Found 100 inspections:

# 002105349138
Unscheduled inspection
Start date: 2021-02-20, end date: —, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002105349176
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 002105283792
Unscheduled inspection
Start date: 2021-02-04, end date: —, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002105291691
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-02-25, duration: 14
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility """Reconstruction of oil collection networks and high-pressure pipelines of the Pokachevsky oil field (16th stage)" cipher 07-1642/18C0969. 9 stage of construction. High-pressure water pipeline from T.bp. to K.sq.424 (3t.71-K.424), (3t.70-K.425) (3t.70-K.425)" " on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements on energy saving and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105289595
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of completion notice No. 133 dated December 9, 2020 in order to control the compliance of completed works with mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts.


# 002105292499
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-25, duration: 17
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility ""Arrangement of well bushes No. 2, 18 of the Yuzhno-Vyntoiskoye field" cipher Ph-2291. Well cluster No. 2. 2nd stage of construction: Arrangement of the 2nd position (injection wells 2.1, 2.2, producing wells 1.3, water intake wells 3.1), installation of BG, cable overpass, technological pipelines, electrical installation works" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations, other regulatory legal acts, project documentation, energy saving requirements and to increase energy efficiency during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105282740
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-16, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility """Arrangement of the well cluster No.215 of the Povkhovsky license area" cipher Ph-2513. Stage of construction of the well cluster No. 215: Construction of a 6 kV overhead line line No. 2 to the well cluster No. 215"" on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105244301
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-16, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of a capital construction facility completed on the basis of completion notice No. 116 dated November 12, 2020 in order to control the compliance of completed works with mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts.


# 002105282747
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-16, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility """Arrangement of the well cluster No. 1B of the Yuzhno-Vyntoiskoye field" cipher Ph-2420. Construction stage: Construction of overhead line-6 kV line No. 1 to well cluster No. 1B" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105282701
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002105292512
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-02-15, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility """Arrangement of the bushes of wells No. 14, 33 of the Yuzhno-Vyntoiskoye field" cipher Ph-2255. Well cluster No. 33. 2nd stage of construction. Well construction 3.1, installation of a pressure comb unit (BG), construction of water pipelines to BG, laying of discharge pipelines and construction of a cable overpass" on the basis of a notice of completion in order to control compliance of completed works with mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility construction. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105236817
Unscheduled inspection
Start date: 2021-01-19, end date: —, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002105206123
Unscheduled inspection
Start date: 2021-01-15, end date: —, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002105266004
Unscheduled inspection
Start date: 2021-01-13, end date: 2021-01-26, duration: 10
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of the previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations of the capital construction facility """Arrangement of the bush of wells No. 167B and skvazhin 62R, 67R, bush of wells No. 138 and well 66R of the Povkhovsky field" The code is Ph-2385. Stage of construction of well cluster No. 167B: Construction of the oil and gas collecting pipeline T.bp.167B - T.bp.167B ". The objectives of this audit are: verification of the elimination by a legal entity of the identified violation. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies.


# 002105206116
Unscheduled inspection
Start date: 2021-01-13, end date: 2021-02-09, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks and high-pressure water pipelines of the Vatyegan field (2018)" code 08-875/16C0935. 7 construction stage - High-pressure water pipeline T.bp.541-bush 541 (section T.bp.541-t.bp.541/1)" on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105298535
Unscheduled inspection
Start date: 2021-01-14, end date: 2021-02-10, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice No. 134 dated December 9, 2020. In order to control the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. 7. The subject of this audit is the compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements, established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105298534
Unscheduled inspection
Start date: 2021-01-14, end date: 2021-02-10, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice No. 132 dated December 9, 2020 in order to control the compliance of the completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. 7. The subject of this audit is the compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements, established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105204580
Unscheduled inspection
Start date: 2021-01-14, end date: 2021-02-10, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility ""Reconstruction and construction of oil and gas collecting pipelines of the Yuzhno-Vyntoyskoye field" code 08-1701/18C0664. 1 stage of construction - Oil and gas collecting pipeline T.bp.1/1-T.bp.1 (section ZKL No. 233-ZKL No.272" on the basis of a notice of completion in order to control of compliance of the completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105290236
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-01-25, duration: 11
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations of the capital construction facility """Oil separation unit at the DNS, compressor station Imilorsky+Zapadno-Imilorskoye field, gas pipeline from the DNS Imilorsky+Zapadno-Imilorskoye field to DNC-7 Tevlinsko-Ruskinsky field"cipher K-2266. 1st stage of construction: Construction of the DNS Imilor separation system; Construction of the DNS Imilor flare system; Construction of the DNS Imilor 0.4 kV power supply system; Construction of the RVS-5000 according to GP pos. 6; Construction of the fire extinguishing system DNS Imilor; Construction of an operational liquid metering unit according to GP No. 15; Construction of an equipment unit, an automated control system operator system; Construction of an operator gas metering unit according to GP pos. 19". The objectives of this audit are: verification of the elimination by a legal entity of the identified violation. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies.


# 002105257743
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002105257728
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-01-27, duration: 13
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility """Arrangement of the well bush No.215 of the Povkhovsky license area" cipher Ph-2513. Stage of construction of the well cluster No. 215: Construction of the oil and gas collecting pipeline bush 215 - T.bp.61" on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002105257714
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-01-27, duration: 13
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility ""Reconstruction, construction of sections of oil collection networks and high–pressure water pipelines of the Vatyegan field" cipher 25/15. 51 construction stage - High-pressure water pipeline T.bp. 160 - kust 160 (section T. bp. 160 - t. bp. 160/1)" on the basis of a notice of completion from the purpose of monitoring the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts. The subject of this review is: compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of this Code.


# 002005270767
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005201213
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 002005201205
Unscheduled inspection
Start date: 2020-12-14, end date: 2021-01-18, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the well cluster 96 with the corridor of communications of the Kogalym oil field cipher 2168 6 stage of construction Construction of an oil and gas collecting pipeline from the bush 96 on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005201196
Unscheduled inspection
Start date: 2020-12-14, end date: 2021-01-18, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the well cluster 96 with the corridor of communications of the Kogalym oil field cipher 2168 4 stage of construction Construction of a high-pressure water pipeline on the bush 96 on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005270230
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-30, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Commercial gas treatment plant of the Yuzhnomessoyakhskoye gas condensate field stage 2 cipher 0372UGNTUP00000" on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility with the objectives of this inspection The purpose of this check is to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this check is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for the construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005282811
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005257764
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-21, duration: 18
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of well bushes 5 6 7 8 Imilorskoye+Zapadnoimilorskoye field cipher K2183 Linear facilities Stage Construction of the oil and gas collecting pipeline tvr61 tvr1 on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005257756
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-21, duration: 18
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of prospecting wells 87P 89P 543R 532R Imilorskoye+ Zapadnoimilorskoye field cipher K2271 Prospecting well 89P Stage 3 Construction of VL6kV for prospecting well 89P on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005230146
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005230138
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks and high-pressure pipelines of the Pokachevsky oil field turn 16 cipher 07164218C0969 17 construction stage High-pressure water pipeline route at BKNS3 k65 High-pressure water pipeline BKNS33t24 from 3t17 to K22 " on the basis of a notice of completion in order to control compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation in accordance with including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005230155
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005230136
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks and high-pressure pipelines of the Pokachevsky oil field turn 16 cipher 07164218C0969 18 construction stage High-pressure water pipeline route at BKNS3 k65 High-pressure water pipeline BKNS33t24 from 3t20 to K321 " on the basis of a notice of completion in order to control compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005230151
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005254431
Unscheduled inspection
Start date: 2020-12-02, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005250025
Unscheduled inspection
Start date: 2020-12-02, end date: 2020-12-22, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of bush sites 905 908 909 910 of the Nivagalskoye field cipher P1942 Bush site 910 tvrk909k910 Highway Engineering preparation of the bush site 910 6 kV overhead line 1 tvrk909k910 6 kV overhead line 2 tvrk909k910 Oil collection pipeline k910tvrk909 14 well installation of KTPN AGZU BMA drainage tank gas dispersion candle floodlight masts on the basis of a notice of completion, in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005250015
Unscheduled inspection
Start date: 2020-12-02, end date: 2020-12-22, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of cluster sites 905 908 909 910 of the Nivagalskoye field cipher P1942 Cluster site 910 High-pressure conduit tvrk9051k910 tvrk9051k909 high-pressure conduit tvrk9051k910 tvrk909k910 construction of BG installation of a cable overpass of technological pipelines on the basis of a notice of completion in order to control compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation including including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005265979
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-18, duration: 10
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks and high-pressure pipelines of the Pokachevsky oil field turn 16 cipher 07164218C0969 15 stage of construction High-pressure water pipeline k320 tvr3t202k320" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005257818
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005257804
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity by an individual entrepreneur of the previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations for the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of a section of the OPE of oil deposits Technological facilities stage 952 " The objectives of this audit are to verify the elimination by a legal entity of the identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005257876
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity of an individual entrepreneur previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations for the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of a section of the OPE of oil deposits Technological facilities 1231 stage " The objectives of this audit are to verify the elimination by a legal entity of the identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005257796
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity by an individual entrepreneur of the previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations for the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of a section of the OPE of oil deposits Technological facilities 951 stage " The objectives of this audit are to verify the elimination by a legal entity of the identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005257859
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity by an individual entrepreneur of the previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations for the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 842 stage " The objectives of this audit are to verify the elimination by a legal entity of the identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005257832
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity by an individual entrepreneur of the previously issued by the state construction supervision authority of the points of the instruction on the elimination of identified violations of mandatory requirements on the basis of a notice on the elimination of violations for the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of a section of the OPE of oil deposits Technological facilities 83 stage " The objectives of this audit are to verify the elimination by a legal entity of the identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005253151
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005254647
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by a legal entity by an individual entrepreneur of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements during the construction of a capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 1021 stage The task of verification is to verify the elimination by a legal entity of identified violations specified in the order The subject of verification is compliance with the instructions of state control bodies supervision bodies municipal control


