Nuclear Supervision dated 13092016 382 "On conducting inspections of the activities of fuel and Energy Complex organizations in the North Caucasus Federal District" Prevention, detection and suppression of violations of Mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety Compliance with mandatory requirements
# 001902918902
Unscheduled inspection
Start date: 2019-06-13, end date: —, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902797161
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-14, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the execution of PJSC FGC UES of the previously issued instruction dated 12122018 6661RVA18194 on the elimination of violations during the reconstruction of the capital construction facility "PS 330 kV Prikumsk Reconstruction of the ORU 110 kV ORU 35 Kv Replacement of switches VSH1105 pcs MB 35 kV 4 pcs disconnectors 35 kV 13 pcs disconnectors 110 kV 15 pcs AVR 1 pc DSU 1 piece of TN 110 kV 9 pieces of TN 35 kV 6 pieces of OPN 110 kV 2 pieces of RVS"The objectives of this audit are to monitor the measures taken by FGC UES PJSC to comply with the regulation of 12122018 6661RVA18194 and compliance with mandatory requirements of regulatory acts in the field of construction during the construction of the reconstruction of the capital construction facility "PS 330 kV Prikumsk Reconstruction of the ORU 110 kV ORU 35 Kv Replacement of switches VSH1105 pcs MB 35 kV 4 pcs disconnectors 35 kV 13 pcs disconnectors 110 kV 15 pcs AVR 1 pc DSU 1 pc TN 110 kV 9 pcs TN 35 kV 6 pcs OPN 110 kV 2 pcs RVS"The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies, the implementation of measures to prevent harm to the life and health of citizens, harm to animals, plants and the environment
# 001902791531
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-07-10, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of a notice of completion of construction dated 06062019 11 vx 6941 dated 06062019, which should be notified to a legal entity at least twenty-four hours before the start of its implementation in any available way that allows you to control the receipt of the notification by the addressee, the task of this check is to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this check is the compliance of the work and the construction materials used in in the process of construction reconstruction of the capital construction facility as well as the results of such work, the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation Federations
# 001902824188
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v Saratovskoi oblasti
Purpose of inspection: ensuring the implementation of state guarantees of labor rights and freedoms of citizens creating favorable working conditions ensuring that the functions actually performed by employees comply with their employment contracts and conditions of remuneration for a comprehensive and complete consideration of a citizen's appeal about violations of his rights and legitimate interests by actions inactions of legal entities and or individual entrepreneurs related to their fulfillment of mandatory requirements in the field of labor protection of rights and interests employees and employers checking the arguments set out in the appeal of vh 647243919OB dated 04062019 supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms ensuring compliance and protection of labor rights and freedoms of citizens compliance with mandatory requirements and or requirements established by municipal legal acts
# 001902664790
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-05-14, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of a previously issued prescription
# 001902620851
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902562875
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration: —
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the Inspection Program approved by the Deputy head of the Nizhnevolzhsky Department of Rostechnadzor Vasiliev EG 22032018g The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, the subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 001902450225
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration: —
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of the fulfillment of the previously issued prescription from 10122018 g M93 in connection with the expiration of the deadline on 31.012019 assessment of the conformity of measurements of units of values of standards of units of values of standard samples of measuring instruments in the field of state regulation to ensure the uniformity of measurements with established requirements compliance with the instructions of state control bodies supervision of municipal control bodies
# 001902450395
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the implementation of measures provided for by a previously issued prescription, the deadline for which expires. The purpose of this audit is to establish the facts of non-compliance by the Khakass PMES with the mandatory requirements specified in the prescription within the prescribed time. The purpose of this audit is to comply with the instructions of the state control supervision body
# 001902415869
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the notice of completion of construction dated 17122018 MH12113 vh 14929 dated 17122018 prevention identification and suppression of violations committed by the developer by the technical customer as well as by the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor violations of the legislation on urban planning activities compliance of the performance of works and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used
# 001902385401
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-23, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulation 4553493287PR dated 12102018
# 001902500452
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-02-04, duration: —
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the execution of PJSC FGC UES of the previously issued order dated 17102018 5039RVPA18 on the elimination of violations during the reconstruction of the capital construction facility "Reconstruction of the 330 kV Nalchik Vladikavkaz2 overhead line with the formation of the 330 kV Zaramagskaya GES1 Vladikavkaz2 overhead line and 330 kV Zaramagskaya GES1 Nalchik overhead line for the output of the Zaramagskaya GES1" located at the address Russian Federation Republic of North Ossetia Alagirsky the area
# 001802144791
Unscheduled inspection
