# 772005150486
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-27, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Inspection shall be conducted for the purpose of Paragraph 1 of the Order of the Deputy Prime Minister of the Russian Federation Golikova T And 27122019 g ТГП1211486 the order of the head of the Federal service for labour and employment Ivankov M th from 24012020 3пЗадачами check are the supervision and control over compliance with legislation and other normative legal acts containing norms of labor law the Subject of this review is compliance with mandatory requirements and / or requirements of the municipal legal acts according to the information contained in the notice of initiation of certain types of entrepreneurial activities with the mandatory requirements of conformity of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit a license authorizing negotiation mandatory requirements as well as data about the specified legal entities and individual entrepreneurs contained in the unified state register of individual entrepreneurs and other Federal information resources the provisions of state control of the oversight bodies, municipal control activities for the prevention of harm to life, health of citizens harm to animals, plants, the environment, the cultural heritage monuments of history and culture of the peoples of the Russian Federation Museum objects and Museum collections included in the Museum Fund of the Russian Federation, documents of special historic importance to the scientific and cultural value are part of the national library of the Fund for the prevention of emergency situations of natural and technogenic character in the security of the state in the aftermath of causing such harm


# 001904015366
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to fulfill the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 of the order of the Interregional Technological Department of the Federal Service for Environmental Technological and Nuclear Supervision dated September 10, 2019 3016 the tasks of this inspection are the implementation of control over the measures taken to comply with the individual legal entity by the entrepreneur of mandatory safety requirements in the electric power industry, prevention of detection and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of safety in the electric power industry, taking measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory acts, The subject of this audit is compliance with mandatory requirements


# 001903893471
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by a legal entity of a previously issued prescription The task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDU". The subject of this audit is the execution by JSC "CDU" of the Instruction on the elimination of identified violations


# 001903873742
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-30, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 001903824990
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-15, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of the points of the previously issued instruction on the elimination of identified violations from 30082019 Cb3986r by JSC "CDC"


# 001902854104
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: According to the notification on the elimination of violations during the construction of the reconstruction of the capital construction facility, previously issued an order dated 26042019 540932prplP01592019, the task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDC". The subject of this audit is the execution of JSC "CDC" of the Instruction on the elimination of identified violations


# 001902853866
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: According to the notification on the elimination of violations during the construction of the reconstruction of the capital construction facility, previously issued an order dated 26042019 540930prplP01582019, the task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDU" The subject of this audit is the execution of JSC "CDU" of the Instruction on the elimination of identified violations


# 001902718186
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-24, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by a legal entity of a previously issued instruction from 21022019 540270prvnP00392019 on the elimination of violations the task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDS". The subject of this audit is the execution of JSC "CDS" of the Instruction on the elimination of identified violations


# 001902659107
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution of the previously issued instruction by NPO IT JSC. The task of this check is to establish the facts of the fulfillment of the above-mentioned instruction by NPO IT JSC. The subject of this check is the execution of the instruction by NPO IT JSC to eliminate the identified violations


# 772101526337
Unscheduled inspection
Start date: 2021-12-30, end date: 2021-12-30, duration: 1
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101443691
Unscheduled inspection
Start date: 2021-12-15, end date: 2021-12-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101443692
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-12-29, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101368982
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772101340140
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101340137
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100890090
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772100709865
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-09-24, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100913087
Unscheduled inspection
Start date: 2021-09-29, end date: 2021-10-05, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100564690
Unscheduled inspection
Start date: 2021-09-01, end date: 2021-09-14, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100472004
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100472003
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-08-26, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100436227
Unscheduled inspection
Start date: 2021-08-09, end date: 2021-09-03, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100436226
Unscheduled inspection
Start date: 2021-08-09, end date: 2021-08-20, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100504145
Unscheduled inspection
Start date: 2021-08-23, end date: 2021-09-10, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100504147
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 772100348148
Unscheduled inspection
Start date: 2021-07-13, end date: 2021-07-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100341831
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration:
Authority:
Purpose of inspection:


# 772100334576
Unscheduled inspection
Start date: 2021-07-06, end date: 2021-07-19, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100335563
Unscheduled inspection
Start date: 2021-07-07, end date: 2021-07-13, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100325548
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 772100267766
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-25, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100271616
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 772100237639
Unscheduled inspection
Start date: 2021-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772100237640
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772100307781
Unscheduled inspection
Start date: 2021-06-23, end date: —, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution by a legal entity of a previously issued prescription. The purpose of this check is to eliminate the facts of fulfillment /non-fulfillment of a previously issued prescription. The subject of this audit is the execution of the order to eliminate the identified violations


# 772100307735
Unscheduled inspection
Start date: 2021-06-23, end date: —, duration:
Authority:
Purpose of inspection:


# 772100291059
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100265977
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100302859
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772100212227
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-02, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100213458
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-02, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100222000
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-02, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100213464
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-02, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100222432
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-06-15, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100194425
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-05-31, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100235823
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772100156501
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-18, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100162414
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-27, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the verification of the fulfillment of the prescription; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction, reconstruction of capital construction facilities established by the rules of land use and development, documentation according to the layout of the territory, and the mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws


# 772100156561
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-18, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100120694
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-05-12, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100099913
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-23, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100050039
Unscheduled inspection
Start date: 2021-03-08, end date: 2021-03-29, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 912100049227
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-26, duration:
Authority: Gosudarstvennyi komitet po gosudarstvennoi registracii i kadastru Respubliki Krym
Purpose of inspection: This audit is carried out in order to perform state functions for the implementation of state land supervision on the basis of an administrative survey act containing information on the presence of signs of violations of the requirements of the legislation of the Russian Federation, for which the legislation of the Russian Federation provides for administrative and other liability. The objectives of this audit are to verify compliance with the requirements of land legislation when using a land plot located at the address: Republic of Crimea, Simferopol district, territory of the Mirnovsky Village Council, cadastral number 90:12:090501:2872, 90:12:090501:2863. The subject of verification is compliance with mandatory requirements and (or) requirements established by municipal legal acts (part 3 of Article 71 of the Land Code of the Russian Federation);


# 772100039868
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772100034882
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772100028818
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772105324001
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772005282358
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772005214296
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005214294
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005201517
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-23, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772004516120
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration:
Authority:
Purpose of inspection:


# 772004498021
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration:
Authority:
Purpose of inspection:


# 772004461193
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004459917
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004459916
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-08-14, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 772004421612
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772004419065
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004413743
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004413778
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 742004327607
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772004352047
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772004352093
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772004352023
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-04-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004252774
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772004249286
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004209011
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004205782
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904071061
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904085987
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771904075893
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person, subject to verification and compliance with mandatory requirements of regulatory documents


# 771904123174
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of the notification of the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of Mosgosstroynadzor


# 771903966856
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 771903982416
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-11-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited, to ensure that the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code complies with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work to the requirements of technical regulations of the design documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001904015366
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to fulfill the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 of the order of the Interregional Technological Department of the Federal Service for Environmental Technological and Nuclear Supervision dated September 10, 2019 3016 the tasks of this inspection are the implementation of control over the measures taken to comply with the individual legal entity by the entrepreneur of mandatory safety requirements in the electric power industry, prevention of detection and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of safety in the electric power industry, taking measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory acts, The subject of this audit is compliance with mandatory requirements


# 001903893471
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by a legal entity of a previously issued prescription The task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDU". The subject of this audit is the execution by JSC "CDU" of the Instruction on the elimination of identified violations


# 001903873742
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-30, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 771903877702
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 771903882971
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 771903921194
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903846739
Unscheduled inspection
Start date: 2019-10-10, end date: —, duration:
Authority:
Purpose of inspection:


# 001903824990
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-15, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of the points of the previously issued instruction on the elimination of identified violations from 30082019 Cb3986r by JSC "CDC"


# 771903643169
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-09-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited. The purpose of the audit is to fulfill the requirements of Part 3 of Article 52 of the Urban Planning Code by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance of the work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 771903669233
Unscheduled inspection
Start date: 2019-09-03, end date: 2019-09-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 77190803489327
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 741903204660
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-09-17, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of the points of the previously issued instruction on the elimination of identified violations from 07062019 Sv2245r by JSC "CDC"


# 771903544120
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration:
Authority:
Purpose of inspection:


# 001903375301
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-10-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: compliance with mandatory requirements


# 77190803477092
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803479770
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


# 741903010963
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803454019
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803451312
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803462119
Unscheduled inspection
Start date: 2019-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803449169
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803466327
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 001902854104
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: According to the notification on the elimination of violations during the construction of the reconstruction of the capital construction facility, previously issued an order dated 26042019 540932prplP01592019, the task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDC". The subject of this audit is the execution of JSC "CDC" of the Instruction on the elimination of identified violations


# 001902853866
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: According to the notification on the elimination of violations during the construction of the reconstruction of the capital construction facility, previously issued an order dated 26042019 540930prplP01582019, the task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDU" The subject of this audit is the execution of JSC "CDU" of the Instruction on the elimination of identified violations


# 77190803428125
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741902741232
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741902741257
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 77190803419607
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803419616
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 001902718186
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-24, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by a legal entity of a previously issued instruction from 21022019 540270prvnP00392019 on the elimination of violations the task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDS". The subject of this audit is the execution of JSC "CDS" of the Instruction on the elimination of identified violations


# 77190803370190
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-03-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the implementation of the inspection program on the basis of the approved inspection program dated 18122018 bn


# 001902659107
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution of the previously issued instruction by NPO IT JSC. The task of this check is to establish the facts of the fulfillment of the above-mentioned instruction by NPO IT JSC. The subject of this check is the execution of the instruction by NPO IT JSC to eliminate the identified violations


# 001902542218
Unscheduled inspection
Start date: 2019-02-15, end date: 2019-02-21, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by a legal entity of a previously issued instruction dated 14122018 543645prvnP04642018 on the elimination of violations during the construction of a reconstruction of a capital construction facility The task of this audit is to establish the facts of the fulfillment of the above-mentioned prescription by JSC "CDS" The subject of this audit is the execution by JSC "CDS" of the Instruction on the elimination of identified violations


# 77190803318427
Unscheduled inspection
Start date: 2019-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803217156
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803240964
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803164420
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803148467
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803097396
Unscheduled inspection
Start date: 2018-03-07, end date: 2018-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803086702
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-03-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803072467
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803061593
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802995990
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802844560
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802740133
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701848804
Unscheduled inspection
Start date: 2017-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170801922150
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-08-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170801922152
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-08-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701793158
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701702024
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701742116
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701603056
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701542969
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701484576
Unscheduled inspection
Start date: 2017-03-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701474009
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701357100
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701404860
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-03-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701301350
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701258016
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701151321
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700973374
Unscheduled inspection
Start date: 2016-10-05, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160700072644
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such inspections. works according to the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


Information about inspections