# 002005183963
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005183962
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005183957
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005183950
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005181675
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005181689
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005181685
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005196981
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002004479393
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004479391
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004478321
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004478317
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004414338
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004229491
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004229481
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004307994
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004283474
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 562101460776
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562101161949
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: – this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 08/12/2021;
– the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation).
7. The subject of this audit is compliance with:
1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation;
2) requirements for a construction permit;
3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
4) requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation, other regulatory legal acts;
5) item No. 3 of the inspection program dated 08/12/2021 (installation of ASDTU, ASKUE, ASTUE, security and fire alarm, video surveillance, perimeter security system, communication networks, landscaping, construction of on-site roads, installation of an access road roads, land reclamation).
# 562100335170
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562100335421
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562100266636
Unscheduled inspection
Start date: 2021-06-09, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out in order to: implement regional state construction supervision on the basis of the revised inspection program approved on 11/17/2020.
- the objectives of this inspection are: identification and suppression of violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, legislation on urban development (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52, part 2, 4 of Article 53 of the Urban Planning Code of the Russian Federation).
-the subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used (item No. 3 of the amended inspection program dated 11/17/2020 - the device of artificial culverts; the device of the pavement of the access road to the KSP site; the device for lighting the automobile roads).
# 592100240503
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 592100240534
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 592100240475
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 7, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100240488
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 8, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100240459
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 592100081903
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 5, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081857
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 13, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081928
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 14, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081889
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 15, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081808
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 3, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081796
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 17, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081774
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 16, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100075736
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 4, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100075702
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 1, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081912
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 6, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100081783
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 2, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100075750
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - verification of compliance of the completed works and applied building materials during the construction of the capital construction facility "Arrangement of cluster sites No.2-BV, 3-BV, 4-BV at the Vorontsovsky oil field" Stage 7, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 562100080528
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-04-01, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 02/05/2021.
- the objectives of this inspection are: identification and suppression of violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, legislation on urban development (part Article 51, Part 2, 3, 3.1, 6, Article 52, Part 2, 4, Article 53 of the Urban Planning Code of the Russian Federation).
- the subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used (item No. 1 of the inspection program approved on 02/05/2021 – Clearing the 110 kV overhead line route to the 110 kV New Stream substation. Vertical layout. Installation of foundations for supports).
# 562005207945
Unscheduled inspection
Start date: 2020-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005183964
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005183963
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005183962
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005183957
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005183950
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002005181675
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005181691
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005181689
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005181685
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002005196981
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban planning activities verification of compliance of completed works and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used verification of compliance with the requirements of parts 2 and 3 of Article 52 of the Federal Law the Law of 29122004 190FZ "Urban Planning Code of the Russian Federation"
# 002004479393
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004479391
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004478321
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004478317
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 562004488536
Unscheduled inspection