Start date: 2018-11-21, end date: 2018-11-23, duration: —
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued instruction on the elimination of identified violations of the mandatory requirements specified in the instruction P318017146 dated September 07, 2018 upon expiration of the deadline for execution on October 01, 2018 with the delivery of this order under signature, the objectives of this audit are to implement measures to control supervision over the elimination of violations by FGC UES PJSC under the previously issued instruction P318017146 dated September 07 2018 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001802088330
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001802062641
Unscheduled inspection
Start date: 2018-11-08, end date: —, duration: —
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001802084924
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-12-10, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the inspection program approved by 5783 dated January 15, 2016 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this code. The Code
# 001802073911
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-12-10, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and design The subject of this audit is compliance with the mandatory requirements of legislation on urban planning activities compliance of work and construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used availability of a construction permit construction of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 001802054793
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001801997891
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment of Karelian PMES points 14 16 26 27 3137 53 6670 73 75 7779 85 87 88 97 149 151168 173184 previously issued regulations of the Federal Service for Environmental Technological and Nuclear Supervision dated 24052017 161rpP2017
# 001801990734
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the implementation of points at the facilities of the Amur PMES 5 10 18 30 33 34 4270 74 7681 86 89 91 92 95120 142 147 165 166 168 172175 189198 227 234258 261 266 270 271 274 275 277 280321 325 331 333 336 341 342 385 390 392 394 398 399 405 406 418420 441 442 446 449 496 497 511 554557 559561 571 573576 579581 previously issued instructions from 11052017 120rpP2017 the deadline for which the Tasks have expired is to establish the facts of non-fulfillment at the facilities of the Amur PMES of the points of the instruction from 11052017 120rpP2017 The subject is to verify the fulfillment of the instructions of the state control supervision body
# 001801794146
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-04, duration: —
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the implementation of paragraphs 196 of the regulation of the North Caucasus Department of the Federal Service for Environmental Technological and Nuclear Supervision dated 17082018 6115P
# 001801756598
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to monitor the fulfillment by the West Siberian SPES of the previously issued order dated September 14, 2018 17180486POZP348 on the elimination of identified violations, the deadline for which expired in 2009-2018. The objectives of this audit are to assess the completeness of measures to eliminate violations by the West Siberian SPES by its head and other officials of the requirements specified in the previously issued order of the Siberian Department of Rostechnadzor 17180486POZP348 dated September 14, 2018 for the execution of which expires on September 20, 2018, the subject of this audit is the fulfillment of the order of the Siberian Department of Rostechnadzor 17180486POZP348 dated September 14, 2018
# 001801470905
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001801468832
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-26, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the fulfillment of the Yamalonenetsky PMES points 4 16 3335 3740 43 48 53 5558 61 63 64 67 71 72 7685 9193 98105 121 124 129142 144 145 147 148 151153 164 166 167 169 170 176186 195198 201 202 205209 217221 224 226228 230236 239242 244 245 248 249 251320 343411 427432 434485 previously issued prescription dated May 5, 2017 119rpP2017 The task of this audit is to establish the facts of non-compliance by Yamalonenetsky PMES with the above-mentioned paragraphs of the instruction dated May 5, 2017 119rpP2017 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001801468320
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to control the fulfillment of the points by the Eastern PMES 41 42 105 107109 118122 124129 135 141143 153 154 156170 197 241243 246255 261 263 264 previously issued regulation dated May 5, 2017 116rpP2017 The task of this audit is to establish the facts of the fulfillment of the non-fulfillment by the Eastern PMES of the above points of the regulation dated May 5, 2017 116rpP2017 The subject of this audit is the fulfillment of the regulations state control and supervision bodies
# 001801468588
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to control the fulfillment of the points by the Central PMES 68 71 72 81 82 84 87 103 120 127 223227 236 239 241 244247 249251 273 275 276 295 302 314 334337 previously issued regulation dated May 5, 2017 117rpP2017 The task of this audit is to establish the facts of fulfillment of non-fulfillment by the Central PMES of the above-mentioned paragraphs of the regulation dated May 5, 2017 117rpP2017 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001801440565
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-05, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the implementation of the MEA of the East of paragraphs 19 22 27 29 of the previously issued regulation dated June 6, 2017 158rpP2017 The task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the MEA of the East of the above-mentioned paragraphs of the regulation dated June 6, 2017 158rpP2017 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001801434274
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the fulfillment by the Khakass PMES of paragraphs 1315 21 22 24 8592 97103 111114 163 182 of the previously issued instruction dated May 19, 2017 124rpP2017 The task of this inspection is to establish the facts of the fulfillment of the non-fulfillment by the Khakass PMES of the above-mentioned paragraphs of the instruction dated May 19, 2017 124rpP2017 The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies