Found 50 inspections:

# 142005138045
Unscheduled inspection
Start date: 2020-09-30, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 00170802761940
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00170701908476
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 nalichie razresheniya na stroitelstvo3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF nalichie svidetelstva o dopuske k rabotam po stroitelstvu rekonstrukcii kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstva v tom chisle svidetelstva o dopuske k rabotam po organizacii stroitelstvo v sluchae privlecheniya zastroischikom ili tehnicheskim zakazchikom na osnovanii dogovora fizicheskogo ili yuridicheskogo lica


# 00170701489657
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-04-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 142101522128
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 142101522116
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-24, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: summary, prevention, identification and suppression of violations of the legislation on urban development, including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor); compliance with information the information contained in the notification of the commencement of certain types of entrepreneurial activity, mandatory requirements; compliance with the information contained in the application and documents of a legal entity or individual entrepreneur for the provision of legal status, a special permit (license) for the right to carry out certain types of activities or permission (approval) to carry out other legally significant actions, if the relevant unscheduled verification of a legal entity, an individual entrepreneur is provided for by the rules for granting legal status, special permission (license), issuance of permission (approval) to mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other federal information resources; compliance with the instructions of state bodies control (supervision), municipal control bodies; holding events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm


# 142101522011
Unscheduled inspection
Start date: 2021-11-23, end date: 2021-12-20, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: summary, prevention, identification and suppression of violations of the legislation on urban development, including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor); compliance with information the information contained in the notification of the commencement of certain types of entrepreneurial activity, mandatory requirements; compliance with the information contained in the application and documents of a legal entity or individual entrepreneur for the provision of legal status, a special permit (license) for the right to carry out certain types of activities or permission (approval) to carry out other legally significant actions, if the relevant unscheduled verification of a legal entity, an individual entrepreneur is provided for by the rules for granting legal status, special permission (license), issuance of permission (approval) to mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities, the unified state register of individual entrepreneurs and other federal information resources; compliance with the instructions of state bodies control (supervision), municipal control bodies; holding events: to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable, including unique, documents of the Archival Fund of the Russian Federation, documents, of special historical, scientific, cultural significance, which are part of the national library fund; to prevent the occurrence of emergency situations of a natural and man-made nature; to ensure the security of the state; to eliminate the consequences of causing such harm


# 142100773090
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:


# 142100711289
Unscheduled inspection
Start date: 2021-09-16, end date: 2021-10-13, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v svyazi s postupivshim v Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya) izvescheniem № 005-21 ot 20 avgusta 2021 goda (vh.№6159 ot 20.08.2021), , soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami; sootvetstvie svedenii, soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti, obyazatelnym trebovaniyam; sootvetstvie svedenii, soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa, specialnogo razresheniya (licenzii) na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya (soglasovaniya) na osuschestvlenie inyh yuridicheski znachimyh deistvii, esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica, individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa, specialnogo razresheniya (licenzii), vydachi razresheniya (soglasovaniya) obyazatelnym trebovaniyam, a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah, soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic, edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah; vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya; provedenie meropriyatii: po predotvrascheniyu prichineniya vreda zhizni, zdorovyu grazhdan, vreda zhivotnym, rasteniyam, okruzhayuschei srede, obektam kulturnogo naslediya (pamyatnikam istorii i kultury) narodov Rossiiskoi Federacii, muzeinym predmetam i muzeinym kollekciyam, vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii, osobo cennym, v tom chisle unikalnym, dokumentam Arhivnogo fonda Rossiiskoi Federacii, dokumentam, imeyuschim osoboe istoricheskoe, nauchnoe, kulturnoe znachenie, vhodyaschim v sostav nacionalnogo bibliotechnogo fonda; po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; po obespecheniyu bezopasnosti gosudarstva; po likvidacii posledstvii prichineniya takogo vreda


# 142100362106
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: 1) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation), including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2) availability of a construction permit; 3) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation. According to the inspection program


# 142100141256
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-17, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: proverki v svyazi s postupivshim v Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya) izvescheniem № 005-21 ot 23 marta 2021 goda (vh.№1803 ot 23.03.2021): a) sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; b) ustraneniya zastroischikom, tehnicheskim zakazchikom, licom, osuschestvlyayuschim stroitelstvo, vyyavlennyh pri provedenii stroitelnogo kontrolya i osuschestvlenii gosudarstvennogo stroitelnogo nadzora vseh narushenii sootvetstviya vypolnennyh rabot trebovaniyam normativnyh pravovyh aktov i proektnoi dokumentacii; v) oformleniya ispolnitelnoi dokumentacii, svyazannoi s vypolneniem vseh rabot po stroitelstvu, a takzhe primeneniem stroitelnyh materialov (izdelii), preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (dalee - podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii, soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami; sootvetstvie svedenii, soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti, obyazatelnym trebovaniyam; sootvetstvie svedenii, soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa, specialnogo razresheniya (licenzii) na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya (soglasovaniya) na osuschestvlenie inyh yuridicheski znachimyh deistvii, esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica, individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa, specialnogo razresheniya (licenzii), vydachi razresheniya (soglasovaniya) obyazatelnym trebovaniyam, a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah, soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic, edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah; vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya;


# 142100026886
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 142005260005
Unscheduled inspection
Start date: 2020-12-14, end date: 2021-01-18, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 142005255796
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration:
Authority:
Purpose of inspection:


# 142005214624
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 142005255761
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 142005190789
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-11, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 142005195339
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-26, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 142005195337
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-26, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 142004468609
Unscheduled inspection
Start date: 2020-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 142004451922
Unscheduled inspection
Start date: 2020-07-16, end date: 2020-07-24, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141903527780
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-10-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor) 1 compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902771829
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor) 1 compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141902570211
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141802323166
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141802133384
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141801990145
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-11-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141801974095
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-11-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 141801990246
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-11-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 141801756592
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170802976469
Unscheduled inspection
Start date: 2017-12-13, end date: 2018-01-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170802815533
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-12-05, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 14170802871161
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-12-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and design documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802761940
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802512510
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-10-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00170701908476
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom dalee podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya1 sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 nalichie razresheniya na stroitelstvo3vypolnenie trebovanii chastei 236 stati 52 Gradostroitelnogo kodeksa RF nalichie svidetelstva o dopuske k rabotam po stroitelstvu rekonstrukcii kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstva v tom chisle svidetelstva o dopuske k rabotam po organizacii stroitelstvo v sluchae privlecheniya zastroischikom ili tehnicheskim zakazchikom na osnovanii dogovora fizicheskogo ili yuridicheskogo lica


# 14170701755258
Unscheduled inspection
Start date: 2017-07-05, end date: 2017-07-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14170701755215
Unscheduled inspection
Start date: 2017-07-05, end date: 2017-07-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14170701755181
Unscheduled inspection
Start date: 2017-07-05, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701758373
Unscheduled inspection
Start date: 2017-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701758359
Unscheduled inspection
Start date: 2017-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701489657
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-04-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 00170701324242
Unscheduled inspection
Start date: 2017-01-26, end date: 2017-02-06, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160701204643
Unscheduled inspection
Start date: 2016-12-08, end date: —, duration:
Authority:
Purpose of inspection:


# 14160701228009
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14160701069693
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-12-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14160701024868
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-11-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to work on construction reconstruction that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or a technical customer on the basis of an agreement between an individual or a legal entity


# 14160701036437
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-11-09, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Zaschita prav i interesov rabotnikov v svyazi s postupleniem informacii o dopuschenii narushenii Trudovogo zakonodatelstva


# 14160700155700
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-10-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160601716641
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-08-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.