Found 40 inspections:

# 002005141845
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903891809
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 26/122018 086the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor.7 The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision terrestrial laser rangefinder of the Moon for the purpose of precision ephemeris-time support of the GLONASS system" as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. construction meeting the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903042700
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 26/122018 086the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor.7 The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision terrestrial laser rangefinder of the Moon for the purpose of precision ephemeris-time support of the GLONASS system" as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. construction meeting the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902771383
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Mezhregionalnoe upravlenie 170 Federalnogo medikobiologicheskogo agentstva
Purpose of inspection: To establish that this inspection is being carried out for the purpose of unscheduled federal State sanitary and Epidemiological supervision to monitor the implementation of the instruction from 27042018 g 4P of the Interregional Directorate 170 of the FMBA of Russia based on the results of a planned on-site inspection in connection with the expiration of the deadline for the elimination of identified violations


# 001902597599
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001801892589
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-04, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 23072018 558G3327B242


# 001801891741
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-04, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 23072018 558G3327B242


# 001801888964
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility


# 001800588961
Unscheduled inspection
Start date: 2018-09-14, end date: —, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800524643
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center AOLC to create a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris of the GLONASS system" located at Savvushka Zmeinogorsky Based on the inspection program approved by the Acting Deputy Head of the Siberian Department of Rostechnadzor, the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation.


# 001800491316
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 28032018 g 206G3327B242


# 001800491281
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 28032018 g 206G3327B242


# 001800209249
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility


# 001800169966
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-03-16, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center AOLC to create a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris time support of the GLONASS system"


# 001800089001
Unscheduled inspection
Start date: 2018-02-13, end date: —, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802791238
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities


# 422100217497
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Acting Deputy Head of the Siberian Department of Rostechnadzor Nemchenko N.K. dated 01/13/2021 № 086. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor). 7. The subject of this audit is: compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical and Laser Center (AOLC) to create a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris-time support of the GLONASS system", as well as the results of such work with the requirements approved in accordance with Parts 15, Articles 15_2 and 15_3 of the Urban Planning Code of the Russian Federation of the project documentation (subject to the amendments made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply), including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements of parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation Federations


# 002005141845
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-23, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 05022020 086the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, of project documentation7 The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision terrestrial laser rangefinder of the Moon for the purpose of precision ephemeris time support of the GLONASS system" as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. construction meeting the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903891809
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 26/122018 086the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor.7 The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision terrestrial laser rangefinder of the Moon for the purpose of precision ephemeris-time support of the GLONASS system" as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. construction meeting the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903042700
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 26/122018 086the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor.7 The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision terrestrial laser rangefinder of the Moon for the purpose of precision ephemeris-time support of the GLONASS system" as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. construction meeting the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902771383
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Mezhregionalnoe upravlenie 170 Federalnogo medikobiologicheskogo agentstva
Purpose of inspection: To establish that this inspection is being carried out for the purpose of unscheduled federal State sanitary and Epidemiological supervision to monitor the implementation of the instruction from 27042018 g 4P of the Interregional Directorate 170 of the FMBA of Russia based on the results of a planned on-site inspection in connection with the expiration of the deadline for the elimination of identified violations


# 001902597599
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 26/122018 086. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, of project documentation 7. The subject of this inspection is the compliance of the work and the construction materials used and the results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision terrestrial laser rangefinder of the Moon for the purpose of precision ephemeris-time support of the GLONASS system" as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used building permits compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902472470
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Ivanov SA dated 26/122018 086. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, of project documentation 7. The subject of this inspection is the compliance of the work and applied building materials and results during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center of the AOLC for the creation of a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris time support of the GLONASS system"


# 001802302536
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-24, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation of 19092018 g 701G3320B241


# 001802298927
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-24, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation of 19092018 g 701G3320B241


# 001801892589
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-04, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 23072018 558G3327B242


# 001801891741
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-04, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 23072018 558G3327B242


# 001801773349
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center AOLC to create a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris of the GLONASS system" located at Savvushka Zmeinogorsky Based on the inspection program approved by the Acting Deputy Head of the Siberian Department of Rostechnadzor, the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor


# 001801888964
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility


# 001800588961
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-19, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 22052018 351G3327B241


# 001800524643
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center AOLC to create a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris of the GLONASS system" located at Savvushka Zmeinogorsky Based on the inspection program approved by the Acting Deputy Head of the Siberian Department of Rostechnadzor, the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation.


# 001800491316
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 28032018 g 206G3327B242


# 001800491281
Unscheduled inspection
Start date: 2018-07-18, end date: 2018-07-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 28032018 g 206G3327B242


# 001800311447
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 19022018 g 107G3327B241


# 001800209249
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility


# 001800169966
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-03-16, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Reconstruction and technical re-equipment of the Altai Optical Laser Center AOLC to create a high-precision ground-based laser rangefinder of the Moon for the purpose of precision ephemeris time support of the GLONASS system"


# 001800089001
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-19, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 22112017 695G3327B241


# 00170802791158
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities


# 00170802791238
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities


# 22160601650536
Unscheduled inspection
Start date: 2016-06-01, end date: 2016-06-29, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Altaiskomu krayu i Respublike Altai
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the Altai Optical Laser Center, a branch of JSC NPC SPP, of the regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 03092015 ZZTA2741 ZTA2742 3TA2743THE objectives of this inspection are to take measures provided for by current legislation to prevent, identify and suppress violations of the requirements of the legislation of the Russian Federation on environmental protection and environmental management


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.