# 002005254646
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by a legal entity by an individual entrepreneur of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements during the construction of a capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 683 stage The task of verification is to verify the elimination by a legal entity of identified violations specified in the order The subject of verification is compliance with the instructions of state control bodies supervision bodies municipal control


# 002005254643
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration:
Authority:
Purpose of inspection:


# 002005254640
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by a legal entity by an individual entrepreneur of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements during the construction of a capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 681 stage The task of verification is to verify the elimination by a legal entity of identified violations specified in the order The subject of verification is compliance with the instructions of state control bodies supervision bodies municipal control


# 002005254637
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by a legal entity by an individual entrepreneur of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements during the construction of a capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 52 stage The task of verification is to verify the elimination by a legal entity of identified violations specified in the order The subject of verification is compliance with the instructions of state control bodies supervision bodies municipal control


# 002005254636
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by a legal entity by an individual entrepreneur of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements during the construction of a capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 51 stage The task of verification is to verify the elimination by a legal entity of identified violations specified in the order The subject of verification is compliance with the instructions of state control bodies supervision bodies municipal control


# 002005254635
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by a legal entity by an individual entrepreneur of an order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements during the construction of a capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 126 stage The task of verification is to verify the elimination by a legal entity of identified violations specified in the order The subject of verification is compliance with the instructions of state control bodies supervision bodies municipal control


# 002005267525
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-18, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "The arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 83 stage on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility with the objectives of this inspections are aimed at preventing, detecting and suppressing violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. building permits to comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005267414
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-18, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of the OPE site of oil deposits Technological facilities 51 stage on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility with the objectives of this inspections are aimed at preventing, detecting and suppressing violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. building permits to comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005267589
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005267506
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-18, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of the OPE site of oil deposits Technological facilities 953 stage on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility with the objectives of this inspections are aimed at preventing, identifying and suppressing violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources. building permits to comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005267394
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-18, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of the OPE site of oil deposits Technological facilities 126 stage on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility with the objectives of this inspections are aimed at preventing, identifying and suppressing violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used. building permits to comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005267480
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005267329
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-18, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "The arrangement of the Pyakyakhinsky field with the allocation of an OPE site of oil deposits Technological facilities 682 stage on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility with the objectives of this inspections are aimed at preventing, identifying and suppressing violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. building permits to comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005267377
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-18, duration: 7
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of the Pyakyakhinsky field with the allocation of the OPE site of oil deposits Technological facilities 1021 stage on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility with the objectives of this inspections are aimed at preventing, detecting and suppressing violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. building permits to comply with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005267462
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005267440
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005204591
Unscheduled inspection
Start date: 2020-11-19, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005219233
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-10, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of the bush 47 52 76 of the Flow field cipher L2427 Bush of wells 76 stage 2 Construction of VL6 kV 1 on the bush 76 Construction of VL6 kV 2 on the bush 76 Installation of KTPN 8 searchlight mast 10 communication overpass electrical work " on the basis of a notice of completion in order to control the compliance of completed The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the performance of work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such works meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005219216
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-10, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted to check the completed capital construction object "construction of wells Bush 550 Nivagalsky field cipher 02142417С1673 3rd phase Neftegazovoy tubing Bush 550твр550 construction of the existing exploration wells poses 15 networking engineering ensure agmu poses 6 the capacity of the drainage volume of 125 m3 POS 71 Area under electrical поз10 Complete transformer substation POS POS 101 102 control Station 1 PCs POS 1021 Transformer power supply submersible pumps 1 piece POS 1031 Wardrobe KRM 2 PCs POS 1081 1082 unit hardware POS 102 Floodlight mast 2 PCs POS 121 124 Lightning poses 111 Fire pond POS 15" on the basis of notice of completion with the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object Objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the Subject of this review is to match the performance of works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of this Code


# 002005219166
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-10, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of the bush 47 52 76 of the Flow field cipher L2427 Bush of wells 76 stage 3 Construction of the oil and gas collecting pipeline k76 tvrk15R Construction of the high-pressure water pipeline tvrk76 k76 Arrangement of the injection well 21 installation of a communication overpass of technological pipelines electrical installation works" on the basis of a notice of completion in order to control the compliance of the completed works mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and applied building materials during the construction reconstruction of a capital construction facility as well as the results of such inspections the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005219200
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-08, duration: 17
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of pipelines of the Uryevsky oil field Reconstruction program 2018 cipher 0283115C4486 9th stage of construction Oil and gas collecting pipeline k133 tvr k133 tvr Z4647 Inv LANG_40026" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005219182
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005219143
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-10, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of the bush 47 52 76 of the Flow field cipher L2427 Pipelines Loopings stage 1 Oil and gas collecting pipeline tvrk15R tvrk76" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement when The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005219273
Unscheduled inspection
Start date: 2020-11-17, end date: 2020-12-14, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of additional wells of the Severopokachevsky field 9th stage cipher P2550 Construction stage High-pressure water pipeline tvrk15 k15A" on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements of equipment of the capital construction facility with metering devices used energy resources availability of a construction permit compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005208586
Unscheduled inspection
Start date: 2020-11-18, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005241185
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-16, duration: 18
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of pipelines of the Lasegan field Reconstruction program 20162017 cipher 0235414X2379 Construction stage Oil and gas collecting pipeline tvrk 252 tvrk 253 InvLANG_40048 on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement when The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005241173
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-16, duration: 18
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of the bush 47 52 76 of the Flow field cipher L2427 Pipelines Loopings stage 2 Oil and gas collecting pipeline tvrk49 tvrk5 on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during construction The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005238589
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-17, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of the bush 551567 of the Nivagalskoye field cipher L2412 Bush of wells 567 Stage Construction of a highway to the bush of wells 567 Construction of a bridge to PK8+5307 Construction of a production site of the bush of wells 567 on the basis of a notice of completion in order to control compliance of completed works with mandatory requirements of technical regulations of other The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005238575
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-17, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of bushes 1 2 3 of the Zapadnochumpassky license area cipher 0505UGNTUP00000 Bush of wells 2 stage 1 construction of an access road to the bush of wells 2 engineering preparation of the bush site 2 on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the design The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including requirements of energy efficiency and requirements of equipment of the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005238557
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005238681
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-17, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of the pipeline of the Lokosovsky oil field Reconstruction program 2019 code 0337UGNTUP00000 12 stage of construction of the NSB network k226 tvrk205 Z24 k208 tvrk206226 tvrk205207 InvLANG_40042A nsb network jumper on the AGZU 1 nsb network jumper on the AGZU 2" on the basis of a notice of completion in order to control compliance of completed works with mandatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and the construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005238545
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 002005238644
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 002005238639
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-17, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of bushes 1 2 3 of the Zapadnochumpassky license area cipher 0505UGNTUP00000 Bush of wells 1 10 stage arrangement of the 7th well installation of technological equipment laying of pipelines and construction of an electrical overpass of automation equipment to well 7 construction of an oil collection pipeline from the AGZU bush of wells 1 to KP 178" on the basis of a notification on completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and the construction materials used during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005238634
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-17, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of wells of the bush 551 567 of the Nivagalskoye field cipher L2412 Bush of wells 567 stage 2 Construction of VL6 kV 1 to the bush of wells 567 Construction of VL6 kV 2 to the bush of wells 567" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations and other normative The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005238628
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005229088
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-18, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the inspection is to check the completed construction of the capital construction facility Reconstruction and construction of sections of oil collection pipelines and high-pressure water pipelines of the Povkhovsky field Code 0825714C0947 Stage High-pressure water pipeline tvr107kust 107 section tvr107tvr1071 CDNG5 in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility Verification tasks warning identification and suppression of violations of mandatory requirements of regulatory documents and legislative acts to verify the compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of this Code


# 002005196531
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-18, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks and high-pressure pipelines of the Pokachevsky oil field turn 16 cipher 07164218C0969 stage 6 of the construction of the Oil and gas pipeline k345tvr15" on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement when The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005229621
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-12-21, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of a notice of completion dated October 20, 2020 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts


# 002005201220
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-27, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of bushes of wells 87 93 with the corridor of communications of the Kogalym oil field cipher 2141 Bushes of wells 87 93 of the Kogalym oil field Bush of wells 87 stage 12 Construction of a high-pressure water pipeline bush 86 bush 87 transfer to injection of skv3 skv5 skv8 skv11 construction of a block of combs BG cable overpass of high-pressure water pipelines electrical installation works on the basis of a notice of completion in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and the applied construction materials in the process of construction reconstruction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005201226
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-27, duration: 19
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of bushes of wells 87 93 with the corridor of communications of the Kogalym oil field cipher 2141 Bushes of wells 87 93 of the Kogalym oil field Bush of wells 87 13 stage Construction of a high-pressure water pipeline bush 87 bush 88 transfer to injection of skv15 skv17 skv20 construction of a block of combs BG2 cable overpass of high-pressure water pipelines electrical work recultivation of the adjacent territory on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005189999
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005229622
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-22, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of a capital construction facility completed on the basis of the completion notice 114 dated October 20, 2020 in order to control the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts


# 002005186271
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005206150
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks of high-pressure pipelines of the Povkhovsky field cipher 713 Stage 3 oil collection pipeline kust 45tpm2 tvr45tvr45B" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of the facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements of equipment of the capital construction facility with metering devices the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005206139
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed construction of the capital construction facility "Reconstruction of oil collection networks of high-pressure pipelines of the Povkhovsky field cipher 713 Stage 4 oil collection pipeline kust 45tpm2 tvr45Btpm2 jumper 1 jumper 2" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005206101
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-25, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to verify the fulfillment by a legal entity, an individual entrepreneur, of the previously issued by the state construction supervision authority of the points of the instruction on the elimination of violations of mandatory requirements on the basis of a notice on the elimination of violations for the capital construction facility "Reconstruction of oil collection networks of high-pressure water pipelines of the Vatyeganskoye field cipher 1587 36 construction stage High-pressure water pipeline tvr1tvr8 section tvr6tvr8 section tvr1tvr6" The objectives of this audit are verification of the elimination by a legal entity of an identified violation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002005196516
Unscheduled inspection
Start date: 2020-11-05, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005204615
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005219310
Unscheduled inspection
Start date: 2020-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 002005219366
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Construction of the Martaller oil field 1st stage cipher P2410 1st stage of construction Construction of the highway to the cluster site 90 Engineering preparation of the cluster site 90" on the basis of a notice of completion in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with energy saving requirements The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code


# 002005219252
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Arrangement of additional wells of the Pokachevsky oil field 10th stage cipher P2552 Construction stage Construction of a 6 kV overhead line 2 to the well cluster 19A" on the basis of a notice of completion in order to control the compliance of completed works with mandatory requirements of technical regulations other regulatory legal acts of project documentation requirements for energy conservation and to increase energy efficiency during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements the equipment of the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 3_1 of Article 52 of this Code


# 002005249948
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.