# 282101516639
Unscheduled inspection
Start date: 2021-12-29, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282101378487
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Ispolnenie programmy proverok 27.08.2020, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov., proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282101356641
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Ispolnenie programmy provedeniya proverok utverzhdennoi ot 06.03.2020, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov, proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 282101134512
Unscheduled inspection
Start date: 2021-10-20, end date: 2021-11-02, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy proverok 12.04.2018, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov;, proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov;


# 282100512073
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-09-24, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: - ispolneniya programmy provedeniya proverok ot 12.01.2021, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov, proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov., proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov, proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282100675707
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282100510252
Unscheduled inspection
Start date: 2021-09-09, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282100427351
Unscheduled inspection
Start date: 2021-08-13, end date: 2021-08-26, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Ispolnenie programmy provedeniya proverok. utverzhdennoi 12.04.2018, Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.;, Predmetom nastoyaschei proverki yavlyaetsya: proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov, proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282100331376
Unscheduled inspection
Start date: 2021-07-08, end date: 2021-07-21, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolneniya programmy provedeniya proverok utverzhdennoi 27.08.2020, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov, proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 282100338033
Unscheduled inspection
Start date: 2021-07-09, end date: 2021-07-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya №1 ot 25.01.2021, ispolnenie programmy proverok, utverzhdennoi 11.08.2020, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov., proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282100309274
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Ispolnenie programmy provedeniya proverok ot 06.03.2020, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov, proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov., proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov, proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282100253534
Unscheduled inspection
Start date: 2021-06-02, end date: 2021-06-16, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: - ispolneniya programmy provedeniya proverok, utverzhdennoi ot dekabrya 2008, preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov, proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 282100104702
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-12, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: cel: - ispolneniya programmy provedeniya proverok, utverzhdennoi ot 15.08.2019 Zadachami nastoyaschei proverki yavlyayutsya: -preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. Predmetom nastoyaschei proverki yavlyaetsya: -proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282100098203
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-09, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu: - ispolneniya programmy provedeniya proverok ot 06.03.2020. Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. Predmetom nastoyaschei proverki yavlyaetsya: proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov.


# 282100018631
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282105302534
Unscheduled inspection
Start date: 2021-01-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282105328834
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 282005256624
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282005178318
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ispolneniya programmy provedeniya proverok Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov8 Srok provedeniya proverki ne bolee 20 rabochih dnei


# 282005178241
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-04, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ispolneniya programmy provedeniya proverok Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov8 Srok provedeniya proverki ne bolee 20 rabochih dnei


# 282005218849
Unscheduled inspection
Start date: 2020-11-10, end date: 2020-12-07, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka zakonchennogo stroitelstvom obekta i resheniya voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov ispolnenie programmy provedeniya proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 282004451251
Unscheduled inspection
Start date: 2020-07-10, end date: 2020-08-06, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose execution of the verification program Task prevention identification and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. the construction of the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 282004442164
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-17, duration: 14
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy provedeniya proverok Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 282004436715
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-20, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used Task prevention detection and suppression of violations of compliance committed by the developer technical customer the person carrying out construction performed during the construction of the capital construction facility as well as the results of such violations the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used. The purpose is to check the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used


# 282004436712
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-07-20, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used Task prevention detection and suppression of violations of compliance committed by the developer technical customer the person carrying out construction performed during the construction of the capital construction facility as well as the results of such violations the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used. The purpose is to check the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used


# 282004394100
Unscheduled inspection
Start date: 2020-04-10, end date: —, duration:
Authority:
Purpose of inspection:


# 282004378848
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy provedeniya proverok utverzhdennoi 11022019Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281904154105
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used


# 281904154049
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used


# 281904161906
Unscheduled inspection
Start date: 2019-12-30, end date: 2020-02-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy provedeniya proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281904087991
Unscheduled inspection
Start date: 2019-12-12, end date: 2020-01-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used


# 281903940369
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-12-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of checking the completed construction of the facility and resolving the issue of issuing an opinion on the compliance of the constructed work facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, the task is to prevent the identification and suppression of violations of compliance by the developer, the technical customer, the person carrying out construction, performed during the construction of the capital construction facility, as well as the results of such work the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used, the verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used


