Found 73 inspections:

# 242101326404
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 216 dated 02.11.2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101356908
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 238 dated 11/15/2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development activities, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101209425
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 175 dated 06.10.2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101214822
Unscheduled inspection
Start date: 2021-10-08, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: verifying the fulfillment of the previously issued to the person being checked instruction No. 148-DS dated 09/08/2021 on the elimination of identified violations, the deadline for which expired on 10/07/2021, (reasoned submission dated 10/07/2021 No. 239); The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is: compliance with the mandatory requirements established by Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and other regulatory legal acts of the Russian Federation adopted in accordance with it.


# 242101158848
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 167 dated 09/28/2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101158813
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: implementation of regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification (No. 164 dated 09/28/2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101044021
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 242100951560
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 242100848827
Unscheduled inspection
Start date: 2021-09-24, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 152 dated 09/16/2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101147106
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100361903
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 242100454184
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: verification of the execution of the order No. 105-DS dated 07/05/2021 on the elimination of identified violations, which expired on 08/04/2021, previously issued to the person being checked (reasoned submission No. 143 dated 08/09/2021); The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is: compliance with the mandatory requirements established by Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and other regulatory legal acts of the Russian Federation adopted in accordance with it.


# 242100577937
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: 6. To establish that this inspection is carried out for the purpose of: verifying the fulfillment of the previously issued to the person being checked order No. 104-DS dated 30.06.2021 on the elimination of identified violations, the deadline for which expired on 30.08.2021, (reasoned submission dated 08/27/2021 No. 171); The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is: compliance with the mandatory requirements established by Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared-Equity Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and other regulatory legal acts of the Russian Federation adopted in accordance with it.


# 242100515310
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100515347
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100494640
Unscheduled inspection
Start date: 2021-08-20, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1411-ONS-1 dated 06/17/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/19/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100349614
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100264782
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted for the purpose of state control and supervision in the field of shared-equity construction of apartment buildings and (or) other real estate objects based on the identification of signs of violation of mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and (or) other real estate objects during the analysis of the project declaration (reasoned submission based on the results of the preliminary audit dated 05/31/2021 No. 96); The objectives of this audit are: prevention, detection and suppression of violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and (or) other real estate objects. 7. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 242100264794
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration:
Authority:
Purpose of inspection:


# 242100249239
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration:
Authority:
Purpose of inspection:


# 242100171059
Unscheduled inspection
Start date: 2021-04-22, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 52 dated 04/06/2021) on the start of construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy used resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100058596
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-31, duration: 15
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program of 03/09/2020 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100025259
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-26, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 3717-ons-1, previously issued to the person being checked, dated January 28, 2020, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/23/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242005151388
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242004522200
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004454356
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-08-07, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: the implementation of regional state construction supervision during the construction of the specified capital construction facility on the basis of notification 94 received from 06072020 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including project documentation7 The subject of this audit is71 Checking the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation. the Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, all acts regulations notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code are subject to verification Of the Russian Federation73 Checking the availability of a building permit


# 242004401352
Unscheduled inspection
Start date: 2020-04-23, end date: 2020-05-26, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice 138 dated 16042020 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including project documentation


# 242004401341
Unscheduled inspection
Start date: 2020-04-23, end date: 2020-05-26, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 137 dated 16042020 on the start of construction of the capital construction facility, the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including project documentation


# 242004342129
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-04-07, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification No. 25 dated 03032020 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including project documentation


# 242004237561
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-02-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this audit is carried out for the purpose of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the identification during the analysis of the developer's quarterly reports on activities related to attracting funds from participants in shared-equity construction for the construction of apartment buildings and or other real estate objects of signs of violation of mandatory requirements motivated by the results preliminary inspection dated 24/12/2019 349 the objectives of this inspection are to prevent identify and suppress violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate


# 241903990687
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 25092019 2558C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/122019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241904146440
Unscheduled inspection
Start date: 2019-12-13, end date: 2020-01-31, duration: 17
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 28052018 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 241903966109
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-12-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification No. 239 dated 07112019 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation


# 241903887411
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: implementation of regional state construction supervision during the construction of the specified capital construction facility based on the received notice 215 dated 16102019 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903871258
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission by Elena Anatolyevna Zhurbenko, Deputy Head of the Shared-equity Supervision Department, dated 01102019 304 on violations of mandatory disclosure requirements by the developer in the Unified Housing Information Systemthe objectives of this audit are to prevent identify and suppress violations of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 241903924433
Unscheduled inspection
Start date: 2019-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 241903824615
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 25092019 2558C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903630848
Unscheduled inspection
Start date: 2019-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803485288
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 16052017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803485261
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803476898
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-09-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 142 dated 07082019 on the completion of the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the construction materials used during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and design documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification by all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation verification of a building permit


# 24190803439442
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-07-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked Regulation No. 1065OZHS dated 29042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803431223
Unscheduled inspection
Start date: 2019-06-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803431251
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 1035OZHS dated 25042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period established by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 241902762787
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission by Elena Anatolyevna Zhurbenko, Deputy Head of the Department for Supervision of Shared-equity Construction, dated 21052019 125the objectives of this audit are to prevent identify and suppress violations of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects. The purpose of the audit is to comply with the mandatory requirements and or requirements established by municipal legal acts


# 24190803380122
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 301/12017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803380120
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 16052017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803386624
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility based on the received notification 47 dated 26032019 on the start of construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is to verify the compliance of the work and the construction materials used during the construction of the facility capital construction, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, verification of a construction permit


# 24190803361277
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31102017 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803361287
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 15112017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803382460
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-25, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility based on the received notification 42 dated 21032019 on the start of construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is to verify the compliance of the work and the construction materials used during the construction of the facility capital construction, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, verification of a construction permit


# 241802086017
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 241801760502
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 253 dated 25092018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping a capital construction facility with metering devices for used energy resources 72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code Code of the Russian Federation 73 Checking the availability of a building permit


# 241801928614
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-11-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 177 dated 05102018 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with the works and construction materials used during the construction of an investment facility, as well as the results of such work, are subject to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping an investment facility with metering devices for used energy resources. All acts prescriptions notices on the elimination of violations and deficiencies identified during implementation of regional state construction supervision 72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of building permits


# 241800859556
Unscheduled inspection
Start date: 2018-09-06, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800901944
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-10-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 228 dated 30082018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit


# 241800627015
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-09-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of received notification No. 209 dated 08082018 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this inspection is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit


# 241800508800
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802906134
Unscheduled inspection
Start date: 2017-11-29, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802855106
Unscheduled inspection
Start date: 2017-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802764062
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-11-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 18102017 bx 237 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation7 The subject of this inspection is71 Verification of the conformity of work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


# 24170802763986
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-11-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 17102017 bx 236 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and design documentation, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used, Verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


# 24170802781888
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802563300
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 21082017 3284OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28092017the objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional state construction supervision The inspection period is 10 working days


# 24170701820477
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701667956
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-07-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This unscheduled inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 30052017 bx 124 on the completion of the construction of the capital construction facility. The objectives of this unscheduled inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, to verify the compliance of the work and the applicable construction materials during the construction of a capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification of all acts regulations notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision, Checking the availability of a construction permit, Checking the availability of certificates of admission to the types of work on the construction of a capital construction facility that affect the safety of a capital construction facility


# 24170701609816
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-06-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the notification received from 03052017 bx 92 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation7 The subject of this inspection is71 Verification of the conformity of work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


# 24170701529080
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-05-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification from 06042017 vx 77 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


# 24170701570726
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This unscheduled inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the notification received from 20042017 bx 81 on the completion of the construction of the capital construction facility. The objectives of this unscheduled inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation, to verify the compliance of the work and the applicable construction materials during the construction of a capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification of all acts regulations notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision, Checking the availability of a construction permit, Checking the availability of certificates of admission to the types of work on the construction of a capital construction facility that affect the safety of a capital construction facility


# 24170701493212
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15102015 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, and to verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that provide impact on the safety of a capital construction facility


# 24170701350243
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-03-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This unscheduled inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 25.012017 bx 19 on the completion of the construction of the capital construction facility. The objectives of this unscheduled inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and design documentationconfirming the compliance of the work and the applied construction materials during the construction of the capital construction facility as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, are subject to verification of all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, Verification of the certificate of admission to the types of work for the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701346374
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-03-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 23.012017 10NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification dated 25.012017 vx 5 on the elimination of violations before the expiration of the period specified in the prescriptionthe objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures


# 24150600660829
Unscheduled inspection
Start date: 2015-07-31, end date: 2015-08-27, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Krasnoyarskomu krayu
Purpose of inspection: ensuring consumer protection


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.