Found 12 inspections:

# 112100152394
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-04-19, duration: 5
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: establish the fulfillment of the order of the Naryan-Mar territorial department of the Pechora Department of Rostechnadzor No. 25-09/30/20 , the deadline for which has expired. The objectives of this audit are: to establish the elimination of the identified violations specified in the regulations of the Naryan-Mar territorial department of the Pechora Department of Rostechnadzor No. 25-09/30/20 , the deadline for which has expired.


# 292005168398
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-07, duration: 4
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: determination of the possibility of fulfillment by the licensee of NGK Gorny LLC of licensing requirements in connection with the appeal of NGK Gorny LLC from 09092020 bn to the Federal Service for Environmental Technological and Nuclear Supervision in order to reissue the license from 18032013 VP00014005 for the type of activity for the operation of explosive and chemically hazardous production facilities of hazard classes I II and III in due to a change in the legal address of the organization with a change in the list of works performed that constitute a licensed type of activity with the exception of the address of the place of implementation of the licensed type of activity for the operation of explosive and chemically hazardous production facilities of hazard classes I II and III by type of work services transportation of flammable oxidizing combustible explosive toxic and highly toxic substances and substances that pose a danger to the environment at the facilities


# 292004477784
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 292004362646
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-05, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the compliance of the completed works and the construction materials used at the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center stage 2 construction" as well as the results of such work with the requirements of technical regulations, other regulations and project documentation Verification of the completed construction of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center stage 2 construction" on the basis of a notice of completion construction of a capital construction facility from 25022020 320G Task verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center stage 2 construction" with metering devices for energy resources used, the conformity of work performed and applied construction materials during the construction of the capital construction facility, as well as the results of the work performed, the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center 2 stage of construction" with metering devices for used energy resources meeting the requirements of parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation


# 292004362466
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-05, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials at the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center 1st stage of construction" as well as the results of such work with the requirements of technical regulations other regulations and design documentation Verification of the completed construction of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center 1st stage of construction" on the basis of a notice of completion construction of a capital construction facility from 25022020 220G Tasks verification of compliance by a legal entity with the requirements of legislation on urban planning, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center 1st stage of construction" with metering devices for energy resources used, the conformity of work performed and applied construction materials during the construction of the capital construction facility as well as the results of the work performed to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and to the requirements for equipping the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field Energy Center 1st stage of construction" with metering devices for used energy resources meeting the requirements of parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation


# 291800696736
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 291800685126
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of verification of compliance of work performed and used building materials at the facility cap Stra "construction of trial operation Severoamerikanskih oil field Pipeline external transport of oil from the installation of the preliminary water UPSV Severoamerikanskih deposits to the site acceptance para PSP "Draw" as well as the results of such work requirements those regulations regulations and project documentation, the Inspection of the finished Strom object Stra cap "construction of trial operation Severoamerikanskih oil field Pipeline external transport of oil from the installation of the preliminary water UPSV Severoamerikanskih deposits to the site acceptance para PSP "Draw" on the basis of Izzy about the end Stra recei cap repair of the object of cap strv from 10092018 718Г scan Task run Yul legislation grad activities of the environmental legislation of sanitary norms and rules regulations amp safety requirements of industrial safety, including the requirements of energy efficiency and equipment of the property Stra cap "construction of trial operation Severoamerikanskih oil field Pipeline external transport of oil from the installation of the preliminary water UPSV Severoamerikanskih deposits to the site acceptance para PSP "Draw" metering devices of energy resources Subject to compliance with legislation on town-planning activities consistent application of building materials in the process of reconstruction of capital construction object and the results of work performed to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object "Construction"Draw" metering devices of energy resources used to meet the requirements of CH 2 and 3 of article 52 of Hardcodes Russia


# 291800281619
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration:
Authority: Pechorskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance of completed works and applied building materials at the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field, stage 1 of construction" as well as the results of such work with the requirements of technical regulations, other normative acts and project documentation Verification of the completed construction of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field, stage 1 of construction" on the basis of a notice of completion of construction of the capital reconstruction repair of the capital construction facility from 20022018 118 Verification of compliance by a legal entity with the requirements of legislation on urban development, environmental legislation, sanitary norms and rules, fire safety rules, industrial safety requirements, including requirements for energy efficiency and equipment of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field 1st stage of construction" with metering devices for used energy resources Compliance with mandatory requirements of legislation on urban development compliance of the applied building materials during the construction of the capital construction facility as well as the results of the work performed with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility "Arrangement of trial operation of the Severomukerkamylkskoye field 1st stage of construction" with metering devices for energy resources used compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 11170701529708
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-29, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Komi i Neneckomu avtonomnomu okrugu
Purpose of inspection: this check is carried out in order to verify the possibility of the license applicant fulfilling the licensing requirements and conditions when carrying out waste collection transportation and treatment in accordance with the application for renewal of the license from 08022017 the tasks of this check are the implementation of license control over the licensee in the implementation of waste collection transportation and treatment activities 7 The subject of this check is the information contained in the documents of the licensee establishing its organizational and legal form rights and obligations are documents used in the implementation of its activities and related to the fulfillment of its mandatory requirements


# 83170701296667
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-02-13, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Neneckomu avtonomnomu okrugu
Purpose of inspection: Objectives supervision of the implementation of LLC NGK Gorny notification Rosnedra EC033115137 dated 25122015 on violations of the terms of use of subsoil under license NRM 14881 NE granted for exploration and production of hydrocarbons within the Nerutynskoye field and possible early termination of the right to use subsoil tasks prevention detection and suppression of violations by a legal entity, its managers and other officials of the requirements established by federal laws laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, subject to verification of compliance with the instructions of state control and supervision bodies


# 83160701097685
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-30, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Neneckomu avtonomnomu okrugu
Purpose of inspection: The purpose of verifying compliance with the regulations on the elimination of identified violations of mandatory requirements is Order 39 dated 22102015 NRM 14881 NE "To conduct 3D seismic exploration in the amount of at least 150 km2 at the Nerutynskoye field" by 01122016 Order 40 dated 22102015 NRM 14881 NE "To carry out the construction of an exploration well at the Nerutynskoye field" by 01122016 Task prevention detection and suppression of violations by legal entities by a person, his managers and other officials of the requirements established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, subject to verification of compliance with the instructions of state control and supervision bodies


# 83150601132880
Unscheduled inspection
Start date: 2015-10-07, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.