Start date: 2020-08-18, end date: 2020-08-25, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program approved by 30042020. the objectives of this inspection are to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used legislation on urban development h 2 st 51 h 2 3 31 6 st 52 part 2 4 of Article 53 of the Urban Planning Code of the Russian Federation the subject of this audit is compliance with the mandatory requirements of urban planning legislation verification of compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, taking into account changes made to design documentation in accordance with Articles 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources n 1 2 3 of the inspection program approved by 30042020 earthwork and covering of the site for vehicles artificial culverts earthwork of the access road
# 002004414341
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-15, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004414338
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-15, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 562004412219
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-05-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice from the developer dated 28042020 1 on the start of construction of a capital construction facility. The objectives of this inspection are to identify and suppress violations of the requirements of legislation on urban development h 2 st 51 h 2 3 31 5 6 st 52 h 2 4 st 53 h 2 st 55 of the Urban Planning Code The subject of this audit is compliance with the deadlines for sending a notice by the developer about the start of construction of a capital construction facility compliance with urban planning legislation h 2 st 51 h 2 3 31 5 6 st 52 h 2 4 st 53 h 2 st 55 of the Urban Planning Code of the Russian Federation
# 562004392661
Unscheduled inspection
Start date: 2020-04-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004229491
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004229481
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 002004307994
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: it is carried out on the basis of a reasoned submission dated February 06, 2020 by the Department for supervision of explosive chemically dangerous objects oil and gas production facilities gas distribution and gas consumption in the Orenburg region in order to verify the information contained in the Memo dated February 06, 2020 323925 of the Department for supervision of explosive chemically dangerous objects oil and gas production facilities gas distribution and gas consumption in the Orenburg region of the West Ural Administration of Rostechnadzor on the facts of implementation operation of an object in violation of the requirements of industrial safety of Article 9 116FZ "On Industrial safety of hazardous production facilities" which creates an immediate threat of harm to human life, health, animals, plants, the environment, state security, property of individuals and legal entities, state or municipal property, prevention of emergency situations of a natural and man-made nature, the subject of this audit is the implementation of measures to prevent harm to the life and health of citizens and the occurrence of man-made emergencies
# 002004283474
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of a reasoned submission dated February 06, 2020 by the Department for supervision of explosive chemically hazardous objects objects of oil and gas production, gas distribution and gas consumption in the Orenburg region in order to verify the information set out in the Memo dated February 06, 2020 323925 of the Department for supervision of explosive chemically hazardous objects objects of oil and gas production, gas distribution and gas consumption in the Orenburg Region of the West Ural Administration of Rostechnadzor on the facts of the operation of the facility in violation of the requirements of industrial safety of Article 9 116FZ "On industrial safety of hazardous production facilities" which creates an immediate threat of harm to human life, health, harm to animals, plants, the environment, state security, property of individuals and legal entities, state or municipal property, prevention of emergency situations of natural and man-made character, The subject of this audit is to carry out measures to prevent causing harm to the life and health of citizens and the occurrence of man-made emergencies
# 562004226242
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-02-18, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection: in order to comply with the requirement of the Buzuluk Interdistrict Prosecutor's Office of 15012020 0708lr2020 to conduct an audit within the framework of supervision of the execution of laws on information received by the prosecutor's office when monitoring the Internet from the Instagram social network in accordance with paragraph 3 of Part 2 of st10 of the Federal Law of the Russian Federation dated December 26, 2008 294 FZ On the Protection of the Rights of Legal Entities and Individual Entrepreneurs The objectives of this audit are to carry out supervision and control over the fulfillment of mandatory requirements of the legislation of the Russian Federation in the field of ensuring the sanitary and epidemiological well-being of the population. The subject of this audit is the observance of mandatory requirements
# 001904137511
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-16, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 561902951203
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms identifier of the state function 10001244260
# 561902871798
Unscheduled inspection
Start date: 2019-07-16, end date: 2019-07-22, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms identifier of the state function 10001244260
# 561902827256
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-22, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is carried out on behalf of Rosprirodnadzor dated 19062019 AA02013116216 to verify the arguments set out in the citizen's appeal. The tasks of this audit are to verify compliance by the business entity of NKNP LLC with the requirements of current legislation in the field of environmental management and environmental protection. The subject of this audit is compliance with the requirements of environmental legislation of the Russian Federation, the fulfillment of the conditions for the use of subsoil under licenses ORB 16186 NE Vorontsovskoye field ORB 16187 NE Mogutovskoye field ORB 16188 NE Gremyachevskoye field in terms of putting fields into development on time
# 561902827287
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms identifier of the state function 10001244260
# 561902700531
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-30, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Orenburgskoi oblasti
Purpose of inspection: execution of the order of the Deputy Chairman of the Government of the Russian Federation YU Borisov dated 29.012019 g YUBP4628 Verification of compliance by organizations and citizens with fire safety requirements and taking measures based on the results of the inspection
# 561800265845
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: —
Purpose of inspection: