# 772101412334
Unscheduled inspection
Start date: 2021-12-02, end date: 2021-12-28, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101497997
Unscheduled inspection
Start date: 2021-12-23, end date: —, duration:
Authority:
Purpose of inspection:


# 772101493446
Unscheduled inspection
Start date: 2021-12-20, end date: 2021-12-23, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101493490
Unscheduled inspection
Start date: 2021-12-20, end date: 2021-12-23, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101311514
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772101311474
Unscheduled inspection
Start date: 2021-11-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772101281829
Unscheduled inspection
Start date: 2021-11-04, end date: 2021-11-19, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101214642
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101280960
Unscheduled inspection
Start date: 2021-11-02, end date: 2021-11-15, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101364558
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101358497
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772101275843
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772101246484
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772101207222
Unscheduled inspection
Start date: 2021-10-14, end date: 2021-10-21, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101181531
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101248638
Unscheduled inspection
Start date: 2021-10-20, end date: 2021-11-02, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101202830
Unscheduled inspection
Start date: 2021-10-15, end date: 2021-10-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100591479
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100578789
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772100735050
Unscheduled inspection
Start date: 2021-09-14, end date: 2021-09-20, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100625900
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772100617989
Unscheduled inspection
Start date: 2021-09-07, end date: 2021-09-13, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100554869
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772100564024
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100384361
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100462090
Unscheduled inspection
Start date: 2021-08-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772100399867
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772100331925
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772100338072
Unscheduled inspection
Start date: 2021-07-08, end date: 2021-07-19, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100342072
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100394920
Unscheduled inspection
Start date: 2021-07-28, end date: 2021-08-03, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100333209
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 772100321084
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772100247223
Unscheduled inspection
Start date: 2021-06-14, end date: 2021-06-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100316236
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-12, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100271096
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-30, duration: 17
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100310471
Unscheduled inspection
Start date: 2021-06-25, end date: 2021-07-08, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the verification of the fulfillment of the prescription; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction, reconstruction of capital construction facilities established by the rules of land use and development, documentation according to the layout of the territory, and the mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws


# 772100298431
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-07-05, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100197142
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-18, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100188745
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100242987
Unscheduled inspection
Start date: 2021-05-28, end date: 2021-06-10, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100228796
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772100230946
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-27, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100161775
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-14, duration: 18
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100090502
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-23, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100148167
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-30, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100139852
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-07, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100186817
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-31, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100102515
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-28, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100049454
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100096581
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100096840
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-03-31, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100090014
Unscheduled inspection
Start date: 2021-03-23, end date: 2021-04-05, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100034085
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-02-24, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100026777
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-02-24, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100011055
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-02-20, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100008529
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-01, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772105337590
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772105338910
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772105310428
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772105310432
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772105291310
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772105319257
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772005279405
Unscheduled inspection
Start date: 2020-12-18, end date: 2020-12-31, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772005280465
Unscheduled inspection
Start date: 2020-12-16, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005266535
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772005269388
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005216741
Unscheduled inspection
Start date: 2020-11-05, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005191195
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772005145857
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005186145
Unscheduled inspection
Start date: 2020-10-13, end date: 2020-11-06, duration: 18
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772005180449
Unscheduled inspection
Start date: 2020-10-14, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004474483
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772004479660
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772004478589
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772004475661
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration:
Authority:
Purpose of inspection:


# 772004446872
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772004417916
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration:
Authority:
Purpose of inspection:


# 772004425108
Unscheduled inspection
Start date: 2020-06-04, end date: 2020-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004424029
Unscheduled inspection
Start date: 2020-06-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772004431848
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772004429236
Unscheduled inspection
Start date: 2020-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772004416122
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004414987
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004414440
Unscheduled inspection
Start date: 2020-05-22, end date: 2020-06-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004412904
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-06-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004325741
Unscheduled inspection
Start date: 2020-03-09, end date: —, duration:
Authority:
Purpose of inspection:


# 772004338386
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-03-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004273294
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772004344353
Unscheduled inspection
Start date: 2020-03-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772004351997
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-04-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor Compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including the requirements of energy efficiency efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used


# 772004265555
Unscheduled inspection
Start date: 2020-02-06, end date: 2020-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004249470
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772004237260
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772004257455
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 772004257447
Unscheduled inspection
Start date: 2020-02-05, end date: 2020-02-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004280770
Unscheduled inspection
Start date: 2020-02-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772004239845
Unscheduled inspection
Start date: 2020-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 772004137436
Unscheduled inspection
Start date: 2020-01-14, end date: —, duration:
Authority:
Purpose of inspection:


# 772004225003
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772004225032
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772004211835
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004160562
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 771904143934
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904047167
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904039068
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 771904016001
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771904056602
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771904099207
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771904090002
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771904000113
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 771904000166
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 771904000137
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-12-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903946026
Unscheduled inspection
Start date: 2019-11-07, end date: 2019-11-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903952653
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 771903979367
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-11-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903889311
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 771903775375
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 771903875625
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 771903875287
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903629019
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 771903821432
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903809520
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903903335
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771903877825
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903505027
Unscheduled inspection
Start date: 2019-09-11, end date: —, duration:
Authority:
Purpose of inspection:


# 771903613556
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 771903629251
Unscheduled inspection
Start date: 2019-09-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903620918
Unscheduled inspection
Start date: 2019-09-18, end date: —, duration:
Authority:
Purpose of inspection:


