# 002005257902
Unscheduled inspection
Start date: 2020-12-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005257913
Unscheduled inspection
Start date: 2020-12-03, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005199364
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005199352
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005201223
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-23, duration: 18
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the fulfillment of the instruction from 10072020 16133323401016PR213 in accordance with the notice on the elimination of violations from 12102020 12UD vh 24033915 from 13102020the tasks of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including project documentation Inspections are the fulfillment of the requirements of the state construction control and supervision bodies
# 002005201254
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-23, duration: 18
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the fulfillment of the instruction from 10072020 16133223391015pr212 in accordance with the notice on the elimination of violations from 12102020 11UD vh 24033915 from 13102020the tasks of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including project documentation Inspections are the fulfillment of the requirements of the state construction control and supervision bodies
# 002004431248
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-07-10, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 20012020 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902983944
Unscheduled inspection
Start date: 2019-08-28, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902811482
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po SeveroZapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: verification of the information specified in the address of a citizen of the Russian Federation dated 04062019 190604419754 The objectives of this audit are to take measures to prevent and prevent violations of mandatory requirements in the field of transport safety and to bring persons who have committed violations to responsibility provided for by current legislation
# 001902478227
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-28, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the fulfillment of a previously issued prescription
# 001902549720
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-03-26, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: criteria for accreditation of IL
# 001802127000
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-15, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka
Purpose of inspection: The purpose of the audit is to assess the compliance of information with licensing requirements The task of the audit is to identify suppress and prevent violations of legislation in the field of ensuring sanitary and epidemiological well-being of a person The subject of the audit is compliance with mandatory requirements established by Federal Law No. 99 FZ of May 4, 2011 and Decree of the Government of the Russian Federation dated April 2, 2012 278
# 001802180458
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-11-27, duration: —
Authority: BaltiiskoArkticheskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification is done to prevent prejudice to the rights, legitimate interests to the life or health of citizens, the environment, the cultural heritage monuments of history and culture of the peoples of the Russian Federation defence and state security, the possibility of the application of which is associated with the implementation of legal entities and individual entrepreneurs of certain types of activities Objectives of this review are to prevent detection and suppression of violations of the legal entity, its leader and other officials of the individual entrepreneur, his authorized representatives of the legal entity the individual entrepreneur of the requirements established by the Federal law "On licensing certain types of activities" from 04052011 99 FZ other Federal laws adopted in accordance with them other normative legal acts of the Russian Federation, the Compliance of the licensee with these requirements is a prerequisite for the grant of the license the licensee compliance with the mandatory implementation of the licensed activity of the Subject of this review is the compliance of the information contained in the statement and the documents of the legal entity or the individual entrepreneur on the legal status of a special permit of license to conduct certain types of activities or resolution of approval for the implementation of other legal actions if the conducting unscheduled inspections of the legal entity the individual entrepreneur provided the rules for the provision of the legal status of a special permit a license authorizing approval of the mandatory requirements and also data about these entities and individual entrepreneurs contained in the unified state register of legal entities and the unified state register of individual entrepreneurs and other Federal information resources
# 001800231276
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: BaltiiskoArkticheskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection:
# 001800021276
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-26, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po SeveroZapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: execution of the order of the Deputy Chairman of the Government of the Russian Federation VL Mutko dated 27112017 VMP97920 and the order of the Deputy Minister of Transport of the Russian Federation NU Zakhryapin dated 30112017 K1051629DSP
# 00170802955470
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-28, duration: —
Authority: BaltiiskoArkticheskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of the fulfillment of the previously issued regulation VD175132 of 20092017, the deadline for which expires on 01122017
# 00170802975911
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802411297
Unscheduled inspection
Start date: 2017-09-13, end date: —, duration: —
Authority: BaltiiskoArkticheskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection:
# 00170701525054
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po SeveroZapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: control supervision of the activities of a legal entity to ensure transport security in accordance with paragraphs 3 to 4 of Article 111 of Federal Law No. 09022007 16 FZ On Transport Security
# 00170701484770
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-28, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: criteria for accreditation of IL
# 00170701497840
Unscheduled inspection
Start date: 2017-03-23, end date: —, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka
Purpose of inspection: The purpose of the audit is to assess the compliance of information with licensing requirements The task of the audit is to identify suppress and prevent violations of legislation in the field of ensuring sanitary and epidemiological well-being of a person The subject of the audit is compliance with mandatory requirements established by Federal Law No. 99 FZ of May 4, 2011 and Decree of the Government of the Russian Federation dated April 2, 2012 278
# 00170701497839
Unscheduled inspection
Start date: 2017-03-23, end date: —, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka
Purpose of inspection:
# 00160701160503
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-21, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po SeveroZapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: supervision of the activities of a legal entity to ensure transport security
# 782101419237
Unscheduled inspection
Start date: 2021-12-21, end date: —, duration: 1
Authority: Gosudarstvennaya administrativno-tehnicheskaya inspekciya
Purpose of inspection: execution of the GATI regulation No. 81561 dated 01/29/2016
# 782101419484
Unscheduled inspection
Start date: 2021-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782101419282
Unscheduled inspection
Start date: 2021-12-21, end date: —, duration: 1
Authority: Gosudarstvennaya administrativno-tehnicheskaya inspekciya
Purpose of inspection: execution of the GATI regulation No. 81579 dated 01/29/2016
# 782101419428
Unscheduled inspection
Start date: 2021-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002100303851
Unscheduled inspection
Start date: 2021-06-16, end date: —, duration: 10
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Severo-Zapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: control and supervision of the activities of a legal entity to provide TB according to a reasoned submission dated 06/02/2021 No.07-07/2628
# 782100324625
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v gorode Sankt-Peterburge
Purpose of inspection: implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms
# 782100304244
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100254746
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated December 23, 2019 2-3-25/1/1 , the deadline for which expires on 06/01/2021 inclusive (the deadline for elimination is based on the letter of the Ministry of Emergency Situations of Russia for St. Petersburg No. 7416-2-3-11-686 dated 04/20/2020 – until 06/01/2021),
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100250180
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated December 23, 2019 2-3-24/1/1 , the deadline for which expires on 06/01/2021 inclusive (the deadline for elimination is based on the letter of the Ministry of Emergency Situations of Russia for St. Petersburg No. 7416-2-3-11-686 dated 04/20/2020 – until 06/01/2021),
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100254770
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100215666
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: the inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 10/22/2020 no. 2-3-69/1/1 the deadline for which has expired (the deadline for elimination is 04.05.2021),
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements. The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100215635
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: The inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated December 09, 2019 2-3-19/1/1 , the deadline for which has expired (the deadline for elimination is based on the letter of the Ministry of Emergency Situations of Russia for St. Petersburg No. 7416-2-3-11-686 dated 04/20/2020 – until 05/04/2021) The
objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100215594
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: the inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 02/05/2020 no. 2-3-11/1/1 , the deadline for which has expired (the deadline for elimination is based on the letter of the Ministry of Emergency Situations of Russia for St. Petersburg No. 7416-2-3-11-686 dated 04/20/2020 – until 05/04/2021)
The objectives of this inspection are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100215548
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: the inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 06.12.2019 no. 2-3-18/1/1 , the deadline for which has expired (the deadline for elimination is based on the letter of the Ministry of Emergency Situations of Russia for St. Petersburg No. 7416-2-3-11-686 dated 04/20/2020 – until 05/04/2021) The
objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100194760
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-09, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Sankt-Peterburge
Purpose of inspection: implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt of information from an official of the State Labor Inspectorate in the city of St. Petersburg on the facts of violations by the employer of labor legislation and other regulatory legal acts containing labor law norms, including labor protection requirements that caused the threat of harm to the life and health of employees
# 782100128527
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-05, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: To establish that:
This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/17/2020 no. 2-3-17/1/1 the deadline for which has expired (the deadline for elimination is 03/31/2021),
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100076095
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-04-14, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 10/22/2019 no. 2-3-1/1/1 , the deadline for which has expired (the deadline for elimination is based on the letter of the Ministry of Emergency Situations of Russia for St. Petersburg No. 7416-2-3-11-686 dated 04/20/2020 – 03/01/2021) The
objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100076152
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-04-14, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/19/2020 no. 2-3-18/1/1 the deadline for which has expired (the deadline for elimination is 03/02/2021),
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100076116
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-04-14, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/19/2020 no. 2-3-19/1/1 the deadline for which has expired (the deadline for elimination is 03/02/2021),
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782000045320
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-04-06, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/17/2020 no. 2-3-14/1/1 the deadline for which has expired (the deadline for elimination is 03/01/2021),
the objectives of this audit are:
- identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782000045389
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-04-06, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: The inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/17/2020 no. 2-3-16/1/1 , the deadline for which expires on 03/01/2021.
The objectives of this inspection are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 782100045480
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-04-01, duration: 20
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this review is:
-control of the activities of legal entities/individual entrepreneurs in compliance with the requirements of legislation on urban planning, mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program dated 08/31/2020 No. b/n
The objectives of this review are:
- monitoring compliance by legal entities (individual entrepreneurs) with the requirements of legislation on urban development, mandatory norms and rules;
- prevention, detection and suppression of violations of legislation on urban development, including project documentation.
The subject of this review is:
-compliance with the mandatory requirements of the legislation on urban development;
- compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used;
-availability of a building permit;
-compliance by persons engaged in construction with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
compliance with the instructions of the state control (supervision) bodies;
# 782100045432
Unscheduled inspection
Start date: 2021-03-05, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: the inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/17/2020 no. 2-3-15/1/1 the deadline for which has expired (the deadline for elimination is 03.01.2021)
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements
The subject of this audit is:
– compliance with fire safety requirements at the protection facility used (operated) by the organization in the course of its activities.
# 782100045452
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: The inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 02/28/2020 2-3-8/1/1 the deadline for which has expired (the deadline for elimination is 02/28/2021)
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements
The subject of this audit is:
– compliance with fire safety requirements at the protection facility used (operated) by the organization in the course of its activities.
# 782100035701
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-31, duration: —
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control (supervision) bodies
# 782100007102
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100007077
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100006983
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782105316679
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-02-18, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Sankt-Peterburgu
Purpose of inspection: To establish that:
This inspection is carried out in order to: control the elimination of violations of fire safety requirements specified in the regulation on the elimination of violations of fire safety requirements dated 03/12/2020 no. 2-3-21/1/1 the deadline for which has expired (the deadline for elimination is until 01/21/2021)
the objectives of this audit are:
– identification, suppression and prevention of possible violations of fire safety requirements;
– implementation of systematic monitoring of compliance with fire safety requirements.
The subject of this audit is:
– compliance with fire safety requirements (compliance with the instructions of the state fire supervision authority).
# 002105329138
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-15, duration: 20
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Severo-Zapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Objectives- execution of the order of the First Deputy Chairman of the Government of the Russian Federation A. Belousov dated 12/14/2020 No.AB-P9-16418
The tasks are to take measures to prevent and prevent violations of mandatory requirements in the field of ensuring transport security and to bring those who committed violations to responsibility provided for by current legislation.
The subject is compliance with mandatory requirements and (or) requirements established by municipal legal acts
# 782005255528
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005255560
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005255549
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005257902
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-15, duration: 9
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this validation are verification of the activities of legal licengineering entrepreneurs on compliance with legislation on town-planning of binding rules and regulations during the reconstruction of the object of capital construction in accordance with the notice about the end of reconstruction from 26112020 6 Objectives of this review are to exercise control over the observance of legal entities, individual entrepreneurs of the requirements of the legislation on town-planning of binding rules and regulations warning detection and suppression of violations of legislation on town-planning including project documentlibraries this review assessability the mandatory requirements of the legislation on town-planning dejatelnostnyj works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices used energy resourcevalue permission to stroitelstvoimoti persons engaged in the construction of the requirements of parts 2 and 3 of article 31 of 52 Urban planning code requirements bodies of state control surveillance
# 002005257913
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-15, duration: 9
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this validation are verification of the activities of legal licengineering entrepreneurs on compliance with legislation on town-planning of binding rules and regulations during the reconstruction of the object of capital construction in accordance with the notice about the end of reconstruction from 26112020 7Задачами of this review are to exercise control over the observance of legal entities, individual entrepreneurs of the requirements of the legislation on town-planning of binding rules and regulations warning detection and suppression of violations of legislation on town-planning including project documentlibraries this review assessability the mandatory requirements of the legislation on town-planning activities of the work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices used energy resourcevalue permission to stroitelstvoimoti persons engaged in the construction of the requirements of parts 2 and 3 of article 31 of 52 town planning code of Rivapalacio of the applicable legislation state control surveillance
# 782005209527
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005209740
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005209697
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005199364
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-23, duration: 20
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to control the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the notice of completion of construction dated 08102020 5 vx 24033454 dated 09102020the tasks of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules warning identification and suppression of violations of legislation on urban development activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban development activities, compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements the requirements for equipping a capital construction facility with metering devices for used energy resources do not apply either. The presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002005199352
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-23, duration: 20
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the notice of completion of construction dated 08102020 4 bx 24033454 dated 09102020the tasks of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules warning identification and suppression of violations of legislation on urban development activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban development activities, compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements the requirements for equipping a capital construction facility with metering devices for used energy resources do not apply either. The presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 232005176399
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-30, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Krasnodarskomu krayu
Purpose of inspection: control over the execution of the instruction to eliminate violations of mandatory fire safety requirements 6213 dated 28062019 state implementation, in accordance with the procedure established by the legislation of the Russian Federation, of activities to verify compliance by organizations and citizens with fire safety requirements and taking measures based on the results of this inspection, compliance with the instructions of state control bodies supervision of municipal control bodies
# 002005201223
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-23, duration: 18
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the fulfillment of the instruction from 10072020 16133323401016PR213 in accordance with the notice on the elimination of violations from 12102020 12UD vh 24033915 from 13102020the tasks of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including project documentation Inspections are the fulfillment of the requirements of the state construction control and supervision bodies
# 002005201254
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-23, duration: 18
