Found 37 inspections:

# 742100368802
Unscheduled inspection
Start date: 2021-07-23, end date: 2021-07-29, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu vnutrennih inzhenernyh sistem vodosnabzheniya, kanalizacii, otopleniya, elektrosnabzheniya, ventilyacii, dymoudaleniya, sistemy pozharnoi bezopasnosti, slabotochnyh sistem, vnutrennie otdelochnye raboty, proverka blagoustroistva pridomovoi territorii i ustanovki malyh arhitekturnyh form, proverka protivopozharnyh, sanitarno-epidemiologicheskih meropriyatii, meropriyatii po obespecheniyu dostupa malomobilnyh grupp naseleniya, ustroistvo fasada zdaniya, ustroistvo blagoustroistvo territorii, posle zaversheniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100092827
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu fasada zdaniya v processe rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742005253413
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po Ustroistvu vnutrennih inzhenernyh sistem vodosnabzheniya kanalizacii otopleniya elektrosnabzheniya otdelochnyh rabot V processe proizvodstva rabot v osyah 110AE i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742005264663
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005151391
Unscheduled inspection
Start date: 2020-10-07, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004443583
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 742004437889
Unscheduled inspection
Start date: 2020-07-07, end date: 2020-07-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu kirpichnoi kladki naruzhnyh i vnutrennih sten i usilenie 1 2 etazhei ustroistvu perekrytiya 1 2 etazhei Posle zaversheniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004370433
Unscheduled inspection
Start date: 2020-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742004351909
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration:
Authority:
Purpose of inspection:


# 742004254339
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu karkasa zdaniya nizhe otmetki 000 v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004277733
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-02-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po rabotam POS ustroistvu kotlovana zavershennyi etap ustroistvu fundamenta v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902954801
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po blagoustroistvu territorii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902891357
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu KNS BLOS peskoulovitelya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902759893
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration:
Authority:
Purpose of inspection:


# 741902603720
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 741801914535
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po blagoustroistvu prilezhaschei k kompleksu territorii po ustanovke malyh arhitekturnyh form po ozeleneniyu po ustroistvu peshehodnoi zony i po montazhu vhodov i krylec vdol zritelskih tribun komandnyh domikov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741801264421
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800512877
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu vnutrennih inzhenernyh sistem ustroistvu fasadov ustroistvu svetoprozrachnyh konstrukcii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800397221
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu vnutrennih inzhenernyh sistem ustroistvu fasadov ustroistvu naruzhnyh inzhenernyh setei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800375975
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering heating systems, supply and exhaust ventilation and smoke removal for the installation of ventilation chambers on the 1st and 2nd floors in the spectator stands for the implementation of fire-fighting and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800316211
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-05-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu vnutrennih inzhenernyh sistem i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800284705
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the assembly and installation of wooden structures of command houses 11 a” 11 b” 11 c” the first and second floors and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800026732
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu vnutrennih inzhenernyh sistem otopleniya goryachego i holodnogo vodosnabzheniya kanalizacii po vnutrennei otdelke pomeschenii kommentatorskih kabin i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802976721
Unscheduled inspection
Start date: 2017-12-22, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802767765
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of a retaining wall for filling window openings of spectator stands for laying outdoor power supply and sanitation networks to spectator stands for compliance with fire-fighting and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 74170802658164
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a flat roof at the level of the rooms of commentator cabins on otm+9850 for the installation of a hinged system of ventilated facades of commentator cabins on the facade “267” and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 74170802159412
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolnyaemyh rabot po montazhu vnutrennih inzhenernyh sistem ustroistvu otdelochnyh rabot i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170701826269
Unscheduled inspection
Start date: 2017-08-03, end date: 2017-08-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu ferm s konsolnymi vyletami na otm+9850 po kamennoi kladke naruzhnyh i vnutrennih sten po ustroistvu peregorodok vtorogo etazha na otm+2300 i polov po gruntu na pervom etazhe zritelskih tribun otm0000 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701724193
Unscheduled inspection
Start date: 2017-07-06, end date: 2017-07-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of metal structures of the second tier for the device of overlapping of the subtribe space from otm+0770 to otm+5570 floor slabs under the commentator cabins of otm+6850 before the start of work on the installation of farms for the implementation of fire-fighting and sanitary epidemiological measures and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design Documentation2the presence of a building permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701635029
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu fundamentov peshehodnogo mosta po vozvedeniyu nadzemnoi chasti 1i etazh komandnyh domikov 11“v” 11“b” i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701599019
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu i ankerovke plit perekrytii 1 go etazha po kamennoi kladke sten i peregorodok 1go etazha zritelskih tribun do nachala montazha metallokonstrukcii vtorogo yarusa i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701528532
Unscheduled inspection
Start date: 2017-04-13, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701450069
Unscheduled inspection
Start date: 2017-03-23, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701386321
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The conformity of work on the installation of foundation blocks for the installation of vertical and horizontal waterproofing of spectator stands before the start of work on the installation of metal structures of the first tier and the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701280664
Unscheduled inspection
Start date: 2017-01-10, end date: 2017-01-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya montazha metallokonstrukcii dekorativnogo ograzhdeniya stenovogo ograzhdeniya razrabotka grunta ukladka truboprovodov ustroistvo kolodcev seti naruzhnoi kanalizacii K1 K2 razrabotka grunta ukladka truboprovodov nanesenie antikorrozionnoi zaschity livnevoi kanalizacii K2N razrabotka grunta ukladka truboprovodov ustroistvo teplovoi kamery seti teplosnabzheniya TS i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Soblyudenie trebovanii ch 23 st 52 Gradostroitelnogo kodeksa RF


# 74160701221977
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: opredeleniya fakticheskogo sostoyaniya obekta kapitalnogo stroitelstva


# 74160601752429
Unscheduled inspection
Start date: 2016-08-04, end date: 2016-08-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of outdoor water supply networks B2 and B3 for installation and commissioning at the VOC and KNS for the installation of entrances and porches of the ASK and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.