Found 22 inspections:

# 001902478497
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701788130
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-07-03, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Prevention detection and suppression of violations of the legislation on urban planning, including technical regulations and project documentation, energy conservation and energy efficiency requirements, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer


# 772100261693
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 13
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in accordance with the notice of completion of construction, reconstruction of the capital construction facility in order to monitor the compliance of the completed works with the mandatory requirements of the project documentation, requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility. ; The purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of the contract. with the developer or technical customer, violations of the legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement; The subject of this audit is: compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Articles 48 of this Urban Planning Code of the project documentation (subject to the amendments made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model, including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and requirements for equipping a capital construction facility with metering devices for used energy resources;


# 502100219863
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration:
Authority:
Purpose of inspection:


# 002105342977
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-03-03, duration: 19
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction based on a contract with a developer or technical customer, violations of legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement; The subject of this review is:compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002005208177
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation


# 502004412153
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-06-16, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: protection of labor rights of employees


# 771904096254
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: This inspection is carried out in order to control the previously issued instruction on the elimination of violations of fire safety requirements on the implementation of measures to ensure fire safety at protection facilities and to prevent the threat of fire from 17012019 1611 The objectives of this inspection are to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and adopted in accordance with the legislation of the Russian Federation. in accordance with them and other regulatory legal acts of the Russian Federation and the adoption of measures based on the results of the audit, the purpose of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 001904170405
Unscheduled inspection
Start date: 2019-12-31, end date: 2020-01-29, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 771902428364
Unscheduled inspection
Start date: 2019-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 001902478497
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of completed works with the mandatory requirements of the design documentation, requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction and reconstruction of a capital construction facility. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer, including The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the equipment requirements of the capital construction facility metering devices for used energy resources


# 771801354897
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 771800955334
Unscheduled inspection
Start date: 2018-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 771800651279
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-09-12, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The audit is conducted at the request of Deputy of the State Duma V.F. Rashkin 7721718PV. The objectives of the audit are supervision and control over compliance with legislation and other regulatory legal acts containing labor law norms. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts. compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements. compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements. in the application and documents of a legal entity or individual entrepreneur for granting the legal status of a special permit license issuance of a permit compliance with mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified state register of individual entrepreneurs and other federal information resources, compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, measures to prevent harm to life and health damage to animals, plants, the environment, cultural heritage sites, historical and cultural monuments of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents of special historical significance, scientific and cultural significance, which are part of the national library fund for the prevention of natural and man-made emergencies, for ensuring state security, and for eliminating the consequences of such harm


# 771800502070
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration:
Authority:
Purpose of inspection:


# 50170701898219
Unscheduled inspection
Start date: 2017-08-16, end date: 2017-09-12, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Moskovskoi oblasti
Purpose of inspection: purpose verification of the legal entity's compliance with the previously issued regulation 44001 of 071116 paragraphs 4 5 7 tasks prevention detection and suppression of violations of the requirements of legislation in the field of sanitary and epidemiological welfare of the population compliance with the regulations of state control and supervision bodies


# 00170701788130
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-07-03, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Prevention detection and suppression of violations of the legislation on urban planning, including technical regulations and project documentation, energy conservation and energy efficiency requirements, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer


# 50170701374853
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-28, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Moskovskoi oblasti
Purpose of inspection: monitoring of the execution of regulations on the elimination of violations of fire safety requirements


# 50160701023043
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-11-14, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Moskovskoi oblasti
Purpose of inspection: verification of the facts stated in the appeal 225401j


# 50160601707055
Unscheduled inspection
Start date: 2016-07-04, end date: 2016-07-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Moskovskoi oblasti
Purpose of inspection: Verification of compliance with fire safety requirements


# 50160601525153
Unscheduled inspection
Start date: 2016-03-03, end date: 2016-03-18, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Moskovskoi oblasti
Purpose of inspection: compliance with mandatory fire safety requirements


# 50160601479631
Unscheduled inspection
Start date: 2016-02-01, end date: 2016-01-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Moskovskoi oblasti
Purpose of inspection: compliance with mandatory fire safety requirements


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.