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the fulfillment of the instruction from 10072020 16133223391015pr212 in accordance with the notice on the elimination of violations from 12102020 11UD vh 24033915 from 13102020the tasks of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including project documentation Inspections are the fulfillment of the requirements of the state construction control and supervision bodies
# 782005172652
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005172747
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005172774
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005172693
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005172669
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005172728
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782005172789
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 472004446574
Unscheduled inspection
Start date: 2020-06-30, end date: 2020-07-28, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: timely control over ensuring fire safety requirements at the facility and preparing the children's health camp for the reception of children and staff
# 002004431267
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-07-10, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 20012020 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004431248
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-07-10, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 20012020 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004374574
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-05-06, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 20012020 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004374540
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-05-06, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 20012020 BN The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 782004324007
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004318060
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004317914
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004318019
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004317829
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004318123
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004324061
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004317972
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004309422
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-17, duration: —
Authority: Territorialnyi organ Federalnoi sluzhby po nadzoru v sfere zdravoohraneniya po g SanktPeterburgu i Leningradskoi oblasti
Purpose of inspection: this check is carried out in order to verify the facts of the threat of harm to the life and health of citizens identified during the consideration of the appeal received by the Territorial Body of Roszdravnadzor in St. Petersburg and the Leningrad region of gr vh O7837420R from 17022020 upon the provision of inadequate quality of medical care to the State Unitary Enterprise "St. Petersburg Metro" motivated representation of officials of the Department of control and supervision of medical pharmaceutical activities and activities related to the trafficking of narcotic drugs and psychotropic substances of the Territorial Body of Roszdravnadzor for St. Petersburg and the Leningrad region 127 of 19022020 the objectives of this audit are to identify violations of compliance with the requirements necessary for carrying out medical activities within the framework of this appeal 7 The subject of this audit is compliance with mandatory requirements carrying out measures to prevent harm to the life and health of citizens
# 782004236045
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002004215258
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-28, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po SeveroZapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This audit is carried out in order to fulfill the instructions of the Deputy Chairman of the Government of the Russian Federation MA Akimov dated 15112019 NZD111018919THE objectives of this audit are to take measures to prevent and prevent violations of mandatory requirements in the field of transport safety and to bring persons who have committed violations to responsibility provided for by current legislation7 The purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 782004246974
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004259960
Unscheduled inspection
Start date: 2020-02-05, end date: 2020-02-18, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu SanktPeterburgu
Purpose of inspection: This audit is carried out in order to monitor compliance with mandatory requirements of legislation on sanitary and epidemiological welfare of the populationthe objectives of this audit are to monitor compliance with mandatory requirements of legislation on sanitary and epidemiological welfare of the populationthe subject of this audit is to take measures to prevent harm to the life and health of citizens harm to animals plants and the environment
# 782004163649
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-02-07, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: the inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements No. 08022018g 227511, the deadline for which has expired before 21122019. The objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this inspection is compliance with fire safety requirements at the protection facility used and operated by the organization in the course of carrying out its activities
# 782004163586
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-02-07, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: the inspection is carried out for the purpose of monitoring the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements No. 30042019 g 2274711, the deadline for which has expired before 20122019 g. The objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this inspection is compliance with fire safety requirements at the facility protection used and operated by the organization in the course of its activities
# 782004166117
Unscheduled inspection
Start date: 2020-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004166296
Unscheduled inspection
Start date: 2020-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004163539
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-02-11, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: this check is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 19072019 2277011, the deadline for which the elimination period expired before 14012020. the objectives of this check are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this check is compliance with fire safety requirements at the protection facility used and operated by the organization in the course of its activities
# 781904083808
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: the inspection is carried out for the purpose of monitoring the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 13042018 2272811, the deadline for which the deadline for elimination has expired 30112019 the tasks of this inspection are to identify suppress and prevent possible violations of fire safety requirements carry out systematic monitoring of compliance with fire safety requirements The subject of this inspection is compliance with fire safety requirements on the object of protection used and operated by the organization in the course of its activities
# 781904084576
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: the inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 20122018 2279911, the deadline for which has expired before 02122019. The objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this inspection is compliance with fire safety requirements safety at the protection facility used and operated by the organization in the course of its activities
# 781904084492
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: the inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 20122018 2279811, the deadline for which has expired before 02122019. The objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this inspection is compliance with fire safety requirements safety at the protection facility used and operated by the organization in the course of its activities
# 001904129227
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-12, duration: —
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po SeveroZapadnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: verification of the facts set out in the appeal dated 27112019 bx M219 The objectives of this audit are to take measures to prevent and suppress violations of mandatory requirements in the field of transport safety and to bring persons who have committed violations to responsibility provided for by current legislation The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts