# 422005147249
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-06, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used in the course of work with the requirements of project documentation The purpose of this check is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility Subject to Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning activities
# 00170701319597
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-03-03, duration: —
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of the fulfillment of the previously issued Instruction from 01112016 M866 assessment of the conformity of measurements of units of quantities of standards of units of quantities of standard samples of measuring instruments in the field of state ensuring the uniformity of measurements with established requirements compliance with the instructions of state control and supervision bodies
# 422100205630
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used during the construction of a capital construction facility in Kemerovo. Construction of drainage networks and facilities in the residential districts of the Eastern Planning district", located at Kemerovo region, Kemerovo, Leninsky district, as well as the results of such work (laying sewer pipes D1000, from K1 to K20, through K5, K9, K14, K19 (length – 1962.5 m out of 2676.83 m). Installation of D1400 cases on the site K1-K2, K3-K4, K5-K6, K6-K7, K9-K10, K19-K20 (total length 252.89 m) of project documentation and verification of compliance with the requirements of parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The task of verification is compliance with the requirements of the legislation of the Russian Federation The subject of the audit is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development activities.
# 422100120581
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-27, duration: 7
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the implementation of paragraphs 1-7 of Regulation No. 24KG/01 dated 01/21/2020, issued by the Department for Supervision of Pipeline Transport, Gas Consumption and Gas Distribution Facilities of the Siberian Rostechnadzor Directorate, the deadline for which has expired.
The purpose of this inspection is to verify the elimination of violations of industrial safety requirements set out in paragraphs 1-7 of Regulation No. 24KG/01 dated 01/21/2020.
# 422105345086
Unscheduled inspection
Start date: 2021-02-04, end date: —, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection:
# 422005189432
Unscheduled inspection
Start date: 2020-08-27, end date: 2020-08-31, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: verification of the conformity of the work performed and the building materials used, the installation of a pressure-free sewer collector KK13 to KK34, the installation of a pressure sewer collector from KK48 to KK51, landscaping, as well as the results of such work, with the requirements of the design documentation and verification of compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to comply with the legislation of the Russian Federation on urban planning activities during construction The subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction
# 422004471084
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-08-05, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used in the course of work with the requirements of project documentation The purpose of this check is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility Subject to Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning activities
# 422004439690
Unscheduled inspection
Start date: 2020-06-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:
# 422004411294
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-05-28, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: verification of the conformity of the work performed and the building materials used, the installation of a pressure-free sewer collector KK13 to KK34, the installation of a pressure sewer collector from KK48 to KK51, landscaping, as well as the results of such work, with the requirements of the design documentation and verification of compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to comply with the legislation of the Russian Federation on urban planning activities during construction The subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction
# 422004270240
Unscheduled inspection
Start date: 2020-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 422004254254
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-28, duration: —
Authority: YUzhnoSibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Implementation of the previously issued order dated 16122019, the deadline for which expired on 13012020, the objectives of this audit are to assess the completeness of the previously issued order when it is revealed that the requirements of the order have not been met to take administrative action
# 421903976348
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 421903832849
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 421903803773
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-11-01, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development
# 421903291104
Unscheduled inspection
Start date: 2019-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 421902943572
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-08-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 421801756648
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-10-18, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Kuzbassa
Purpose of inspection: 1 This audit is conducted in order to verify the facts indicated in the appeal on the basis of receipt of an appeal application information from citizens legal entities public authorities local governments mass media dated 29082018 123682018 about the following facts violation of consumer rights in the case of citizens whose rights are violated 2 The objectives of this audit are to verify compliance with mandatory requirements of laws and other regulatory legal acts of the Russian Federation suppression of violations of legislation taking measures to eliminate identified violations 3 The subject of this audit is Compliance with mandatory requirements for determining the amount and payment of utility bills
# 421800460106
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-28, duration: —
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: control over the elimination of violations, the fulfillment of which is mandatory in accordance with an order previously issued to the audited person on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements
# 421800108953
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-02-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning
# 42170802807495
Unscheduled inspection
Start date: 2017-11-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 42170802735703
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-11-09, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Kuzbassa
Purpose of inspection: in order to consider citizens' appeals
# 42170701858012
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-15, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Kuzbassa
Purpose of inspection: in order to consider citizens' appeals
# 42170701766269
Unscheduled inspection
Start date: 2017-06-10, end date: 2017-07-04, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Kuzbassa
Purpose of inspection: This audit is conducted in order to consider citizens' appeals. The objectives of this audit are to verify compliance with mandatory requirements of laws and other regulatory legal acts of the Russian Federation, suppression of violations of legislation, taking measures to eliminate identified violations. The subject of this audit is compliance with mandatory requirements
# 00170701319597
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-03-03, duration: —
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of the fulfillment of the previously issued Instruction from 01112016 M866 assessment of the conformity of measurements of units of quantities of standards of units of quantities of standard samples of measuring instruments in the field of state ensuring the uniformity of measurements with established requirements compliance with the instructions of state control and supervision bodies
# 42160701130363
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-12-16, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: Verification of the execution of the order dated 24092016 306
# 42160701011356
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-11-11, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: verification of compliance with the regulation dated 28092015 313 until 20092016
# 42160700991724
Unscheduled inspection
Start date: 2016-10-07, end date: 2016-11-03, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: expiration of the deadline for the organization to comply with an order issued by the state fire supervision authority to eliminate identified violations of fire safety requirements
# 42160700811670
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-10-19, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of the previously issued regulation 13122 dated 25022016, the deadline for which has expired
# 42160601798624
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-08-31, duration: —
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: This audit is conducted with the aim of protecting the rights and interests of employees statement bx7503816OB dated 02082016 the objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms
# 42160601469985
Unscheduled inspection
Start date: 2016-01-27, end date: 2016-02-25, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of the previously issued order 93161 dated 11112014, the deadline for which has expired
# 42150600134486
Unscheduled inspection
Start date: 2015-08-28, end date: 2015-08-24, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: execution of order 641 dated 06082015