# 001802078903
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 20062018 g 453G3320K95
# 001802078798
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 23072018 g 544G3320K96
# 772101371614
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100289287
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100329468
Unscheduled inspection
Start date: 2021-07-06, end date: 2021-07-09, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100289900
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-17, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100306287
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100220583
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-19, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100246450
Unscheduled inspection
Start date: 2021-05-31, end date: 2021-06-11, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100129939
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-16, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100117648
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-13, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100177215
Unscheduled inspection
Start date: 2021-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100057465
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-12, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100042861
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-04-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu: zaschity prav i interesov rabotnika v svyazi s rassmotreniem obraschenii ot 20.02.2021 № 77/7-5330-21-OB , № 77/7-5299-21-OB po voprosu narusheniya trudovogo zakonodatelstva
Zadachami proverki yavlyayutsya: nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov, soderzhaschih normy trudovogo prava.
Predmetom nastoyaschei proverki yavlyaetsya: - soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami; - sootvetstvie svedenii, soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti, obyazatelnym trebovaniyam; - sootvetstvie svedenii. soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa, specialnogo razresheniya (licenzii), vydachi razresheniya (soglasovaniya) obyazatelnym trebovaniyam, a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah, soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah; - vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya; - provedenie meropriyatii; - po predotvrascheniyu prichineniya vreda zhizni, zdorovyu grazhdan, vreda zhivotnym, rasteniyam, okruzhayuschei srede, obektam kulturnogo naslediya (pamyatnikam istorii i kultury) narodov Rossiiskoi Federacii, muzeinym predmetam i muzeinym kollekciyam, vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii, dokumentam, imeyuschim osoboe istoricheskoe znachenie, nauchnoe, kulturnoe znachenie, vhodyaschim v sostav nacionalnogo bibliotechnogo fonda; - po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; - po obespecheniyu bezopasnosti gosudarstva; - po likvidacii posledstvii prichineniya takogo vreda.
# 772100000142
Unscheduled inspection
Start date: 2021-02-09, end date: 2021-02-10, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772105335307
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105308741
Unscheduled inspection
Start date: 2021-01-14, end date: 2021-02-10, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu: zashity prav i interesov rabotnikov (v svyazi s rassmotreniem obraschenii № 77/7-435 YU-20-OB ot 14.12.2020, № 77/7-43520-20-OB ot 14.12,2020') po voprosam narusheniya trudovogo zakonodatelstva v chasti oplaty truda, ohrany truda. Zadachami proverki yavlyayutsya: nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov, soderzhaschih normy trudovogo prava.
Predmetom nastoyaschei proverki yavlyaetsya: - soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami; - sootvetstvie svedenii, soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti, obyazatelnym trebovaniyam; - sootvetstvie svedenii. soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa, specialnogo razresheniya (licenzii), vydachi razresheniya (soglasovaniya) obyazatelnym trebovaniyam, a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah, soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah; - vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya; - provedenie meropriyatii; - po predotvrascheniyu prichineniya vreda zhizni, zdorovyu grazhdan, vreda zhivotnym, rasteniyam, okruzhayuschei srede, obektam kulturnogo naslediya (pamyatnikam istorii i kultury) narodov Rossiiskoi Federacii, muzeinym predmetam i muzeinym kollekciyam, vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii, dokumentam, imeyuschim osoboe istoricheskoe znachenie, nauchnoe, kulturnoe znachenie, vhodyaschim v sostav nacionalnogo bibliotechnogo fonda; - po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; - po obespecheniyu bezopasnosti gosudarstva; - po likvidacii posledstvii prichineniya takogo vreda.
# 772005178383
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:
# 772004473679
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004384541
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-03-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzoromso srokom ustraneniya 17032020
# 772004346590
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004341905
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004368361
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004313860
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004313675
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the subject of verification is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such works with the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 772004253520
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004269666
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004277194
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-02-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzoromso srokom ispolneniya 31012020
# 772004277118
Unscheduled inspection
Start date: 2020-02-12, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004304793
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-03-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004180767
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004237287
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004252023
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzoromso srokom ispolneniya 17012020 g
# 772004244810
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004206792
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004206877
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903921602
Unscheduled inspection
Start date: 2019-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903942752
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904015827
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903961376
Unscheduled inspection
Start date: 2019-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904040383
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904031644
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903947399
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903942326
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 771903947360
Unscheduled inspection
Start date: 2019-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903979325
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903895459
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903904450
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903893961
Unscheduled inspection
Start date: 2019-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903877829
Unscheduled inspection
Start date: 2019-10-25, end date: 2019-11-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the establishment of violations of the requirements for the availability of a construction permit and the requirements specified in the construction permit. Tasks of the audit are to prevent the identification and suppression of violations of the requirements for the availability of a construction permit and the requirements specified in the construction permit. The verification of compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction reconstruction of capital construction facilities established by the rules land use and development documentation on the layout of the territory and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws
# 771903804937
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903625197
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-09-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor
# 77190803492469
Unscheduled inspection
Start date: 2019-09-04, end date: 2019-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803490767
Unscheduled inspection
Start date: 2019-09-04, end date: 2019-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903692420
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-09-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 77190803475466
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803475435
Unscheduled inspection
Start date: 2019-08-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803475424
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803484266
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803481095
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803481094
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803486851
Unscheduled inspection
Start date: 2019-08-27, end date: 2019-08-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803475463
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803472591
Unscheduled inspection
Start date: 2019-08-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803486852
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803455265
Unscheduled inspection
Start date: 2019-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803461996
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803450653
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803450634
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803435927
Unscheduled inspection
Start date: 2019-06-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803433582
Unscheduled inspection
Start date: 2019-06-11, end date: 2019-06-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803438957
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803443079
Unscheduled inspection
Start date: 2019-06-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803441435
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-06-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803443949
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803444360
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803418525
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803416753
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803417996
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803416634
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803421788
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803420218
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803423199
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803422506
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803394341
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803384081
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803405384
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803384080
Unscheduled inspection
Start date: 2019-04-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803405383
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803389400
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803392613
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803370667
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-03-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803375685
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803377060
Unscheduled inspection
Start date: 2019-03-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803377318
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803362301
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803384082
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803337172
Unscheduled inspection
Start date: 2019-02-13, end date: 2019-02-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803337173
Unscheduled inspection
Start date: 2019-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803337275
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803326873
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities
# 77190803346058
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803324511
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803324820
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803324926
Unscheduled inspection
Start date: 2019-01-31, end date: 2019-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803315962
Unscheduled inspection
Start date: 2019-01-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803316090
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803319969
Unscheduled inspection
Start date: 2019-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803321442
Unscheduled inspection
Start date: 2019-01-29, end date: 2019-01-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803315334
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803308422
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803308419
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803290643
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803289776
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803310693
Unscheduled inspection
Start date: 2018-12-28, end date: 2018-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803310326
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803310325
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803296972
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803296840
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803302358
Unscheduled inspection
Start date: 2018-12-19, end date: 2018-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 7118P ot 21092018 na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentacii proverka ustraneniya vyyavlennyh narushenii ukazannyh v predpisanii 7118P ot 21092018 Predmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 7118P ot 21092018 so srokom ispolneniya 11122018
# 77180803300421
Unscheduled inspection
Start date: 2018-12-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803277264
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803265702
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803267805
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001802078903
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 20062018 g 453G3320K95
# 001802078798
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 23072018 g 544G3320K96
# 001802078708
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 20062018 g 457G3320K97
# 77180803273682
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803274453
Unscheduled inspection
Start date: 2018-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803240227
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803242297
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803251625
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803252197
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-10-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803252460
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803255472
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803255470
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803257800
Unscheduled inspection
Start date: 2018-10-19, end date: 2018-10-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803229798
Unscheduled inspection
Start date: 2018-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803232319
Unscheduled inspection
Start date: 2018-09-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803224102
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803223863
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803223844
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803226434
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803217332
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-09-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803224717
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-09-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803233028
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-10-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803175956
Unscheduled inspection
Start date: 2018-08-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803215711
Unscheduled inspection
Start date: 2018-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803202286
Unscheduled inspection
Start date: 2018-08-10, end date: 2018-08-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803194272
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803213959
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803194489
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803208870
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803207126
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803190690
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803193863
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803181663
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803181662
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803181123
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803182178
Unscheduled inspection
Start date: 2018-07-17, end date: 2018-07-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803190339
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803174010
Unscheduled inspection
Start date: 2018-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803175419
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803185071
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803185072
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803185079
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803164361
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803163476
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803160224
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803176125
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803169625
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-06-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803153747
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803171338
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-06-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803159879
Unscheduled inspection
Start date: 2018-06-09, end date: 2018-06-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803168652
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803139004
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803138549
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803138777
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803139551
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803148601
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-05-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803132569
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803147336
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-05-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803124025
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803126659
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-05-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803103578
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of certificates of approval issued by a self-regulating organization for work that affects the safety of capital construction facilities. compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. cash construction permits
# 77180803125546
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803121252
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803115005
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803114665
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803118347
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803128661
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803127942
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803130836
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803129680
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803119206
Unscheduled inspection
Start date: 2018-04-05, end date: 2018-04-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803103230
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803097485
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803099482
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803100453
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803113500
Unscheduled inspection
Start date: 2018-03-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803103585
Unscheduled inspection
Start date: 2018-03-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803106029
Unscheduled inspection
Start date: 2018-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803108028
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-03-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803095062
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-04-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803087747
Unscheduled inspection
Start date: 2018-02-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771800087750
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-03-20, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's appeal dated 23112017 No. 680 on issues of remuneration, registration and termination of an employment contract
# 77180803087003
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803085434
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-03-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803089519
Unscheduled inspection
Start date: 2018-02-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803072872
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803072871
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803079582
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803076372
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803070457
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803087354
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-02-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803081840
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803070449
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803060005
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803057372
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803066906
Unscheduled inspection
Start date: 2018-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803068202
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-01-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803081775
Unscheduled inspection
Start date: 2018-01-25, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803070468
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802988981
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802989003
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802930224
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803005821
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803008070
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802995472
Unscheduled inspection
Start date: 2017-12-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802791031
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802921078
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-11-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance by a legal entity and an individual entrepreneur with mandatory requirements in the process of carrying out activities in the field of industrial safety as well as compliance with mandatory requirements of buildings, premises, structures, technical devices, equipment, materials and ongoing technological processes
# 77170802814695
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802882852
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170802884884
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance by a legal entity and an individual entrepreneur with mandatory requirements in the process of carrying out activities in the field of industrial safety as well as compliance with mandatory requirements of buildings, premises, structures, technical devices, equipment, materials and ongoing technological processes
# 77170802874361
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802881116
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802863232
Unscheduled inspection
Start date: 2017-11-16, end date: 2017-11-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802856615
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802646073
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802656598
Unscheduled inspection
Start date: 2017-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802704663
Unscheduled inspection
Start date: 2017-10-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802696070
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802769863
Unscheduled inspection
Start date: 2017-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802750271
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802750239
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-10-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802651319
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802699239
Unscheduled inspection
Start date: 2017-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802711216
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802519042
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802280885
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802604480
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802577020
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802041448
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802573504
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802016982
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701881391
Unscheduled inspection
Start date: 2017-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801944819
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701842913
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801930560
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701889811
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701863055
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-08-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701851508
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701814077
Unscheduled inspection
Start date: 2017-07-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701828306
Unscheduled inspection
Start date: 2017-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701850804
Unscheduled inspection
Start date: 2017-07-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701769831
Unscheduled inspection
Start date: 2017-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701754843
Unscheduled inspection
Start date: 2017-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701793356
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701769064
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-08-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701679051
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701653470
Unscheduled inspection
Start date: 2017-06-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701658051
Unscheduled inspection
Start date: 2017-06-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701730834
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701756798
Unscheduled inspection
Start date: 2017-06-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701603348
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701589214
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701538367
Unscheduled inspection
Start date: 2017-04-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701522931
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701541247
Unscheduled inspection
Start date: 2017-04-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701450943
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-03-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701403885
Unscheduled inspection
Start date: 2017-02-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701415405
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-02-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701298472
Unscheduled inspection
Start date: 2017-01-13, end date: 2017-01-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701313981
Unscheduled inspection
Start date: 2017-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701317659
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-02-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701317347
Unscheduled inspection
Start date: 2017-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701264574
Unscheduled inspection
Start date: 2016-12-27, end date: 2016-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701262231
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701067721
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701102003
Unscheduled inspection
Start date: 2016-11-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160701086509
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700988201
Unscheduled inspection
Start date: 2016-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700046657
Unscheduled inspection
Start date: 2016-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601785863
Unscheduled inspection
Start date: 2016-08-30, end date: 2016-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverokZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya nalichie razresheniya na stroitelstvo nalichie svidetelstva o dopuske vydannye samoreguliruemoi organizaciei k rabotam kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstva sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam
# 77160700043448
Unscheduled inspection
Start date: 2016-08-19, end date: 2016-08-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii 553516 ot 17062016 vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentacii
# 77160601737741
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-07-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 767516 ot 15072016
# 77160601718438
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program, prevention of detection and suppression of violations of technical regulations and project documentation committed by the audited person, compliance of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for used energy resources