# 281903822859
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 281903643487
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Celyu ispolneniya programmy provedeniya proverok utverzhdennoi 17112016 proverka ispolneniya predpisaniya 142 ot 24112016Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281902955003
Unscheduled inspection
Start date: 2019-08-13, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 281902867436
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-08-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Celispolnenie programmy provedeniya proverokZadachapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmetproverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281902764378
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-07-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Cel proverki zakonchennogo stroitelstvom obekta i resheniya voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii izvescheniya ob okonchanii stroitelstva obektaZadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmet proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281902764343
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-07-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Cel proverki zakonchennogo stroitelstvom obekta i resheniya voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii izvescheniya ob okonchanii stroitelstva obektaZadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovPredmet proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281902763482
Unscheduled inspection
Start date: 2019-06-05, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 281902706445
Unscheduled inspection
Start date: 2019-05-07, end date: 2019-06-05, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Amurskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya 6911 ot 16102018 goda ob ustranenii narushenii trebovanii pozharnoi bezopasnosti o provedenii meropriyatii po obespecheniyu pozharnoi bezopasnosti na obektah zaschity i po predotvrascheniyu ugrozy vozniknoveniya pozhara zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie v poryadke ustanovlennom zakonodatelstvom Rossiiskoi Federacii deyatelnosti po provedeniyu proverki soblyudeniya trebovanii pozharnoi bezopasnosti i prinyatie mer po rezultatam etoi proverki Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya


# 281902620869
Unscheduled inspection
Start date: 2019-04-04, end date: 2019-04-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Purpose execution of the inspection program Task prevention detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction, of compliance with the requirements of the design documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used Subject verification of compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work, the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 281902517517
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-03-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy provedeniya proverok utverzhdennoi 11022019 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281902451285
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 281802212643
Unscheduled inspection
Start date: 2018-12-07, end date: 2019-01-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program. The task is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction, of compliance with the requirements of the technical regulations of the project documentation performed during the construction of the capital construction facility, as well as the results of such work, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject is to verify the compliance of the work performed and the applied construction materials during the construction of a capital construction facility, as well as the results of such work, meet the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used.


# 281802162986
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy provedeniya proverok utverzhdennoi 07092017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281801974152
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 281800680363
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 281800680359
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-10-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Cel proverka zakonchennogo stroitelstvom obekta i resheniya voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii izvescheniya ob okonchanii stroitelstva obekta Zadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmet proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281800545248
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration:
Authority:
Purpose of inspection:


# 281800583173
Unscheduled inspection
Start date: 2018-07-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 281800583251
Unscheduled inspection
Start date: 2018-07-27, end date: 2018-08-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The purpose of the execution of the inspection program is to prevent identify and suppress violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used construction materials in the process of construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 281800527877
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 281800572126
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 281800444186
Unscheduled inspection
Start date: 2018-06-09, end date: 2018-07-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Cel ispolneniya programmy provedeniya proverok na osnovanii izvescheniya o nachale stroitelstva obekta Zadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmet proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 281800062275
Unscheduled inspection
Start date: 2018-02-09, end date: 2018-03-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Cel ispolneniya programmy provedeniya proverok Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom licom osuschestvlyayuschim stroitelstvo narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 28170802962178
Unscheduled inspection
Start date: 2017-12-07, end date: 2018-01-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka zakonchennogo stroitelstvom obekta i reshenie voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 28170802926897
Unscheduled inspection
Start date: 2017-12-01, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 28170803008865
Unscheduled inspection
Start date: 2017-12-20, end date: 2018-01-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka zakonchennogo stroitelstvom obekta i reshenie voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 28170802985300
Unscheduled inspection
Start date: 2017-12-15, end date: 2018-01-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: poluchenie izvescheniya o nachale stroitelstva ispolneniya programmy provedeniya proverok


# 28170802985297
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration:
Authority:
Purpose of inspection:


# 28170802713330
Unscheduled inspection
Start date: 2017-10-18, end date: —, duration:
Authority:
Purpose of inspection:


# 28170802639396
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program


# 28170802630720
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverka zakonchennogo stroitelstvom obekta i reshenie voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 28170802596151
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-10-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: ispolnenie programmy provedeniya proverok utverzhdena 30052017


# 28170801910143
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-09-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: proverki zakonchennogo stroitelstvom obekta i resheniya voprosa o vydache zaklyucheniya o sootvetstvii postroennogo obekta rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 28170701825311
Unscheduled inspection
Start date: 2017-07-21, end date: 2017-08-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.