Found 42 inspections:

# 112101502056
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the previously issued regulation No. 25-07-43 dated 08/06/2021


# 112100253947
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 9
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "II stage of construction – "Kharyaginsky field development project. Turn 3. Package 4. Modernization of the central collection point. Allocation of construction stages", as well as the results of such work to the requirements of technical regulations, other regulations and project documentation. Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "II stage of construction – "Kharyaginsky field development project. Turn 3. Package 4. Modernization of the central collection point. Allocation of construction stages" by metering devices for energy resources used. Compliance with mandatory requirements of legislation on urban development; Compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of the work Performed, with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility "II stage of construction – "Kharyaginsky field development Project. Turn 3. Package 4. Modernization of the central collection point. Allocation of construction stages by" metering devices for energy resources used; Compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 112100254228
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 9
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Stage 2 of construction - "Kharyaginsky field development project. Queue 4C. Arrangement of the EP-2 well bush. Expansion", as well as the results of such work to the requirements of technical regulations, other regulations and project documentation. Inspection of the completed capital construction facility "Stage 2 of construction - "Kharyaginsky field development project. Queue 4C. Arrangement of the EP-2 well bush. Expansion" on the basis of the notice of completion of the capital construction facility dated 05/20/2021 No. IS-2666 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Stage 2 of construction - "Kharyaginsky field development project. Queue 4C. Arrangement of the EP-2 well bush. Expansion" by metering devices for energy resources used. Compliance with mandatory requirements of legislation on urban development; Compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of the work performed, with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility "Stage 2 of construction - "Kharyaginsky Field Development Project. Queue 4C. Arrangement of the EP-2 well bush. Expansion of" metering devices for energy resources used; Compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 112100254113
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 9
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "1st stage of construction - "Kharyaginsky field development project. Queue 4C. Arrangement of the EP-2 well bush. Expansion", as well as the results of such work to the requirements of technical regulations, other regulations and project documentation. Inspection of the completed capital construction facility "1st stage of construction - "Kharyaginsky field development project. Queue 4C. Arrangement of the EP-2 well bush. Expansion" on the basis of the notice of completion of the capital construction facility dated 05/20/2021 No. IS-2668 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "1st stage of construction - "Kharyaginsky field development project. Queue 4C. Arrangement of the EP-2 well bush. Expansion" by metering devices for energy resources used. Compliance with mandatory requirements of legislation on urban development; Compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of the work performed, with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility "1st stage of construction - "Kharyaginsky Field Development Project. Queue 4C. Arrangement of the EP-2 well bush. Expansion of" metering devices for energy resources used; Compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 112100253844
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 9
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of the completed works and the applied building materials at the site of the cap. construction "Stage I of construction – "The project for the development of the Kharyaginsky field. Turn 3. Package 4. Modernization of the central collection point. Allocation of construction stages", as well as the results of such work to the requirements of technical regulations, other regulations and project documentation. Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the facility. construction "Stage I of construction – "The project for the development of the Kharyaginsky field. Turn 3. Package 4. Modernization of the central collection point. Allocation of construction stages" by metering devices for energy resources used. Compliance with mandatory requirements of legislation on urban development; Compliance of the performed works and the applied building materials in the process of construction of the object cap. construction, as well as the results of the work performed, to the requirements of the design documentation, including the requirements of energy efficiency (with the exception of capital construction projects, to which the requirements of energy efficiency do not apply) and the requirements of the equipment of the facility. construction "Stage I of construction – "The project for the development of the Kharyaginsky field. Turn 3. Package 4. Modernization of the central collection point. Allocation of construction stages by" metering devices for energy resources used; Compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 112100002153
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 112100002074
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority:
Purpose of inspection:


# 112100001986
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority:
Purpose of inspection:


# 112100001871
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority:
Purpose of inspection:


# 112100001699
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 292005246699
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-04, duration: 8
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of verification of compliance of the performed works and the construction materials used for the object of capital construction "stage 6 the construction of the "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment", as well as the results of such work to the requirements of technical regulations of the regulations and design documentation, Verification of the completed capital construction object "the 6 phase of a "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" on the basis of the notification of completion of construction of capital construction object from 23112020 МБ7064Задачи verification of compliance with the legal entity of requirements of the legislation on town-planning of the environmental legislation of sanitary norms and rules of fire safety rules of industrial safety requirements including the requirements of energy efficiency and equipment of a capital construction object "the 6 phase of a "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" metering devices used energy resourceframe compliance of work performed and used building materials in the construction process of the facility and the results of work performed to the requirements of project documentation including requirements for energy efficiency, with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object "the 6 phase of a "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment" metering devices of energy resources used in the implementation of the requirements of parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 112004493615
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-04, duration: 20
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the order of Deputy Chairman of the Government of the Russian Federation Borisov Yuri Ivanovich from 30062020 YUB P97031


# 292004304596
Unscheduled inspection
Start date: 2020-02-26, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 291904085481
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-20, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of the performed works and the construction materials used for the object of capital construction "stage 4 of the construction of the "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment", as well as the results of such work to the requirements of technical regulations of the regulations and design documentation, Verification of the completed capital construction object "stage 4 of the construction of the "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" on the basis of the notification of completion of the reconstruction, overhaul of capital construction object from 14112019 МБ7163 Verification of compliance with the legal entity of requirements of the legislation on town-planning of the environmental legislation of sanitary norms and rules of fire safety rules of industrial safety requirements including the requirements of energy efficiency and equipment of a capital construction object "stage 4 of the construction of the "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" metering devices of energy resources of Conformity and used building materials in the construction process of the facility and the results of work performed to the requirements of project documentation including requirements for energy efficiency, with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object "stage 4 of the construction of the "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment" metering devices of energy resources used in the implementation of the requirements of parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 291904085539
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-20, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance of the performed works and the construction materials used for the object of capital construction "stage 5 construction "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment", as well as the results of such work to the requirements of technical regulations of the regulations and design documentation, Verification of the completed capital construction object "stage 5 construction "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" on the basis of the notification of completion of the reconstruction, overhaul of capital construction object from 14112019 МБ7164 Verification of compliance with the legal entity of requirements of the legislation on town-planning of the environmental legislation of sanitary norms and rules of fire safety rules of industrial safety requirements including the requirements of energy efficiency and equipment of a capital construction object "stage 5 construction "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" metering devices of energy resources of Conformity and used building materials in the construction process of the facility and the results of work performed to the requirements of project documentation including requirements for energy efficiency, with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object "stage 5 construction "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment" metering devices of energy resources used in the implementation of the requirements of parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 291904085409
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-20, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the compliance of completed works and applied building materials at the capital construction facility "Stage 2 Construction Project of the Kharyaginsky field Reconstruction of the Kust 108 GNS oil pipeline as well as the results of such work with the requirements of technical regulations other normative acts and project documentation Verification of the completed reconstruction of the capital construction facility "Stage 2 construction Project of the Kharyaginsky field Reconstruction of the Kust 108 GNS oil pipeline" on the basis of the notice of completion of construction reconstruction of capital repairs of the capital construction facility dated 14112019 MB7165 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Stage 2 Construction Project of the Kharyaginsky field Reconstruction of the Kust oil pipeline 108 STS" metering devices for energy resources used for compliance of work performed and construction materials used in the process of reconstruction of a capital construction facility, as well as the results of work performed, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements of a capital construction facility "2nd stage of construction Kharyaginsky development project Reconstruction of the Kust 108 GNS oil pipeline with metering devices for energy resources used, compliance with the requirements of Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 291902993772
Unscheduled inspection
Start date: 2019-08-27, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 291902993741
Unscheduled inspection
Start date: 2019-08-27, end date: 2019-08-29, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of the performed works and the construction materials used for the object of capital construction "3rd phase "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment", as well as the results of such work to the requirements of technical regulations of the regulations and design documentation, Verification of the completed capital construction object "3rd phase "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" on the basis of the notification of completion of the reconstruction, overhaul of capital construction object from 08082019 ОА4928Проверка fulfil a legal person requirements of the legislation on town-planning activities of the environmental legislation of sanitary norms and rules of fire safety rules of industrial safety requirements including the requirements of energy efficiency and equipment of a capital construction object "3rd phase "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Correction" metering devices of energy resources, the Compliance of the performed works and used building materials in the construction process of the facility and the results of work performed to the requirements of project documentation including requirements for energy efficiency, with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object "3rd phase "project of the construction of the Kharyaga field Turn 4A and 4B, the construction of the extension of the Bush wells EP1 Adjustment" metering devices of energy resources used in the implementation of the requirements of parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 291902993701
Unscheduled inspection
Start date: 2019-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 291902993093
Unscheduled inspection
Start date: 2019-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 291902599094
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-29, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of completed works and applied building materials at the capital construction facility "Stage 8 construction of the well cluster EP2" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation verification of the completed construction of the capital construction facility "Stage 8 construction of the well cluster EP2" verification of compliance by a legal entity with the requirements of legislation on urban planning and environmental protection legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Stage 8 construction arrangement of the well cluster EP2" with metering devices for energy resources used compliance of the work performed and construction materials used during the reconstruction of the capital construction facility as well as the results of the work performed with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility "Stage 8 construction arrangement of the well cluster EP2" with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 291902598921
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 291902582390
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 291902520060
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 291902488047
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Kharyaginsky field development project Well cluster arrangement 108 Reconstruction Organization of the product accounting system" as well as the results of such work with the requirements of technical regulations other regulations and project documentation Verification of the completed reconstruction of the capital construction facility "Kharyaginsky field development project Well cluster arrangement 108 Reconstruction Organization of the accounting system products" based on the notice of completion of construction reconstruction and overhaul of the capital construction facility dated 29012019 OA458 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Kharyaginsky field development project Arrangement of a well cluster 108 Reconstruction Organization product accounting systems" with metering devices for energy resources used, Compliance of work performed and construction materials used in the process of reconstruction of the capital construction facility, as well as the results of work performed, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements of the capital construction facility "Kharyaginsky field development project well cluster 108 Reconstruction of the organization of the product accounting system" with metering devices for used energy resources Compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 291902444705
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-01, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of the performed works and the construction materials used at the facility ipstr "IV stage of the construction project, "the Project of the construction of the Kharyaga field Turn 3 Package 4 Modernization of the Central collection point Allocation stages of construction," as well as the results of such work to the requirements of technical regulations of the regulations and design documentation, Verification of completed project cap page "IV stage of the construction project, "the Project of the construction of the Kharyaga field Turn 3 Package 4 Modernization of the Central collection point Allocation stages of construction" in accordance with the notice of completion of construction, reconstruction, capital repair of the object of cap Stra from 14012019 ОА80 Verification of compliance with the legal entity of requirements of the legislation on town-planning of the environmental legislation of sanitary norms and rules of fire safety rules of industrial safety requirements including the requirements of energy efficiency and equipment of the property cap page "IV stage of the construction project, "the Project of the construction of the Kharyaga field Turn 3 Package 4 Modernization of the Central collection point Allocation stages of construction" metering devices of energy resources of Conformity and used building materials in the construction process of the cap page and the results of work performed to the requirements of project documentation including requirements for energy efficiency with the exception of objects capstar which energy performance requirements shall not apply and the requirements of the equipment of the property cap page "IV stage of the construction project, "the Project of the construction of the Kharyaga field Turn 3 Package 4 Upgrading the Central gathering the phased construction of the" metering devices of energy resources used in the Implementation of the requirements of parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 291802090731
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of the completed works and applied building materials at the capital construction facility "The first stage of construction according to the project Arrangement of the Kharyaginsky field Turn 4A and 4B Arrangement of the expansion of the well cluster EP1 Correction" as well as the results of such work with the requirements of technical regulations other regulations and project documentation Verification of the completed construction of the capital construction facility "The first stage of construction according to the project Arrangement of the Kharyaginsky fields Turn 4A and 4B Arrangement of expansion of the well cluster EP1 Adjustment" on the basis of the notice of completion of construction reconstruction and overhaul of the capital construction facility dated 25092018 OA5693 Verification of compliance by a legal entity with the requirements of legislation on urban development environmental legislation sanitary norms and rules fire safety regulations industrial safety requirements including requirements for energy efficiency and equipment of the capital construction facility "The first stage of construction under the project is the development of the Kharyaginsky field, Stages 4A and 4B, the arrangement of the expansion of the well cluster EP1 Adjustment" Stage 4A and 4B, the arrangement of the expansion of the well cluster EP1 Adjustment" with metering devices for used energy resources Meeting the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 291801911451
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-23, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of the completed works and the construction materials used at the capital construction facility "High-pressure water pipeline from the CPS to the bush EP2 DN200 30 stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and design documentation Verification of the completed construction of the capital construction facility "High-pressure water pipeline from the CPS to the bush EP2 DN200 30 stage of construction" on the basis of notices on completion of construction reconstruction and capital repairs of the capital construction facility dated 25092018 OA4932 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules of fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "High-pressure water pipeline from the CPS to the bush EP2 DN200 30 stage of construction" with metering devices the energy resources used Correspond to the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of the work performed, to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and to the requirements of equipment of the capital construction facility "High-pressure water pipeline from the CPS to the bush EP2 DN200 30 stage of construction" metering devices for used energy resources comply with the requirements of Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 291801911427
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 291801911407
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 291801911388
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 291801911370
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 291801911352
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 291801911325
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-23, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "1st stage of construction arrangement of the well cluster EP2" as well as the results of such work with the requirements of technical regulations, other normative acts and project documentation Verification of the completed construction of the capital construction facility "1st stage of construction arrangement of the well cluster EP2" on the basis of a notice of completion of construction reconstruction of capital repairs of the facility capital construction from 25092018 OA493401 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "1st stage of construction arrangement of the well cluster EP2" with metering devices for energy resources used Compliance of the work performed and the construction materials used in the process the construction of the capital construction facility as well as the results of the work performed to the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility "Stage 1 of construction arrangement of the well cluster EP2" with metering devices for used energy resources compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code the Code of the Russian Federation


# 83170803009529
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority:
Purpose of inspection:


# 83170802959080
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 83170802959022
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority:
Purpose of inspection:


# 83170802958899
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority:
Purpose of inspection:


# 83170802958980
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Arrangement of the Kharyaginsky field Turn 4 Expansion of the EP2 bush Site preparation" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of the completed construction of the capital construction facility "Arrangement of the Kharyaginsky field Turn 4 Expansion of the EP2 bush Site preparation" on the basis of a notice of completion of construction reconstruction and overhaul of the capital construction facility dated 23112017 OA4386 Verification of work in accordance with paragraph 2 of the Program of verification of compliance by a legal entity with the requirements of legislation on urban development environmental legislation sanitary norms and rules fire safety rules industrial safety requirements including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of the Kharyaginsky field Turn 4 Expansion EP2 bush Site preparation" with metering devices for energy resources used, Compliance of the construction materials used during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Arrangement of the Kharyaginsky field Turn 4 Expansion of the EP2 bush Site preparation" with metering devices for energy resources used, Fulfillment of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation


# 83170802958852
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 83170802958738
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 83170701737491
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-07, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Expansion of the commercial oil node at the CPS 62 stage of construction" as well as the results of such work with the requirements of technical regulations, other regulations and design documentation Verification of the completed construction of the capital construction facility "Expansion of the commercial oil node at the CPS 62 stage of construction" on the basis of a notice of completion of construction reconstruction of capital repairs of the capital construction facility from 19062017 OA19401 Verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Expansion of the commercial oil hub at the CPS 62 stage of construction" with metering devices for used energy resourcesconformity of applied building materials during the construction of the capital construction facility, as well as the results of the work performed, the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and equipment requirements of the capital construction facility "Expansion of the commercial oil hub at the CPS 62 stage of construction" with metering devices for energy resources used, Compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.