# 771903613053
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 771903629670
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-09-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 771903608588
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 77190803491100
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803466445
Unscheduled inspection
Start date: 2019-09-03, end date: 2019-09-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803492561
Unscheduled inspection
Start date: 2019-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 771903643613
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903588281
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 77190803478558
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-08-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803467074
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803466453
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803456650
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803456375
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803460372
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803445607
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803466047
Unscheduled inspection
Start date: 2019-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803466046
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803449016
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the implementation of the inspection program prevention detection and suppression of violations of the requirements of the design documentation of the legislation on urban planning activities committed by the audited person compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 77190803456707
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803432252
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803430249
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803437797
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803439564
Unscheduled inspection
Start date: 2019-06-19, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803411071
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803417998
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803417548
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803421835
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-06-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803416492
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803408291
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803392417
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the verification of the fulfillment of the instruction prevention detection and suppression of violations of the requirements of the design documentation of the legislation on urban development activities by the audited person verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 77190803403793
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803390642
Unscheduled inspection
Start date: 2019-04-05, end date: 2019-04-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803331017
Unscheduled inspection
Start date: 2019-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803370049
Unscheduled inspection
Start date: 2019-03-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803364305
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803330911
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803329974
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803338925
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803321864
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803324989
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803314821
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803285100
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-11-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803287155
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803257352
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-12-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803269750
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803277103
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-11-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803278973
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803260791
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803261434
Unscheduled inspection
Start date: 2018-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803246463
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803245168
Unscheduled inspection
Start date: 2018-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803251840
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803244753
Unscheduled inspection
Start date: 2018-10-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803224231
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803224191
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803207366
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771800558600
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: establishment of compliance of the licensee's license applicant with licensing requirements verification of information on the activities of the licensee's license applicant on the availability and condition of equipment tools technical means measuring instruments technical documentation and other objects used by the licensee to carry out the licensed type of activity on compliance of employees of the licensee's license applicant with licensing requirements compliance of information contained in the application and documents of a legal entity or individual entrepreneur on the provision of legal the status of a special permit license for the right to carry out certain types of activities or permit approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities unified state register of legal entities the register of individual entrepreneurs and other federal information resources the condition of premises buildings structures technical means equipment and other facilities that are supposed to be used by the license applicant or licensee in the implementation of the licensed type of activity and the availability of employees necessary for the implementation of the licensed type of activity in order to assess the compliance of such facilities and employees with licensing requirements


# 77180803211536
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803173004
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803184862
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803184857
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803187159
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803167806
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803155166
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803166742
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-07-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the requirements established by the legislation on urban planning activities within the framework of the subject of state construction supervision


# 77180803140420
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803133998
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803121408
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803119680
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803077327
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803110044
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803088086
Unscheduled inspection
Start date: 2018-02-21, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803072124
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803058901
Unscheduled inspection
Start date: 2018-01-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803081946
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803070764
Unscheduled inspection
Start date: 2018-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77170803044345
Unscheduled inspection
Start date: 2017-12-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802994903
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77170803022564
Unscheduled inspection
Start date: 2017-12-25, end date: 2017-12-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170803006711
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170803008454
Unscheduled inspection
Start date: 2017-12-18, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802938601
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802923492
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802896834
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802863248
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-11-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802856630
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802799918
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-11-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802733152
Unscheduled inspection
Start date: 2017-10-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802763676
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802741524
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802704461
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802702645
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-11-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802692949
Unscheduled inspection
Start date: 2017-10-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802504727
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802489330
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802174901
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a construction permit compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802646684
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802590769
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170801965992
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701860967
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170801917444
Unscheduled inspection
Start date: 2017-08-21, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701813913
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-08-14, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu federalnogo gosudarstvennogo nadzora za soblyudeniem trebovanii trudovogo zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava na osnovanii motivirovannogo predstavleniya 101157817ISH ot 14072017 g gosudarstvennogo inspektora truda Karmishina OM


# 77170701714205
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701843911
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-08-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701840692
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701802327
Unscheduled inspection
Start date: 2017-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701812079
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-08-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701722302
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701712407
Unscheduled inspection
Start date: 2017-06-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701689698
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701679529
Unscheduled inspection
Start date: 2017-06-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701757708
Unscheduled inspection
Start date: 2017-06-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701702981
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-07-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701725670
Unscheduled inspection
Start date: 2017-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701673267
Unscheduled inspection
Start date: 2017-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701636987
Unscheduled inspection
Start date: 2017-05-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701689622
Unscheduled inspection
Start date: 2017-05-17, end date: 2017-05-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701614640
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701637106
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701567015
Unscheduled inspection
Start date: 2017-04-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701516095
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701477498
Unscheduled inspection
Start date: 2017-04-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701443382
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-04-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701450454
Unscheduled inspection
Start date: 2017-03-09, end date: 2017-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701486509
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701421051
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701379512
Unscheduled inspection
Start date: 2017-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701356314
Unscheduled inspection
Start date: 2017-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701344822
Unscheduled inspection
Start date: 2017-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701314886
Unscheduled inspection
Start date: 2017-01-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701305936
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701333821
Unscheduled inspection
Start date: 2017-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701235378
Unscheduled inspection
Start date: 2016-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701227727
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701221821
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701138342
Unscheduled inspection
Start date: 2016-11-18, end date: 2016-11-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701087440
Unscheduled inspection
Start date: 2016-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701087442
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701121757
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700997859
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation


# 77160700925095
Unscheduled inspection
Start date: 2016-10-06, end date: 2016-10-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 966616 ot 19092016 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 77160700907155
Unscheduled inspection
Start date: 2016-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700865135
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700883941
Unscheduled inspection
Start date: 2016-09-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700688585
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700358281
Unscheduled inspection
Start date: 2016-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700357132
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-09-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160601761845
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160601689706
Unscheduled inspection
Start date: 2016-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601456641
Unscheduled inspection
Start date: 2016-01-26, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.